Breaking News
General Manager’s Safety Award for 10 Staff of Central Railway
क्षेत्रीय हिंदी प्रतियोगिता 2023 संपन्न
General Manager’s Safety Award for 10 Staff of Central Railway
जानिए पटरियों के साइड में क्यों लिखे होते हैं नंबर?
Two to four or so locos can usually be coupled together to operate automatically, without any special provisions, with the crew manning only one of them. (This mode of operation is known as ‘Multiple Unit’ operation, or ‘MU’.)
Using more than about 4 or 5 locos together without some form of automatic control for them is problematic because couplings come under excessive strain and break. A system known as ‘Locotrol’ is used on IR, which couples 3 to 5 locos at the head of a train, and one or two somewhere in the middle of the train, and possibly another two or three at the rear. The locos at the middle and rear of the train are radio-controlled by the crew at the head of the train. This system is used in some places for heavy freight sections. It was introduced with WDM-2’s on the Kirandul-Kottavalasa line (near Vishakapatnam) in 1988 by SER. That line is now electrified and multiple WAM or WAG formations are used instead. Locotrol is (or was) also used on the Kulem-Londa section.
With multiple locos lashed up for MU operation, there are MU cables that pass between successive locos, which carry the control signals between the manned loco and the others. WDM-2 locos have a single MU cable, whereas the older WAG and WAM series use three MU cables, which also carry two connections for the tap-changers in the locos. The newer WAP-5 and WAG-9 locos use a single MU cable. The absence of this MU cable indicates manual coupling of locos — in this case, each loco is manned by crew, and they use horn or hand signals to communicate across the locos. Such non-automatic coupling can also be used for incompatible classes of locos, e.g. to couple a WDM-2 with a WAG loco in rare instances where the required electric loco wasn’t available. Even with some of the newer locos, coupling may not be possible for different classes of locos: e.g., a WAG-5 and a WAG-7 cannot be MU’d together and require separate crews for operation.
Also Read – HERE’S HOW THE QUALITY OF YOUR DIET AFFECTS YOUR MENTAL WELL BEING
In some cases the local loco sheds or workshops have carried out experimental modifications to locos to allow multiple unit operation even in cases where the locos were not designed for MU’ing originally. The Moula Ali shed of SCR, for instance, carried out an experiment in the 1990s to MU WDS-4 shunters to allow MU’d pairs of these to shunt long (24-coach) passenger rakes (SCR had an especially high number of 24-coach train services and not enough shunting power to match). Normally a single WDS-4 can only shunt up to about an 18-coach passenger rake. The experiment with MU’d WDS-4 did not work despite a lot of improvization and experimentation by Moula Ali and eventually this was dropped, as old WDM-2’s, and even WAM-4 or WAG-5 locos started being retired from mainline operations and becoming available for tasks like shunting.
IR never adopted the practice of designating locos as ‘A’ or ‘B’ units for coupling. All locos could be used as either a master or slave loco in coupled configurations. A few pairs of locos were sometimes kept in fixed-formation (mostly WDM-2 pairs); in such cases, both locos in the pair are usually oriented with their short hoods facing outwards (i.e., so that the short hood leads no matter which direction the locos travel in). (This is not universal practice, however, as lash-ups the other way around have been seen.)
Often, different locos may be seen coupled together, such as a WDG-2 with a WDM-2A.
