Breaking News
General Manager’s Safety Award for 10 Staff of Central Railway
क्षेत्रीय हिंदी प्रतियोगिता 2023 संपन्न
General Manager’s Safety Award for 10 Staff of Central Railway
जानिए पटरियों के साइड में क्यों लिखे होते हैं नंबर?
The Bombay Rajdhani was introduced on May 17, 1972 with a maximum speed of 120 km/h and booked speed of 115 km/h. It covered the 1384km route in about 19 hours. It was a biweekly train. The cost was Rs. 343 by AC sleeper and Rs. 114 by AC Chair car. Composition – 1 AC sleeper with 18 berths, 4 AC chair cars with 71 seats each, 1 pantry-cum-chair car with 10 seats, 2 luggage-cum-power cars. An additional AC Chair car with 71 seats ran as and when traffic justified it. There was no booking of passengers for stations enroute.
The Bombay – New Delhi Rajdhani was initially hauled by a single specially regeared Ratlam WDM-2 loco. There were operational halts at Vadodara, Ratlam, Gangapur City and Mathura, for watering, engine changing, change of crew, issue of caution orders, etc. A few years later, Vadodara and Ratlam became passenger halts, Gangapur City still existed as a service halt and Mathura had been removed.
In 1984, the train became double-headed (WDM-2’s) with 18 air-braked coaches (the first long-distance train to get air-braked stock for regular operations). At the time electric traction was not continuous all the way between New Delhi and Bombay, and most electric locos were not fitted with air brakes, hence the choice of the twin WDM-2 locos. Further, the change to DC traction after Virar towards Bombay would have necessitated a change of locos in any case, lengthening the trip time. Except for a couple of patches in the Nagda-Kota section, the entire Bombay-New Delhi section was double-tracked – so journey time had been cut down to about 17-1/2 hours. By the late 1980s, a WAP-1 (from Vadodara shed) would take over in the Ratlam – New Delhi section (or sometimes from Vadodara onwards), thus increasing the speed to 120/130 booked/max. in this section. Later WAP-3 and other WAP series locos were used.
The WAP locos couldn’t run all the way to Bombay because of the change of traction at Virar, and the diesel shed at Ratlam was conveniently situated to handle the WDM-2’s required for that run of the Rajdhani. With the WAP locos hauling the train for part of the way, the running time was brought down to about 16-1/2 hrs. Kota was included as a passenger halt and Gangapur City was removed from the list.
With the introduction of the high-speed dual-voltage (AC/DC) WCAM-2P locos (which were also air-braked) in 1993-94, the Rajdhani could electric hauled all the way. A WCAM-2P hauled it on the Mumbai Central – Vadodara section, and a WAP series loco hauled it for the rest of the route to New Delhi.
On December 15th 2003, a new LHB rake was assigned to the Mumbai Rajdhani. The new coaches incorporate advanced features such as anti-skid disc brakes, a modular pantry, a food warmer/cooler, and anti-telescopic and anti-climbing features. The new coaches have higher passenger-carrying capacity and are designed for a higher speed rating of 140kmh.
Source – IFRCA.org
Railway Employee (App) | Rail News Center ( App) | Railway Question Bank ( App) | (App) | Information Center ( App) |
This entry was posted in Historical - Railway, Know About, Railway General Information, Public Facilities
New Revised Rates of Railway Quarters w.e.f. 1.7.2023
QUESTION PAPER & ANSWER KEY TECH-III/TRD & TECH-III/ELECTRICAL GDCE 31-05-2022
Result of Train Manager (Goods Guard) Departmental Exam
QUESTION BANK – SELECTION OF JE C & W (Carriage & Wagon) (Hindi & English)
रेलगाड़ी टक्कर बचाव प्रणाली (Train Collision Avoidance System)
During October 2023, RPF reunited over 601 children under Operation ‘Nanhe Faristey’
Regarding Admissibility of training allowance to teaching faculty
रनिंग स्टाफ (Running Staff) सबंधित महत्वपूर्ण प्रश्न के उत्तर एवं स्पष्टीकरण
Promotion Order – Sr. Train Manager (Guard) to Sr. Passenger Train Manage Dt 26.7.2023
Railway Board Order Regarding Duty Hours of Running Staff
Shri Ram Karan Yadav takes over as General Manager, Central Railway
Q Paper & Answer AEN (Assistant Engineer) CBT Exam (Hindi/English) Dt 25.06.2023
Duration of Periodical Medical Examination of Non Gazetted Rly Employee (Rule 514 of IRMM Vol – 1)
जानिए पटरियों के साइड में क्यों लिखे होते हैं नंबर?
KNOW ABOUT – SPL KINDS OF LEAVE – RAILWAY
सहायक लोको पायलट के कर्तव्य (Duties of Assistant Loco Pilot)
Consolidated Orders of MACP Scheme by By Personnel Branch BZA Division
Duties & Responsibilities of Nursing Sister, Staff Nurse & Midwife
NPS – Important initiatives for Central Government employee
प्वाइंटसमेन की ड्यूटी लिस्ट ( list of Pointsman Duty)
GDCE Exam Quota Recruitment Process & Syllabus (ALP & TECHNICIANS POSTS)
Result of Train Manager (Goods Guard) Departmental Exam
गंभीर रोगियों को ट्रेन किराए में 75% तक का डिस्काउंट
Question Paper Ticket Examiner in Level-2 PR Quota 33 1/3% Commercial Department Dated 10.10.2021
QUESTION PAPER & ANSWER KEY TECH-III/TRD & TECH-III/ELECTRICAL GDCE 31-05-2022
Frequently asked Question (FAQ) On Privilege ePass / PTO
Question Paper With Answer of Chief Loco Inspector in Level 7 (ER) dt 08-09-2019
Question Paper & Answer – Goods Guard Selection Exam dt. 28.08.2022
Q PAPER – SELECTION OF STAFF & WELFARE INSPECTOR – SWR – 2011
राजभाषा पर विभागीय परीक्षा के लिए उपयोगी प्रश्नोतर
APPLICATION FORM FOR (I) INTER RAILWAY (II) INTER DIVISIONAL/ DEPARTMENTAL TRANSFER (III) DEPUTATION
APPLICATION FORM FOR (I) INTER RAILWAY (II) INTER DIVISIONAL/ DEPARTMENTAL TRANSFER (III) DEPUTATION
गंभीर रोगियों को ट्रेन किराए में 75% तक का डिस्काउंट
गुड/वैरी-गुड के चक्कर में फसेंगे कर्मी…. Chamchagiri Bahot Jaruri Hai
Post Retirement Complementary Passes For Railway Employees – Revised Entitlement
Clarification on Promotion Effecting Reservation (RBE 91/2018 dated 19.06.18)
Result of Train Manager (Goods Guard) Departmental Exam
Refund Rules of Unreserved & Reserved Tickets of Indian Railway
Good News – Modification of Recruitment Rule of Train Manager (Guard)
रेलवे के साफ्टवेयर में सेंध कर फर्जीवाड़ा
Vacancy Notification – Filling up of Various Ex-cadre posts of IRIEEN, Nashik road
Regarding Minimum Service Conditions For GDCE (General Departmental Competitive Examination )
Syllabus – Section Controller (Traffic)
Materials Management on Indian Railways (English)
Trouble Shooting -SUB SYSTEM – 19 TRAIN BUS- ACT (RS) – ABB Loco (English) (Part – B)
रेलवे में पति-पत्नी एक जगह होंगे तैनात
Are you sure you want to delete this element?
Close