Breaking News
Result of Train Manager (Goods Guard) Departmental Exam
Shri Ram Karan Yadav takes over as General Manager, Central Railway
Result of Train Manager (Goods Guard) Departmental Exam
जानिए पटरियों के साइड में क्यों लिखे होते हैं नंबर?
It’s working to charge main reservoir with pressurized air, has 03 cylinders, two big cylinders are called low pressure cylinders and small is called high pressure cylinder. Low pressure cylinders having 02 inlets and 02 discharge valves, inlet valve is connected to air intake filter and discharge valve to intercooler. High pressure cylinder having 01 inlet and 01 discharge valves, inlet valve is connected to inter cooler and discharge valve to cooling coil through after cooler. Inlet valves have un-loader assembly, its connection given to EPG.
When piston travel from TDC to BDC in low pressure cylinder inlet valve opened and filtered atmospheric air entered in cylinder. When piston travel from BDC to TDC inlet valves close and pressure is increased in cylinder hence discharge valve gets open and air goes in inter cooler where it cools by air. Safety valve (setting 4.2 kg/cm2) is provided on inter cooler to safeguard it.
When piston travel from TDC to BDC in high pressure cylinder inlet valve open hence air from inter cooler entered in cylinder. When piston travel from BDC to TDC inlet valves close and pressure is increased in cylinder hence discharge valve gets open and air goes in cooling coil through after cooler where it gets cool by air and charged MR1. Safety valve (setting 10.5 kg/cm2 ) is provided on outlet pipe of MR1, it discharge over pressure and safe guard the MR tank. From MR1 air goes to MR2 through air dryer and NRV. MR1is provided in under truck between fuel tank and rear truck and MR2 between fuel tank and front truck.
MR1 pressure is used on different places as below:
Control air pressure reservoir – It is charged with 5 kg/cm2 . NS1 reducing valve and COC is provided in nose compartment to convert MR pressure into 5 kg/cm2 . This pressure is used to operate electro pneumatic contactor. It has drain cock and pressure gauge mounted on nose compartment wall in loco pilot cab.
Sanders – Sanding between wheel and rail, sanders valve are provided.
Wipers – Both side looking glass having wipers which are operated by its servo motor.
Horns – Horn switches are provided on both control stand and its coc in nose compartment.
MR1 equalizing pipe – In multiple unit MR pressure is equalizing when MR equalizing pipe is connected between the loco which is charged by duplex valve.
Feed pipe – In twin pipe brake system feed pipe is charged with 6kg/cm2 through D24B valve, its 11 /4” coc.
EPG – Its main function is to maintain MR pressure between 8 to 10 kg/cm². Its EP valve and cut out cock is provided in compressor room on the radiator room wall. Pressure switch, pressure gauge and COC is provided in nose compartment, its toggle switch is provided on nose compartment.
When MR pressure reach to 10 kg/cm², EPG operates and send air pressure on un-loader assembly as well as auto drain valve. Due to air pressure on un-loader assembly inlet valve remains in opened condition and air will not compressed. This process is called unloading / governor cut out. Auto drain valve drains moisture from MR1.
When MR pressure drops up to 8kg/cm2, EPG comes in its balance/cut in position and its exhaust port opened, which vents the air from un-loader assembly as well as auto drain valve. Due to no air pressure on un-loader assembly, inlet valve closed and restarts the air compression. This process is called loading / governor cut in. Auto drain valve drains moisture from MR1.
In multiple unit EPG helps in loading and unloading of MR in all locos at a time. Normal position of EPG toggle switch is ON and in case of MU in trailing loco it is in OFF position.
MR2 – It is located between fuel tank and front truck. MR2 air is used to operate different valves of brake system. J-filter and its coc provided on MR2 outlet pipe. Drain cocks are provided on MR1, MR2, J-filter, control reservoir to drain moisture.
