What is ‘through’ or ‘scattered’ renewal?

July 19, 2019, 12:10 PM
Share

Complete Track Renewal (CTR) refers to the most thorough track replacement regime where rails, sleepers, etc., are fully replaced. Through Rail Renewal (TRR) refers to the replacement of rails in a given section of track, while Through Sleeper Renewal (TSR) refers to the replacement of sleepers. Similarly, there are Through Turnout renewal (TTR), Through Fitting Renewal (TFR), Through Weld Renewal (TWR), and Through Bridge Timber Renewal (TBTR). Each of these has a more thorough (‘primary’) and less thorough (‘secondary’) versions, hence you see the acronyms like ‘CTR(P)’ for ‘Complete Track Renewal – Primary’, or ‘TSR(S)’ for ‘Through Sleeper Renewal – Secondary. Additionally there are ‘Casual’ renewals, which refers to renewals of any kind that happen not on a predetermined schedule but as determined based on patrolling and inspection of tracks, in small continuous stretches. Finally, ‘Scattered’ renewal (SR) refers to ad hoc replacements that happen at isolated points.

Source – IFRCA.org

 

 

 

 
Railway Employee (App) Rail News Center ( App) Railway Question Bank ( App) Cover art  

Railway Mutual Transfer

(App)
Information Center  ( App)
 
Disclaimer: The Information /News /Video provided in this Platform has been collected from different sources. We Believe that “Knowledge Is Power” and our aim is to create general awareness among people and make them powerful through easily accessible Information. NOTE: We do not take any responsibility of authenticity of Information/News/Videos.
Share

This entry was posted in 2 Railway Employee, STUDY NEW, Railway Employee