Breaking News
विभिन्न खंडों में नॉन इंटरलॉकिंग कार्य के कारण कुछ ट्रेनें प्रभावित
विभिन्न खंडों में नॉन इंटरलॉकिंग कार्य के कारण कुछ ट्रेनें प्रभावित
Vacancy Notification of Manager Guest Service (MGS)-Staff Welfare, Level-7
जानिए पटरियों के साइड में क्यों लिखे होते हैं नंबर?
The absolute block system is the most widespread method of train working on IR. The block sections may be handled manually or automatically, or by some combination of those. Some sections still use different forms of physical token systems such as the Neale’s Ball Token instruments.
Other than the block system some other special-purpose methods of train working are used in some circumstances. There are many old and new kinds of signalling systems used by IR. Many regions use lower-quadrant or upper-quadrant semaphore signalling (now with electric lamps for night operation, but formerly using oil lamps). Many routes have been fitted with (automatic or manual, 2-, 3- or 4-aspect) colour-light signal systems that are electrically operated.
Apart from these FAQ pages, some extracts of the IR General Rules on train working are also available.
AWS (Automatic Warning System) is an in-cab signal warning system, is used in suburban EMU systems, primarily Mumbai. It was proposed for main lines including New Delhi – Agra, Howrah – Mughalsarai, etc. However, early trials on the Howrah – Mughalsarai stretch did not succeed as the track-side magnets and other equipment were subject to theft and vandalism. A few areas have seen the introduction of forms of centralized traffic control (CTC) in conjunction with automatic colour-light signalling. (CTC was first introduced on the NER’s busy MG section between Gorakhpur and Chupra, and later on the Bongaigaon-Changsari section of NFR.) The suburban section of Madras Egmore – Tambaram also has CTC.
Busy urban areas have electronic interconnections among the signal systems of the stations within the areas. Suburban systems generally have colour-light signalling and automatic block systems, sometimes with AWS or some form of automatic train stop systems (ATP, automatic train protection) as well. Automatic train stop systems were tried on some main lines in the 1960’s but were given up following excessive vandalism and pilferage of equipment and maintenance problems.
A Train Management System (TMS), from Bombardier, is used on the Mumbai suburban system (Churchgate – Virar) which provides centralized online monitoring of train positions. The Delhi Metro system uses Continuous ATC (CATC) including ATS and ATP on all its sections. Its metro (underground) section uses a flavour of ATO. Drivers are still on board each train on the underground section, but under normal conditions they don’t do much beyond handling the door opening and closing. All normal operations of running the trains — accelerating them, braking them, etc., are handled by the ATO system, with speeds up to 80km/h. The ATO system was supplied by Alstom (France)..
Around Chennai, several suburban stations have their signals automatically controllable from Basin Bridge using a fault-tolerant system that interconnects the signalling of up to 32 stations using a dual fibre-optic ring. This system also provides for 6 voice channels for communication among these stations. This system was developed indigenously by SR, the Dept. of Electronics, and IIT Madras.
Points and interlockings may be worked mechanically (rod or pipe linkages are common, but earlier, double-wire systems were also used) or electrically (motor driven). Many points exist which have to be manually operated at the location of the points after using a key to unlock the points.
Following British practice, IR’s signalling is essentially route signalling where the signals generally indicate which route has been set for a train, letting the driver choose the speed as appropriate for the divergences, curves, etc. (as opposed to speed signalling which is the basic philosophy underlying American practice). Of course no modern system of signalling is purely route-based or speed-based, and there are elements of speed signalling in some of IR’s signalling as well.