Lubrication of compressor – Compressor sump has filled with 20 litters Lube oil, it has a positive displacement type pump provided in the sump which is rotates through chain and sprocket. Compressor shaft rotating pump starts work and distribute pressurized oil on following places.
1. Relief valve
2. Needle valve
3. Distribution ring.
From distribution ring following equipments are lubricate
1. Crank pin
2. Piston pin
3. Cylinder liner
Brass needle valve is provided to check the working of pump when engine in working condition. Due to oil pressure needle valve spindle projected. Compressor sump is connected breather valve sump.
Checking of Compressor oil- Spy glass and dipstick gauge are provided to check oil level in the sump. While checking oil level through dipstick gauge, Engine to be shut down.
Brass Needle Valve Not Project Out – It is provided to check the working of pump when engine in working condition. If it project out on Engine raise, note in Loco repair book. If it does not project out, loose check nut on needle valve if oil comes from it, it means pump is working but needle valve defective book in repair book. If oil does not comes out check the oil level in sump if oil level is satisfactory, it means pump is defective, fail the loco. If oil level is below minimum mark then inform PCOR.
MR pressure not buildup/dropping
MR pressure dropping on run – In this situation loco pilot will not leave control stand and keep sharp watch on MR & BP pressure gauge, work the train and follow traffic rules. When MR pressure comes below 6 kg/cm2 apply A9 to stop the train and keep A9 in emergency & SA9 in application position and also secure the train as per requirement. Blow the whistle code to protect/secure the train from rear by Guard as per traffic rule. Further do the trouble shooting.
Causes Remedies Inter cooler safety valve blowing continuously Tap it. Inter cooler tube broken To maintain the MR pressure by keeping engine in raise condition if possible. MR safety valve blowing continuously Tap it. MR1, MR2, J-filter and control reservoir drain cock are in opened condition. Close the concern drain cock. Auto drain valve blowing continuously. Tap / isolate it. Leakage from MR/BC equalizing COC or BP/FP angle cock. Close it properly. Leakage in the system. Try to arrest. EPG is defective. Tap EP valve or switch off toggle switch and close EP valve COC, create slight leakage in MR1. J-filter coc in closed condition Open it. Air dyer unit defective By pass it.
In dual brake loco expresser is provided instead of compressor. The combination of exhauster and compressor is called expresser; it is provided in the expresser room. The main function of expresser is to provide compress air and vacuum for various purposes.
It has 6 cylinders, 3 for compressor and 3 for exhauster. Two crank pin provide on expresser crank shaft, each pin has 3 connecting rods.
Each cylinder head of exhauster has two inlets and exhaust valve, all inlet valves of 3 cylinders are connected with inlet pipe and inlet pipe is connected with VA1B control valve, the inlet pipe is called vacuum reservoir. Similarly exhaust valves are connected with exhaust pipe in under truck. When exhauster cylinder piston travel from TDC to BDC, inlet valve open and train pipe air entered into the cylinder through VA1B control valve and vacuum reservoir. Piston travels from BDC to TDC, inlet valve closed and exhaust valve opens due to air pressure, evacuated through exhaust pipe into atmosphere hence vacuum created in train pipe.
To check the vacuum level in train pipe, vacuum gauge is providing on both control desk. Vacuum check valve is connected with vacuum reservoir to maintain the certain level of vacuum in expresser sump.
