Breaking News
Measures Taken By Govt To Enhance Safety In Train Operations And Minimize Train Accidents
जानिए पटरियों के साइड में क्यों लिखे होते हैं नंबर?
Catch sidings are sidings provided to divert runaway trains off the main line on approach to a station, or on steep downward slopes. Points are normally set to route all trains to the siding, which may end in a sand trap to slow down and halt any train that is moving too fast and out of control. This prevents runaways from entering station or yard limits, or from hurtling down a slope and derailing.
A train that has to proceed on the main line must come to a halt before the catch siding (usually a signal is provided for this), and wait to get authorization to proceed. In some cases, this happens when the driver sounds the horn or whistle to let the signalman or station crew know the train is waiting for the authorization to proceed. In some cases, especially in remote areas, the loco crew is provided with a key by the signal cabin in advance; this key unlocks the points to allow the train to proceed on the main line.
In a few cases, there are also automatic points that have sensors that set the points after detecting that the train has approached and waited for a prescribed period of time. In less busy sections, station crew or pointsmen may also arrive to manually set the points using a lever at the location, rather than operating them remotely.
Slip sidings are similar, but they are located on main lines in the direction away from a station or yard. Again, the points are normally set to divert all trains away from the main line, and a train must halt until the points are set and the signal (if provided) pulled off before proceeding. Slip sidings are often provided when there is a downward slope (greater than 1 in 26 or so) away from the station or yard, as then there is a risk of stabled rakes rolling out of the station or yard limits if the brakes fail.
Slip sidings are also provided on single line sections at cross-over points to protect trains that are waiting for a cross-over, from collisions if a train coming in the opposite direction fails to stop in time and overshoots the cross-over points. Slip sidings are also used when a double line ends to become a single line.
Shunting operations in yards are also normally carried out with the points set normally to lead away from the main line, except for very rare occasions where shunting activity must be carried out on the main line. For any train starting from the station (either with rake having been marshalled there or with coaches or wagons having been attached or detached at that station), where vacuum or air continuity was lost and brake power has to be rebuilt, the points are set for the main line only when the driver signals (using the horn or whistle) that brake power has been regained fully.
Source – IFRCA.org
Railway Employee (App) | Rail News Center ( App) | Railway Question Bank ( App) | (App) | Information Center ( App) |
This entry was posted in 2 Railway Employee, STUDY NEW, Railway Employee
New Revised Rates of Railway Quarters w.e.f. 1.7.2023
QUESTION PAPER & ANSWER KEY TECH-III/TRD & TECH-III/ELECTRICAL GDCE 31-05-2022
Result of Train Manager (Goods Guard) Departmental Exam
QUESTION BANK – SELECTION OF JE C & W (Carriage & Wagon) (Hindi & English)
रेलगाड़ी टक्कर बचाव प्रणाली (Train Collision Avoidance System)
भारतीय रेलवे ट्रेनों में यात्रियों को अच्छी गुणवत्ता वाला भोजन उपलब्ध कराने के लिए कई कोशिशें
Regarding Admissibility of training allowance to teaching faculty
रनिंग स्टाफ (Running Staff) सबंधित महत्वपूर्ण प्रश्न के उत्तर एवं स्पष्टीकरण
Promotion Order – Sr. Train Manager (Guard) to Sr. Passenger Train Manage Dt 26.7.2023
Railway Board Order Regarding Duty Hours of Running Staff
Q Paper & Answer AEN (Assistant Engineer) CBT Exam (Hindi/English) Dt 25.06.2023
Duration of Periodical Medical Examination of Non Gazetted Rly Employee (Rule 514 of IRMM Vol – 1)
जानिए पटरियों के साइड में क्यों लिखे होते हैं नंबर?
KNOW ABOUT – SPL KINDS OF LEAVE – RAILWAY
सहायक लोको पायलट के कर्तव्य (Duties of Assistant Loco Pilot)
Consolidated Orders of MACP Scheme by By Personnel Branch BZA Division
Duties & Responsibilities of Nursing Sister, Staff Nurse & Midwife
NPS – Important initiatives for Central Government employee
प्वाइंटसमेन की ड्यूटी लिस्ट ( list of Pointsman Duty)
GDCE Exam Quota Recruitment Process & Syllabus (ALP & TECHNICIANS POSTS)
Result of Train Manager (Goods Guard) Departmental Exam
गंभीर रोगियों को ट्रेन किराए में 75% तक का डिस्काउंट
Question Paper Ticket Examiner in Level-2 PR Quota 33 1/3% Commercial Department Dated 10.10.2021
QUESTION PAPER & ANSWER KEY TECH-III/TRD & TECH-III/ELECTRICAL GDCE 31-05-2022
Frequently asked Question (FAQ) On Privilege ePass / PTO
Question Paper With Answer of Chief Loco Inspector in Level 7 (ER) dt 08-09-2019
Question Paper & Answer – Goods Guard Selection Exam dt. 28.08.2022
Q PAPER – SELECTION OF STAFF & WELFARE INSPECTOR – SWR – 2011
राजभाषा पर विभागीय परीक्षा के लिए उपयोगी प्रश्नोतर
APPLICATION FORM FOR (I) INTER RAILWAY (II) INTER DIVISIONAL/ DEPARTMENTAL TRANSFER (III) DEPUTATION
APPLICATION FORM FOR (I) INTER RAILWAY (II) INTER DIVISIONAL/ DEPARTMENTAL TRANSFER (III) DEPUTATION
गंभीर रोगियों को ट्रेन किराए में 75% तक का डिस्काउंट
गुड/वैरी-गुड के चक्कर में फसेंगे कर्मी…. Chamchagiri Bahot Jaruri Hai
Post Retirement Complementary Passes For Railway Employees – Revised Entitlement
Clarification on Promotion Effecting Reservation (RBE 91/2018 dated 19.06.18)
Result of Train Manager (Goods Guard) Departmental Exam
Refund Rules of Unreserved & Reserved Tickets of Indian Railway
Good News – Modification of Recruitment Rule of Train Manager (Guard)
रेलवे के साफ्टवेयर में सेंध कर फर्जीवाड़ा
Vacancy Notification – Filling up of Various Ex-cadre posts of IRIEEN, Nashik road
Regarding Minimum Service Conditions For GDCE (General Departmental Competitive Examination )
Syllabus – Section Controller (Traffic)
Materials Management on Indian Railways (English)
Trouble Shooting -SUB SYSTEM – 19 TRAIN BUS- ACT (RS) – ABB Loco (English) (Part – B)
रेलवे में पति-पत्नी एक जगह होंगे तैनात
Are you sure you want to delete this element?
Close