Source – IFRCA.org
This entry was posted in 2 Railway Employee, STUDY NEW, Railway Employee
New Revised Rates of Railway Quarters w.e.f. 1.7.2023
QUESTION PAPER & ANSWER KEY TECH-III/TRD & TECH-III/ELECTRICAL GDCE 31-05-2022
Result of Train Manager (Goods Guard) Departmental Exam
QUESTION BANK – SELECTION OF JE C & W (Carriage & Wagon) (Hindi & English)
रेलगाड़ी टक्कर बचाव प्रणाली (Train Collision Avoidance System)
During October 2023, RPF reunited over 601 children under Operation ‘Nanhe Faristey’
Regarding Admissibility of training allowance to teaching faculty
रनिंग स्टाफ (Running Staff) सबंधित महत्वपूर्ण प्रश्न के उत्तर एवं स्पष्टीकरण
Promotion Order – Sr. Train Manager (Guard) to Sr. Passenger Train Manage Dt 26.7.2023
Railway Board Order Regarding Duty Hours of Running Staff
Shri Ram Karan Yadav takes over as General Manager, Central Railway
Q Paper & Answer AEN (Assistant Engineer) CBT Exam (Hindi/English) Dt 25.06.2023
Duration of Periodical Medical Examination of Non Gazetted Rly Employee (Rule 514 of IRMM Vol – 1)
जानिए पटरियों के साइड में क्यों लिखे होते हैं नंबर?
KNOW ABOUT – SPL KINDS OF LEAVE – RAILWAY
सहायक लोको पायलट के कर्तव्य (Duties of Assistant Loco Pilot)
Consolidated Orders of MACP Scheme by By Personnel Branch BZA Division
Duties & Responsibilities of Nursing Sister, Staff Nurse & Midwife
NPS – Important initiatives for Central Government employee
प्वाइंटसमेन की ड्यूटी लिस्ट ( list of Pointsman Duty)
GDCE Exam Quota Recruitment Process & Syllabus (ALP & TECHNICIANS POSTS)
Result of Train Manager (Goods Guard) Departmental Exam
गंभीर रोगियों को ट्रेन किराए में 75% तक का डिस्काउंट
Question Paper Ticket Examiner in Level-2 PR Quota 33 1/3% Commercial Department Dated 10.10.2021
QUESTION PAPER & ANSWER KEY TECH-III/TRD & TECH-III/ELECTRICAL GDCE 31-05-2022
Frequently asked Question (FAQ) On Privilege ePass / PTO
Question Paper With Answer of Chief Loco Inspector in Level 7 (ER) dt 08-09-2019
Question Paper & Answer – Goods Guard Selection Exam dt. 28.08.2022
Q PAPER – SELECTION OF STAFF & WELFARE INSPECTOR – SWR – 2011
राजभाषा पर विभागीय परीक्षा के लिए उपयोगी प्रश्नोतर
APPLICATION FORM FOR (I) INTER RAILWAY (II) INTER DIVISIONAL/ DEPARTMENTAL TRANSFER (III) DEPUTATION
APPLICATION FORM FOR (I) INTER RAILWAY (II) INTER DIVISIONAL/ DEPARTMENTAL TRANSFER (III) DEPUTATION
गंभीर रोगियों को ट्रेन किराए में 75% तक का डिस्काउंट
गुड/वैरी-गुड के चक्कर में फसेंगे कर्मी…. Chamchagiri Bahot Jaruri Hai
Post Retirement Complementary Passes For Railway Employees – Revised Entitlement
Clarification on Promotion Effecting Reservation (RBE 91/2018 dated 19.06.18)
Result of Train Manager (Goods Guard) Departmental Exam
Refund Rules of Unreserved & Reserved Tickets of Indian Railway
Good News – Modification of Recruitment Rule of Train Manager (Guard)
रेलवे के साफ्टवेयर में सेंध कर फर्जीवाड़ा
Vacancy Notification – Filling up of Various Ex-cadre posts of IRIEEN, Nashik road
Regarding Minimum Service Conditions For GDCE (General Departmental Competitive Examination )
Syllabus – Section Controller (Traffic)
Materials Management on Indian Railways (English)
Trouble Shooting -SUB SYSTEM – 19 TRAIN BUS- ACT (RS) – ABB Loco (English) (Part – B)
रेलवे में पति-पत्नी एक जगह होंगे तैनात
Are you sure you want to delete this element?
Close