General Manager presents Safety Award to 11 Staff of Central Railway
General Manager presents Safety Award to 11 Staff of Central Railway
General Manager presents Safety Award to 11 Staff of Central Railway
Final Seniority lists of Group ‘B’ officers of Civil Engineering Department Indian Railway
The first electric train ran between Bombay’s Victoria Terminus and Kurla along the Harbour Line of CR, on February 3, 1925, a distance of 9.5 miles. In 1926, Thana and Mahim were connected. In 1927, electrification was complete up to Kalyan. In 1928, Borivili in the north was connected (Colaba-Borivili of WR being inaugurated on May 1). In 1929, Kalyan – Igatpuri section was commissioned. In 1930, the Kalyan – Poona tracks were opened to electric trains.
On November 15, 1931, electrification of the meter gauge track between Madras Beach and Tambaram was inaugurated (1.5kV DC). After that the only electrification project undertaken was Borivili – Virar, finished in 1936. For mainline traffic, GIPR undertook electrification of the Karjat-Pune and Kasara-Igatpuri sections because it was realized that the heavy traffic to and from Bombay would be suitable for electric haulage.
ये भी पढ़े – अनोखा शहर जहां दो महीने का दिन होता है और 1.5 महीने की रात
Following this there was a long gap, and the next electrification project started only 1953 or 1954, in the Calcutta area (Howrah-Burdwan via Bandel, Sheoraphulli-Tarakeshwar), using 3kV DC traction. At this time, the idea of mainline electrification (Howrah-Mughalsarai) was seriously mooted. Support for 25kV AC traction was also growing at about this time, especially after some trials of AC locos from SNCF, and studies that concluded that the single-phase load from electric traction would not seriously unbalance the 3-phase regional grids.
So the Calcutta area electrification was done keeping in mind the eventual migration to 25kV AC system, in terms of the technical requirements (insulator specifications, etc.). The first 25kV AC electrified section was Burdwan-Mughalsarai, completed in 1957, followed by the Tatanagar-Rourkela section on the Howrah-Bombay route. The first actual train run (apart from trial runs) using 25kV AC was on December 15, 1959, on the Kendposi-Rajkharswan section (SER). Howrah-Gaya was electrified by about 1960. Electrification till Kanpur on the Howrah-Delhi route was done by about 1972, and the entire Howrah-Delhi route was electrified on August 5, 1976. The Bombay-Delhi route was electrified by February 1, 1988.
Through the 1960s and early 1970s numerous studies were commissioned to investigate the question of which of diesel or electric traction was really more economical and better in the long run for IR. Most of these leaned towards electrification, especially for high-traffic sections. The rise in oil prices in the mid-1970s tilted the argument further in favour of electric traction as electricity generation in most of India is hydroelectric or coal-based.
India took the plunge from DC to AC electric traction in the mid-1950s, as mentioned above. Since French developments led the field, the AC locomotives supplied at first (from SNCF) followed that country’s practice, whether built in India or France. These were the eight-wheeled WAM-1 locomotives that are still in operation in some places.
The first train to be hauled by an electric locomotive from Delhi Jn. was the Assam Mail.
Bombay-Delhi (WR) route was fully electrified by Dec. 1987. The CR route was fully electrified by June 1990, when the Bhusaval – Itarsi section was electrified.
The 2 * 25kV AC system (see below) began to be put in place in the 1990s; the first regular service using this system was between Bina and Katni (CR) on January 16, 1995. This was later extended to Bishrampur.
[12/04] With the BG conversion between Tambaram and Madras Beach complete, the only electrified MG line on IR is the Tambaram – Villupuram stretch. However, no train uses electric traction (the YAM 1 locomotives used to service this section have been dismantled). Madras Beach – Tambaram was originally on 1.5kV DC electrification but was converted around 1968 to the 25kV AC system.
After a period of about 25 years of aggressive electrification, now [12/04] IR has most of the busy routes of its network electrified (although not all), and this has resulted in about 65% of the traffic being hauled by electric traction. Recently [12/04], therefore, IR has decided to slow down the pace of electrification — about 2600km of routes are scheduled to be electrified in the next 10 years, compared to 5100km in the past 10 years. The focus will be on consolidating electric traction for the busiest sections; some of the sections that will be converted to electric traction in the next few years are Pune-Guntakal, Bina-Kota, and many ‘B’ sections of NR.
