A banker is a locomotive that assists in hauling a train up a steep gradient. A banker is attached to the rear of the train and pushes the train from the rear while the normal locomotive of the train pulls it as usual from the front.
Bankers are used for two reasons. One is that, of course, the leading loco may need assistance on a steep gradient. However, a more important reason to have a banker at the rear when ascending a grade is to protect the train from a possibility of coupling failure and consequent parting which would cause a portion of the train to hurtle backwards because of the gradient (guard’s brakes being generally inadequate for such a situation). When descending a grade, bankers may be attached at the front to provide extra brake power (or sometimes just to allow the locos to be returned to their shed after having banked trains up the grade earlier, without taking up a separate slot on the timetable).
On an incline, when the train is being pulled up, the couplers come under a lot of strain. Normally, on level track, the couplers only have to sustain the forces corresponding to the static and rolling friction of the wagons or coaches. But when being pulled up, a component of the wagons’ or coaches’ weight also forms a part of the load on the couplers (the proportion of the weight arising from the sine of the angle of the gradient). Hence, there is a much higher probability of coupler failure when going up an incline. Finally, the additional locomotives help contribute extra brake power for the rake on the slope.
Often two, three, or even more banking engines may be provided on particularly steep grades and for heavy freight loads. It is common to see 3 rear bankers for passenger trains with 21+ coaches. On the Igatpuri-Kasara section even descending trains get two or three front bankers. It is common to see [8/03] the Kushinagar Exp. get two WCG-2 bankers and a WCAM-3 up to Kasara.
Other trains on the same section often get three WCG-2 locos banking in front of a WCAM-3 when descending. Sometimes, however, bankers are attached to trains simply because there are available locos that need to be returned to one shed or the other, and using them as bankers is a way to move them rather than sending them light and reducing track utilization. The working timetable for a division specifies the local rules in effect for how many and what kinds of locos to use as bankers for different kinds of trains and loads.
The safety requirements for train operation set forth by the Commissioner of Rail Safety forbid operating passenger trains on steep gradients without bankers. Goods trains are sometimes operated on such sections without bankers if loads are light. EMUs are sometimes moved between Pune and Mumbai for maintenance and no bankers are used in such cases on the ghat sections as they are not carrying passengers.
The specific rules for what inclines necessitate bankers may vary from one zonal railway to another. In addition, bankers must be used for gentler inclines if there are special circumstances such as operation without brake vans.
See the section on couplers for some information on the limitations of the ordinary screw coupler used most commonly on BG passenger stock. The limits on the tensile force the screw coupler can handle necessitate the use of bankers for most Mail or Express trains these days even on fairly gentle gradients of 1 in 60 or so, since the rakes have been getting longer (and therefore heavier) in recent years. Hence the Nagpur-Itarsi ghat section requires bankers for all passenger trains with 18 or more coaches. Many trains with 17 coaches are run through on the ghat section for fear of overstressing the couplers if a stop is made and the train has to start on the incline. With CBC couplers, the allowable tensile loads are far higher. Goods trains with CBC couplers often don’t need bankers on slight to moderate inclines for train parting reasons, but may require bankers to assist the leading loco.
Often, brake vans are removed from the rake before a banker is attached at the rear, because the common 4-wheeled brake vans are light and do not share the same mass/inertia characteristics of the freight wagons, causing them to be jolted around excessively and very often jump the rails due to the buffing action between the wagons and the banker locos. A newer, long 8-wheeled brake van has recently [6/04] been developed which may avoid this problem, at the cost of making the rake longer.
In addition to the use of bankers, ghat sections often have special rules of operation. Mandatory brake halts are provided for steeper grades so that a brake power check can be done before the train proceeds on to the grade. Stopping at the top of a grade before descending also ensures the train is under control before proceeding. In steam days it was often common, for the steeper grades, to inspect all the brake cylinders of the rake at the mandatory brake halt, with defective ones being replaced immediately. There are also timed signals provided in some places; the train must stop at the signal for a specified time before it goes off and the points switch away from the catch siding, ensuring that only trains able to come to a halt there can proceed. ‘Auto Emergency Brakes’ are provided for locos intended for use on several ghat sections. These apply the brakes automatically if the speed exceeds a certain threshold.