Oil coming with smoke from expresser exhaust pipe
This entry was posted in 7 Study Material & Guide, Diesel Loco, WDG - 3A Locomotive
New Revised Rates of Railway Quarters w.e.f. 1.7.2023
QUESTION PAPER & ANSWER KEY TECH-III/TRD & TECH-III/ELECTRICAL GDCE 31-05-2022
Result of Train Manager (Goods Guard) Departmental Exam
QUESTION BANK – SELECTION OF JE C & W (Carriage & Wagon) (Hindi & English)
रेलगाड़ी टक्कर बचाव प्रणाली (Train Collision Avoidance System)
During October 2023, RPF reunited over 601 children under Operation ‘Nanhe Faristey’
Regarding Admissibility of training allowance to teaching faculty
रनिंग स्टाफ (Running Staff) सबंधित महत्वपूर्ण प्रश्न के उत्तर एवं स्पष्टीकरण
Promotion Order – Sr. Train Manager (Guard) to Sr. Passenger Train Manage Dt 26.7.2023
Railway Board Order Regarding Duty Hours of Running Staff
Shri Ram Karan Yadav takes over as General Manager, Central Railway
Q Paper & Answer AEN (Assistant Engineer) CBT Exam (Hindi/English) Dt 25.06.2023
Duration of Periodical Medical Examination of Non Gazetted Rly Employee (Rule 514 of IRMM Vol – 1)
जानिए पटरियों के साइड में क्यों लिखे होते हैं नंबर?
KNOW ABOUT – SPL KINDS OF LEAVE – RAILWAY
सहायक लोको पायलट के कर्तव्य (Duties of Assistant Loco Pilot)
Consolidated Orders of MACP Scheme by By Personnel Branch BZA Division
Duties & Responsibilities of Nursing Sister, Staff Nurse & Midwife
NPS – Important initiatives for Central Government employee
प्वाइंटसमेन की ड्यूटी लिस्ट ( list of Pointsman Duty)
GDCE Exam Quota Recruitment Process & Syllabus (ALP & TECHNICIANS POSTS)
Result of Train Manager (Goods Guard) Departmental Exam
गंभीर रोगियों को ट्रेन किराए में 75% तक का डिस्काउंट
Question Paper Ticket Examiner in Level-2 PR Quota 33 1/3% Commercial Department Dated 10.10.2021
QUESTION PAPER & ANSWER KEY TECH-III/TRD & TECH-III/ELECTRICAL GDCE 31-05-2022
Frequently asked Question (FAQ) On Privilege ePass / PTO
Question Paper With Answer of Chief Loco Inspector in Level 7 (ER) dt 08-09-2019
Question Paper & Answer – Goods Guard Selection Exam dt. 28.08.2022
Q PAPER – SELECTION OF STAFF & WELFARE INSPECTOR – SWR – 2011
राजभाषा पर विभागीय परीक्षा के लिए उपयोगी प्रश्नोतर
APPLICATION FORM FOR (I) INTER RAILWAY (II) INTER DIVISIONAL/ DEPARTMENTAL TRANSFER (III) DEPUTATION
APPLICATION FORM FOR (I) INTER RAILWAY (II) INTER DIVISIONAL/ DEPARTMENTAL TRANSFER (III) DEPUTATION
गंभीर रोगियों को ट्रेन किराए में 75% तक का डिस्काउंट
गुड/वैरी-गुड के चक्कर में फसेंगे कर्मी…. Chamchagiri Bahot Jaruri Hai
Post Retirement Complementary Passes For Railway Employees – Revised Entitlement
Clarification on Promotion Effecting Reservation (RBE 91/2018 dated 19.06.18)
Result of Train Manager (Goods Guard) Departmental Exam
Refund Rules of Unreserved & Reserved Tickets of Indian Railway
Good News – Modification of Recruitment Rule of Train Manager (Guard)
रेलवे के साफ्टवेयर में सेंध कर फर्जीवाड़ा
Vacancy Notification – Filling up of Various Ex-cadre posts of IRIEEN, Nashik road
Regarding Minimum Service Conditions For GDCE (General Departmental Competitive Examination )
Syllabus – Section Controller (Traffic)
Materials Management on Indian Railways (English)
Trouble Shooting -SUB SYSTEM – 19 TRAIN BUS- ACT (RS) – ABB Loco (English) (Part – B)
रेलवे में पति-पत्नी एक जगह होंगे तैनात
Are you sure you want to delete this element?
Close