General Manager presents Safety Award to 11 Staff of Central Railway
General Manager presents Safety Award to 11 Staff of Central Railway
General Manager presents Safety Award to 11 Staff of Central Railway
Final Seniority lists of Group ‘B’ officers of Civil Engineering Department Indian Railway
Several loco classes have speed limiters with buzzers that go off when the prescribed speed is exceeded. In some cases these may also result in the application of brakes. Some WAP-4 locos have the buzzer system and it is set for a speed of 130km/h although they are capable of going faster, while a few WAM-4 locos have it at 110km/h (although not all WAM-4 locos have the buzzer system as it requires a relatively more recent speedometer assembly to be retrofitted in them). Some WAG-5 locos and others also have such warning systems. The WCAM-3 loco, limited to 105km/h by its bogies, has the buzzer set to its top speed.
ये भी पढ़े – इंसान ही नहीं पृथ्वी के लिए भी खतरा है तंबाकू, वजह जानकर रह जाएंगे दंग
The newer loco classes (WAP-5, WAP-7, WAG-9) have provisions in their original designs for setting a speed limit, which, if exceed results not only in the warning buzzer/light going off but also apply the emergency brakes to slow down to below the prescribed speed. This system, however, is not thought to be actually deployed in any of the locos currently in use. The top speed limit can be set in software (160km/h for WAP-5, 140km/h for WAP-7, 100km/h for WAG-9). In the WAP-5, WAP-7, and the WAG-9, the driver’s job is easier in terms of not having to worry about exceeding the speed limit because these locos have provision for cruise control (constant speed settings) — see above. However, the driver does have to activate the vigilance system periodically, as explained below, even when the cruise control is on.
Vigilance systems in the form of ‘dead-man pedals’ are provided in some locos, such as the WAP-7. In the WAP-7 system, the vigilance pedal (PVEF) has to be depressed periodically; alternatively a button on a panel can also be depressed. If this is not done, and if the master controller is not being used for braking or acceleration, and if the A9 or SA9 (train / loco brakes) are not being used (any of which temporarily override the vigilance system), an alarm is sounded. This must be acknowledged by the pedal or switch; if acknowledgement is not provided with 60 seconds, power to the traction motors is cut. If there is no acknowledgement within 10 seconds after this, the main circuit breaker (DJ) is opened and the brakes are applied bringing the loco to a halt. Resetting this afterwards involves a number of manual steps at the main computer unit (‘HBB’) and re-building brake pressure. A similar system is provided in the WDP-4 and WDG-4, as well as in the WAP-5 and WAG-9.
Source – IFRCA.org
This entry was posted in 2 Railway Employee, STUDY NEW, Railway Employee
Unified Pension Scheme (UPS) Gazette Notification (Hindi)
राजभाषा पर विभागीय परीक्षा के लिए उपयोगी प्रश्नोतर
Railway Management Guide – प्रबन्धन
रेलगाड़ी टक्कर बचाव प्रणाली (Train Collision Avoidance System)
रेल यात्री को 20रू में मिलेगा भरपेट भोजन
Transfer on Spouse Ground at Same Station
विकलांग अभ्यर्थी के लिए पदोन्नति में आरक्षण के संबंध में स्पष्टीकरण (H/E)
रनिंग स्टाफ (Running Staff) सबंधित महत्वपूर्ण प्रश्न के उत्तर एवं स्पष्टीकरण
SYLLABUS OF DEPARTMENTAL EXAMINATION OF TNC
Railway Board Order Regarding Duty Hours of Running Staff
Q Paper & Answer AEN (Assistant Engineer) CBT Exam (Hindi/English) Dt 25.06.2023
Know About- चिकित्सा प्रतिपूर्ति दावा में लगने वाले प्रपत्रों की सूची
जानिए पटरियों के साइड में क्यों लिखे होते हैं नंबर?
KNOW ABOUT – SPL KINDS OF LEAVE – RAILWAY
सहायक लोको पायलट के कर्तव्य (Duties of Assistant Loco Pilot)
Consolidated Orders of MACP Scheme by By Personnel Branch BZA Division
Know About- चिकित्सा प्रतिपूर्ति दावा में लगने वाले प्रपत्रों की सूची
Unified Pension Scheme (UPS) Gazette Notification (Hindi)
प्वाइंटसमेन की ड्यूटी लिस्ट ( list of Pointsman Duty)
Clarification – “Regular Employees” for appearing GDCE—Minimum Service Conditions
Shri Dharam Veer Meena Takes Over as General Manager, Central Railway
गंभीर रोगियों को ट्रेन किराए में 75% तक का डिस्काउंट
Question Paper Ticket Examiner in Level-2 PR Quota 33 1/3% Commercial Department Dated 10.10.2021
GDCE QUESTION PAPER & ANSWER KEY TECH-III/TRD & TECH-III/ELECTRICAL Dated 31-05-2022
Frequently asked Question (FAQ) On Privilege ePass / PTO
Question Paper With Answer of Chief Loco Inspector in Level 7 (ER) dt 08-09-2019
Question Paper & Answer – Goods Guard Selection Exam dt. 28.08.2022
Q PAPER – SELECTION OF STAFF & WELFARE INSPECTOR – SWR – 2011
राजभाषा पर विभागीय परीक्षा के लिए उपयोगी प्रश्नोतर
Railway Management Guide – प्रबन्धन
APPLICATION FORM FOR (I) INTER RAILWAY (II) INTER DIVISIONAL/ DEPARTMENTAL TRANSFER (III) DEPUTATION
APPLICATION FORM FOR (I) INTER RAILWAY (II) INTER DIVISIONAL/ DEPARTMENTAL TRANSFER (III) DEPUTATION
AIM & OBJECTIVES OF INDIAN RAILWAYS
गुड/वैरी-गुड के चक्कर में फसेंगे कर्मी…. Chamchagiri Bahot Jaruri Hai
Post Retirement Complementary Passes For Railway Employees – Revised Entitlement
Clarification on Promotion Effecting Reservation (RBE 91/2018 dated 19.06.18)
Result of Train Manager (Goods Guard) Departmental Exam
Refund Rules of Unreserved & Reserved Tickets of Indian Railway
Good News – Modification of Recruitment Rule of Train Manager (Guard)
CBI BUSTS DEPARTMENTAL EXAMINATION PAPER LEAK UNDER EAST CENTRAL RAILWAY
Vacancy Notification – Filling up of Various Ex-cadre posts of IRIEEN, Nashik road
Regarding Minimum Service Conditions For GDCE (General Departmental Competitive Examination )
Regarding Committee to Examine issues relating to Supervisory Categories
Vacancies Notification of Station Masters in Level – 6
Materials Management on Indian Railways (English)
Trouble Shooting -SUB SYSTEM – 19 TRAIN BUS- ACT (RS) – ABB Loco (English) (Part – B)
रेलवे में पति-पत्नी एक जगह होंगे तैनात
Are you sure you want to delete this element?
Close