The most common length for BG rails is 13m (42’8”) although double-length rails (26m, 85’4”) are seen in some places. MG rails are usually 12m (39’4”) in length. NG rails vary, but the commonest length is 9m (29’6”). Much earlier (before the metric system was adopted!), rails were generally produced in sizes of 11, 12, or 14 yards (33′, 36′, 42′), less commonly 13 yards (39′) or 10 yards (30′ – NG).
Welded rail sections are of two types: Short Welded Rail or SWR which consists of just two or three rails welded together, and Long Welded Rail or LWR which covers anything longer. (In the past, there was a distinction made between LWR and Continuously Welded Rail, or CWR, based on the length — in CWR, the total length was 0.75km or more. The term ‘CWR’ is no longer used although you may still find it in old documents or painted signs.)
LWR is typically any length larger than twice the breathing length, which is the length allowed at the end of the welded rail section which is free to expand or contract as the temperature changes. (Beyond the breathing length, the rails do not move because of the resistance of the fasteners and the sleepers and ballast.) The breathing length varies with the temperature range, the sleepers, and the type of rails, but is typically 10m or less with concrete or steel sleepers. The expansion range of the rails is reduced with the steels of higher tensile strength, such as the 90UTS and 110UTS steels, allowing longer welded sections to be built.
With welded sections, the maintenance and safety problems of having rail joints with fishplates, etc., are reduced, but welded rail also calls for more precise provisioning of destressing/pretensioning to account for thermal expansion, etc. SWR with three-rail welded panels results in 28-30 fishplated joints over the distance of a kilometer, which is the source of the commonly heard (and beloved of railfans) clackety-clack rhythm of the wheels.
LWR is usually formed from panels of 10-rail or 20-rail length welded using flash butt welding at specialized plants (Meerut, Gonda, etc.). The welded rails are transported on special rail flat wagons which have end unloading chutes. LWR and CWR are also formed by in situ welding of the rails using alumino-thermic welding (also known as thermite (thermit) welding). In this, the highly exothermic reaction of aluminium with ferric oxide (provided as a paste called thermite) results in temperatures of around 2500C and the reduction of the ferric oxide to elemental molten iron that then helps form a weld. More details on thermit welding here. Also see the item below on welding.
There have been proposals from some rail manufacturers to supply long rails (65m, 78m) to reduce the number of welds required for LWR/CWR. Bhilai Steel Plant makes 80m rails as its basic design at the plant, however, usually these are cut to form the 13m and 26m rails to allow proper degassing and controlled cooling. Initially, only 13m rails could be produced — Bhilai Steel Plant was unable to make rails to the right specifications at longer lengths, and IR also did not have facilities for transporting longer rails. An experiment in the mid-1990s to produce 26m rails was unsuccessful. However, more recently, rail production technology has improved, and longer rails can be produced by Bhilai Steel Plant with the requisite low levels of hydrogen gas and conformance to other specifications. Lengths of 78m have been supplied from September 2004, and more recently some 130m rails have been supplied to IR.
[2003] The Steel Authority of India Ltd. (SAIL) will be producing, at the Bhilai plant, extra-long pre-welded rail panels (260m long, which is 10x the length of normal rails, and also 240m panels — this is a convenient multiple of the 80m manufactured length of rails from the Bhilai plant). [2/09] The Bhilai Steel Plant began supplying these 260m rails in February of 2009.