Source – IFRCA.org
Railway Employee (App) | Rail News Center ( App) | Railway Question Bank ( App) | (App) | Information Center ( App) |
This entry was posted in 2 Railway Employee, STUDY NEW, Railway Employee
New Revised Rates of Railway Quarters w.e.f. 1.7.2023
QUESTION PAPER & ANSWER KEY TECH-III/TRD & TECH-III/ELECTRICAL GDCE 31-05-2022
Result of Train Manager (Goods Guard) Departmental Exam
QUESTION BANK – SELECTION OF JE C & W (Carriage & Wagon) (Hindi & English)
रेलगाड़ी टक्कर बचाव प्रणाली (Train Collision Avoidance System)
During October 2023, RPF reunited over 601 children under Operation ‘Nanhe Faristey’
Regarding Admissibility of training allowance to teaching faculty
रनिंग स्टाफ (Running Staff) सबंधित महत्वपूर्ण प्रश्न के उत्तर एवं स्पष्टीकरण
Promotion Order – Sr. Train Manager (Guard) to Sr. Passenger Train Manage Dt 26.7.2023
Railway Board Order Regarding Duty Hours of Running Staff
Shri Ram Karan Yadav takes over as General Manager, Central Railway
Q Paper & Answer AEN (Assistant Engineer) CBT Exam (Hindi/English) Dt 25.06.2023
Duration of Periodical Medical Examination of Non Gazetted Rly Employee (Rule 514 of IRMM Vol – 1)
जानिए पटरियों के साइड में क्यों लिखे होते हैं नंबर?
KNOW ABOUT – SPL KINDS OF LEAVE – RAILWAY
सहायक लोको पायलट के कर्तव्य (Duties of Assistant Loco Pilot)
Consolidated Orders of MACP Scheme by By Personnel Branch BZA Division
Duties & Responsibilities of Nursing Sister, Staff Nurse & Midwife
NPS – Important initiatives for Central Government employee
प्वाइंटसमेन की ड्यूटी लिस्ट ( list of Pointsman Duty)
GDCE Exam Quota Recruitment Process & Syllabus (ALP & TECHNICIANS POSTS)
Result of Train Manager (Goods Guard) Departmental Exam
गंभीर रोगियों को ट्रेन किराए में 75% तक का डिस्काउंट
Question Paper Ticket Examiner in Level-2 PR Quota 33 1/3% Commercial Department Dated 10.10.2021
QUESTION PAPER & ANSWER KEY TECH-III/TRD & TECH-III/ELECTRICAL GDCE 31-05-2022
Frequently asked Question (FAQ) On Privilege ePass / PTO
Question Paper With Answer of Chief Loco Inspector in Level 7 (ER) dt 08-09-2019
Question Paper & Answer – Goods Guard Selection Exam dt. 28.08.2022
Q PAPER – SELECTION OF STAFF & WELFARE INSPECTOR – SWR – 2011
राजभाषा पर विभागीय परीक्षा के लिए उपयोगी प्रश्नोतर
APPLICATION FORM FOR (I) INTER RAILWAY (II) INTER DIVISIONAL/ DEPARTMENTAL TRANSFER (III) DEPUTATION
APPLICATION FORM FOR (I) INTER RAILWAY (II) INTER DIVISIONAL/ DEPARTMENTAL TRANSFER (III) DEPUTATION
गंभीर रोगियों को ट्रेन किराए में 75% तक का डिस्काउंट
गुड/वैरी-गुड के चक्कर में फसेंगे कर्मी…. Chamchagiri Bahot Jaruri Hai
Post Retirement Complementary Passes For Railway Employees – Revised Entitlement
Clarification on Promotion Effecting Reservation (RBE 91/2018 dated 19.06.18)
Result of Train Manager (Goods Guard) Departmental Exam
Refund Rules of Unreserved & Reserved Tickets of Indian Railway
Good News – Modification of Recruitment Rule of Train Manager (Guard)
रेलवे के साफ्टवेयर में सेंध कर फर्जीवाड़ा
Vacancy Notification – Filling up of Various Ex-cadre posts of IRIEEN, Nashik road
Regarding Minimum Service Conditions For GDCE (General Departmental Competitive Examination )
Syllabus – Section Controller (Traffic)
Materials Management on Indian Railways (English)
Trouble Shooting -SUB SYSTEM – 19 TRAIN BUS- ACT (RS) – ABB Loco (English) (Part – B)
रेलवे में पति-पत्नी एक जगह होंगे तैनात
Are you sure you want to delete this element?
Close