To give a sense of the variety of systems in use, here is a sample [6/99]:
Mumbai CSTM – Badlapur : Automatic Multiple Aspect Colour Light Signals
Badlapur – Pune – Daund : Manually controlled Multiple Aspect Colour Light Signals
Daund – Manmad : Lower Quadrant Semaphore signals
Daund – Solapur: Some stretches of Multiple Aspect Colour Light Signals and some sections of Tokenless Upper quadrant semaphore
Pune – Miraj – Kolhapur : Neale’s ball token instrument
Batala – Qadian, Garhi Harsuru – Farukhnagar : One Train Only system
Tilwara – Tilwara Mela : Train Staff and Ticket system
Source – IFRCA.org
This entry was posted in 2 Railway Employee, STUDY NEW, Railway Employee
New Revised Rates of Railway Quarters w.e.f. 1.7.2023
QUESTION PAPER & ANSWER KEY TECH-III/TRD & TECH-III/ELECTRICAL GDCE 31-05-2022
Result of Train Manager (Goods Guard) Departmental Exam
QUESTION BANK – SELECTION OF JE C & W (Carriage & Wagon) (Hindi & English)
रेलगाड़ी टक्कर बचाव प्रणाली (Train Collision Avoidance System)
भारतीय रेलवे ट्रेनों में यात्रियों को अच्छी गुणवत्ता वाला भोजन उपलब्ध कराने के लिए कई कोशिशें
Regarding Admissibility of training allowance to teaching faculty
रनिंग स्टाफ (Running Staff) सबंधित महत्वपूर्ण प्रश्न के उत्तर एवं स्पष्टीकरण
Promotion Order – Sr. Train Manager (Guard) to Sr. Passenger Train Manage Dt 26.7.2023
Railway Board Order Regarding Duty Hours of Running Staff
विभिन्न खंडों में नॉन इंटरलॉकिंग कार्य के कारण कुछ ट्रेनें प्रभावित
Q Paper & Answer AEN (Assistant Engineer) CBT Exam (Hindi/English) Dt 25.06.2023
Duration of Periodical Medical Examination of Non Gazetted Rly Employee (Rule 514 of IRMM Vol – 1)
जानिए पटरियों के साइड में क्यों लिखे होते हैं नंबर?
KNOW ABOUT – SPL KINDS OF LEAVE – RAILWAY
सहायक लोको पायलट के कर्तव्य (Duties of Assistant Loco Pilot)
Consolidated Orders of MACP Scheme by By Personnel Branch BZA Division
Duties & Responsibilities of Nursing Sister, Staff Nurse & Midwife
NPS – Important initiatives for Central Government employee
प्वाइंटसमेन की ड्यूटी लिस्ट ( list of Pointsman Duty)
GDCE Exam Quota Recruitment Process & Syllabus (ALP & TECHNICIANS POSTS)
Result of Train Manager (Goods Guard) Departmental Exam
गंभीर रोगियों को ट्रेन किराए में 75% तक का डिस्काउंट
Question Paper Ticket Examiner in Level-2 PR Quota 33 1/3% Commercial Department Dated 10.10.2021
QUESTION PAPER & ANSWER KEY TECH-III/TRD & TECH-III/ELECTRICAL GDCE 31-05-2022
Frequently asked Question (FAQ) On Privilege ePass / PTO
Question Paper With Answer of Chief Loco Inspector in Level 7 (ER) dt 08-09-2019
Question Paper & Answer – Goods Guard Selection Exam dt. 28.08.2022
Q PAPER – SELECTION OF STAFF & WELFARE INSPECTOR – SWR – 2011
राजभाषा पर विभागीय परीक्षा के लिए उपयोगी प्रश्नोतर
APPLICATION FORM FOR (I) INTER RAILWAY (II) INTER DIVISIONAL/ DEPARTMENTAL TRANSFER (III) DEPUTATION
APPLICATION FORM FOR (I) INTER RAILWAY (II) INTER DIVISIONAL/ DEPARTMENTAL TRANSFER (III) DEPUTATION
गंभीर रोगियों को ट्रेन किराए में 75% तक का डिस्काउंट
गुड/वैरी-गुड के चक्कर में फसेंगे कर्मी…. Chamchagiri Bahot Jaruri Hai
Post Retirement Complementary Passes For Railway Employees – Revised Entitlement
Clarification on Promotion Effecting Reservation (RBE 91/2018 dated 19.06.18)
Result of Train Manager (Goods Guard) Departmental Exam
Refund Rules of Unreserved & Reserved Tickets of Indian Railway
Good News – Modification of Recruitment Rule of Train Manager (Guard)
Mumbai Division RPF Comes Down Heavily on Touts
Vacancy Notification – Filling up of Various Ex-cadre posts of IRIEEN, Nashik road
Regarding Minimum Service Conditions For GDCE (General Departmental Competitive Examination )
Syllabus – Section Controller (Traffic)
Materials Management on Indian Railways (English)
Trouble Shooting -SUB SYSTEM – 19 TRAIN BUS- ACT (RS) – ABB Loco (English) (Part – B)
रेलवे में पति-पत्नी एक जगह होंगे तैनात
Are you sure you want to delete this element?
Close