Source – IFRCA.org
Railway Employee (App) | Rail News Center ( App) | Railway Question Bank ( App) | (App) | Information Center ( App) |
This entry was posted in 2 Railway Employee, STUDY NEW, Railway Employee
New Revised Rates of Railway Quarters w.e.f. 1.7.2023
QUESTION PAPER & ANSWER KEY TECH-III/TRD & TECH-III/ELECTRICAL GDCE 31-05-2022
Result of Train Manager (Goods Guard) Departmental Exam
QUESTION BANK – SELECTION OF JE C & W (Carriage & Wagon) (Hindi & English)
रेलगाड़ी टक्कर बचाव प्रणाली (Train Collision Avoidance System)
भारतीय रेलवे ट्रेनों में यात्रियों को अच्छी गुणवत्ता वाला भोजन उपलब्ध कराने के लिए कई कोशिशें
Regarding Admissibility of training allowance to teaching faculty
रनिंग स्टाफ (Running Staff) सबंधित महत्वपूर्ण प्रश्न के उत्तर एवं स्पष्टीकरण
Promotion Order – Sr. Train Manager (Guard) to Sr. Passenger Train Manage Dt 26.7.2023
Railway Board Order Regarding Duty Hours of Running Staff
Q Paper & Answer AEN (Assistant Engineer) CBT Exam (Hindi/English) Dt 25.06.2023
Duration of Periodical Medical Examination of Non Gazetted Rly Employee (Rule 514 of IRMM Vol – 1)
जानिए पटरियों के साइड में क्यों लिखे होते हैं नंबर?
KNOW ABOUT – SPL KINDS OF LEAVE – RAILWAY
सहायक लोको पायलट के कर्तव्य (Duties of Assistant Loco Pilot)
Consolidated Orders of MACP Scheme by By Personnel Branch BZA Division
Duties & Responsibilities of Nursing Sister, Staff Nurse & Midwife
NPS – Important initiatives for Central Government employee
प्वाइंटसमेन की ड्यूटी लिस्ट ( list of Pointsman Duty)
GDCE Exam Quota Recruitment Process & Syllabus (ALP & TECHNICIANS POSTS)
Result of Train Manager (Goods Guard) Departmental Exam
गंभीर रोगियों को ट्रेन किराए में 75% तक का डिस्काउंट
Question Paper Ticket Examiner in Level-2 PR Quota 33 1/3% Commercial Department Dated 10.10.2021
QUESTION PAPER & ANSWER KEY TECH-III/TRD & TECH-III/ELECTRICAL GDCE 31-05-2022
Frequently asked Question (FAQ) On Privilege ePass / PTO
Question Paper With Answer of Chief Loco Inspector in Level 7 (ER) dt 08-09-2019
Question Paper & Answer – Goods Guard Selection Exam dt. 28.08.2022
Q PAPER – SELECTION OF STAFF & WELFARE INSPECTOR – SWR – 2011
राजभाषा पर विभागीय परीक्षा के लिए उपयोगी प्रश्नोतर
APPLICATION FORM FOR (I) INTER RAILWAY (II) INTER DIVISIONAL/ DEPARTMENTAL TRANSFER (III) DEPUTATION
APPLICATION FORM FOR (I) INTER RAILWAY (II) INTER DIVISIONAL/ DEPARTMENTAL TRANSFER (III) DEPUTATION
गंभीर रोगियों को ट्रेन किराए में 75% तक का डिस्काउंट
गुड/वैरी-गुड के चक्कर में फसेंगे कर्मी…. Chamchagiri Bahot Jaruri Hai
Post Retirement Complementary Passes For Railway Employees – Revised Entitlement
Clarification on Promotion Effecting Reservation (RBE 91/2018 dated 19.06.18)
Result of Train Manager (Goods Guard) Departmental Exam
Refund Rules of Unreserved & Reserved Tickets of Indian Railway
Good News – Modification of Recruitment Rule of Train Manager (Guard)
रेलवे के साफ्टवेयर में सेंध कर फर्जीवाड़ा
Vacancy Notification – Filling up of Various Ex-cadre posts of IRIEEN, Nashik road
Regarding Minimum Service Conditions For GDCE (General Departmental Competitive Examination )
Syllabus – Section Controller (Traffic)
Materials Management on Indian Railways (English)
Trouble Shooting -SUB SYSTEM – 19 TRAIN BUS- ACT (RS) – ABB Loco (English) (Part – B)
रेलवे में पति-पत्नी एक जगह होंगे तैनात
Are you sure you want to delete this element?
Close