Source – IFRCA.org
This entry was posted in 2 Railway Employee, STUDY NEW, Railway Employee
Unified Pension Scheme (UPS) Gazette Notification (Hindi)
राजभाषा पर विभागीय परीक्षा के लिए उपयोगी प्रश्नोतर
Railway Management Guide – प्रबन्धन
रेलगाड़ी टक्कर बचाव प्रणाली (Train Collision Avoidance System)
रेल यात्री को 20रू में मिलेगा भरपेट भोजन
Transfer on Spouse Ground at Same Station
विकलांग अभ्यर्थी के लिए पदोन्नति में आरक्षण के संबंध में स्पष्टीकरण (H/E)
रनिंग स्टाफ (Running Staff) सबंधित महत्वपूर्ण प्रश्न के उत्तर एवं स्पष्टीकरण
SYLLABUS OF DEPARTMENTAL EXAMINATION OF TNC
Railway Board Order Regarding Duty Hours of Running Staff
Q Paper & Answer AEN (Assistant Engineer) CBT Exam (Hindi/English) Dt 25.06.2023
Know About- चिकित्सा प्रतिपूर्ति दावा में लगने वाले प्रपत्रों की सूची
जानिए पटरियों के साइड में क्यों लिखे होते हैं नंबर?
KNOW ABOUT – SPL KINDS OF LEAVE – RAILWAY
सहायक लोको पायलट के कर्तव्य (Duties of Assistant Loco Pilot)
Consolidated Orders of MACP Scheme by By Personnel Branch BZA Division
Know About- चिकित्सा प्रतिपूर्ति दावा में लगने वाले प्रपत्रों की सूची
Unified Pension Scheme (UPS) Gazette Notification (Hindi)
प्वाइंटसमेन की ड्यूटी लिस्ट ( list of Pointsman Duty)
Clarification – “Regular Employees” for appearing GDCE—Minimum Service Conditions
Shri Dharam Veer Meena Takes Over as General Manager, Central Railway
गंभीर रोगियों को ट्रेन किराए में 75% तक का डिस्काउंट
Question Paper Ticket Examiner in Level-2 PR Quota 33 1/3% Commercial Department Dated 10.10.2021
GDCE QUESTION PAPER & ANSWER KEY TECH-III/TRD & TECH-III/ELECTRICAL Dated 31-05-2022
Frequently asked Question (FAQ) On Privilege ePass / PTO
Question Paper With Answer of Chief Loco Inspector in Level 7 (ER) dt 08-09-2019
Question Paper & Answer – Goods Guard Selection Exam dt. 28.08.2022
Q PAPER – SELECTION OF STAFF & WELFARE INSPECTOR – SWR – 2011
राजभाषा पर विभागीय परीक्षा के लिए उपयोगी प्रश्नोतर
Railway Management Guide – प्रबन्धन
APPLICATION FORM FOR (I) INTER RAILWAY (II) INTER DIVISIONAL/ DEPARTMENTAL TRANSFER (III) DEPUTATION
APPLICATION FORM FOR (I) INTER RAILWAY (II) INTER DIVISIONAL/ DEPARTMENTAL TRANSFER (III) DEPUTATION
AIM & OBJECTIVES OF INDIAN RAILWAYS
गुड/वैरी-गुड के चक्कर में फसेंगे कर्मी…. Chamchagiri Bahot Jaruri Hai
Post Retirement Complementary Passes For Railway Employees – Revised Entitlement
Clarification on Promotion Effecting Reservation (RBE 91/2018 dated 19.06.18)
Result of Train Manager (Goods Guard) Departmental Exam
Refund Rules of Unreserved & Reserved Tickets of Indian Railway
Good News – Modification of Recruitment Rule of Train Manager (Guard)
CBI BUSTS DEPARTMENTAL EXAMINATION PAPER LEAK UNDER EAST CENTRAL RAILWAY
Vacancy Notification – Filling up of Various Ex-cadre posts of IRIEEN, Nashik road
Regarding Minimum Service Conditions For GDCE (General Departmental Competitive Examination )
Regarding Committee to Examine issues relating to Supervisory Categories
Vacancies Notification of Station Masters in Level – 6
Materials Management on Indian Railways (English)
Trouble Shooting -SUB SYSTEM – 19 TRAIN BUS- ACT (RS) – ABB Loco (English) (Part – B)
रेलवे में पति-पत्नी एक जगह होंगे तैनात
Are you sure you want to delete this element?
Close