Breaking News
Result of Train Manager (Goods Guard) Departmental Exam
Shri Ram Karan Yadav takes over as General Manager, Central Railway
Result of Train Manager (Goods Guard) Departmental Exam
जानिए पटरियों के साइड में क्यों लिखे होते हैं नंबर?
SYLLABUS – 30% SELECTION TO GR.B POST OF AEN
(IN CIVIL ENGINEERING DEPARTMENT) As Per Railway Board’s order No. E(GP)2022/2/4 dated 07.11.2022 |
---|
SYLLABUS – AEN ( Gr.B 70% Selection Quota) – Click Above
As per order dt 07.11.2022 |
(A) Civil Engineering (General) |
1. Surveying a. Types i. Surveying basics ii. Surveying equipment Auto level, Total station, DGPS, LIDAR. iii. Leveling – Level Lines – datum, bench marks, simple leveling, fly leveling; recording the levels in field book; method of reducing levels; arithmetical check; longitudinal and cross section contouring. iv. Theodolite Survey – Types of theodolites; measurement of horizontal angles, vertical angles, magnetic bearings and deflection angles; prolonging a straight line; traversing by method of included angles; balancing the survey – closing errors; calculations of latitude and departure. b. Curves- Elements of simple circular curves, setting out simple circular curves. c. Set out works – Setting out buildings, culverts, Central line of Railway alignment. Usage of GPS technology in setting out Centre line of Railway alignments. 2. Strength of Materials, Structural Designs & Drawings a) Strength of Materials: Stress, strain, Hooke’s law, working stress, factor of safety; bending moment and shear force in simply supported beams and cantilevers; simple theory of bending. Moving loads on simply supported beams; influence lines for bending moment and shear force in statically determinate beams; short columns, long columns – empirical formulae. b) Structural Design & Drawing Drawings Different sizes of paper, folding and storage of drawing, plan, elevation, sections, isometric view. c) RCC Structures RCC, methods of design, Working Stress Method and Limit State Method. Design of singly and doubly reinforced rectangular beams including T and L beams. Design of slabs, design of column, IRS Code of Practice for RCC (Concrete Bridge Code). d) Steel Structures Rivets and welds. Sketch and detailing of connections different types of joints and strength determination. Design of tension member and compression member. Plate Girders, IRS Steel Bridge Code. 3. Construction material: Description, specification, properties and uses of building materials – stones, sand, timber, bricks, cement, lime, building hardware, paints varnishes, glasses, and tiles. Concrete mix design, placing, compaction and durability. 4. Foundation & Construction Engineering a) Soil Mechanics b) Foundation Engineering Functions of foundation, different type of foundations – open foundations; well foundations and pile foundations, determination of safe bearing capacity, stress and settlement analysis, method of reducing differential settlements. 5. Hydrology and Hydraulics: a) Hydraulics b) Hydrology Rainfall and run-off; rainfall statistics; rain gauges, run–off calculations by empirical methods, flood discharge estimation; measurement of flood discharge-current meter. c) Hydraulic structures Design of bridges – alignment, number of spans; economic spans; waterway calculations; scour depth, afflux; clearance; depth of foundations; BOX and Pipe Culverts, estimation of design discharge based on para 4.3.4 of sub structure code namely using RDSO report RBF-16 for catchment size less than 25 sqkm and using flood estimation report (Synthetic unit hydrograph concept) for catchment size .25 sqkm, to 2500 sqkm. B) Civil Engineering (Railways) 1. Railway Surveys & Construction Provisions in Engineering Code regarding – Classification of Surveys, Terms of Reference, Principles governing Railway alignment, Ruling gradients, Grade compensation for curves, Horizontal and vertical curves, Hill Surveys, Catch sidings, Tunnels, preparation of various maps and drawings, preparation of Survey reports for RECT, PECT and FLS, Project estimates. 2. Railway Track. (a) Track Structure and Components. (b) Duties. Duties of ADEN, Duties of SSE/P.Way (In-charge), Duties of JE/ SSE/ P.Way (sectional), Duties of JE/ SSE/ P.Way (Other than sectional), Duties of Gang mates, Keymen, Patrolmen, Gateman and Track maintainer. (c) Maintenance of Permanent way. Regular track maintenance, Handling and maintenance of rails, sleepers, fastenings & other misc. Items, Works incidental to regular track maintenance, Record keeping, Maintenance of track in track circuited areas, Maintenance of track in electrified areas (d) Special Maintenance Works. Alumino Thermit welding of rails, Flash-Butt welding of rails, Short welded Rails, Long welded Rails. USFD. (e) Curves and Turnout. (f) Track tolerances and Track Monitoring. (g) Schedule of dimensions. (h) CRS sanction for works affecting passenger running lines. (i) Training and Competency of Permanent Way Staff.
(j) Permanent Way renewals. (k) Engineering Restrictions and Indicators. (l) Level Crossings and Gateman. (m) Working of Trollies, Lorries and Material trains etc. (n) Track Management System. (o) General: (p) Accidents: 3. Maintenance of Bridges a) Maintenance of bridges: Responsibility of the Engineering officials, action to be taken after inspection of bridges; maintenance of substructure – abutments, piers, wing walls and return walls, maintenance of arches, dismantling of arches. Details of common repair techniques – cement pressure grouting, epoxy grouting, shotcreting/ Guniting. Maintenance of RCC & PSC super structures – periodical maintenance, common defects and repair / strengthening techniques; maintenance of super structure (steel) girders – loss of camber in steel girders, cracks in steel works, strengthening of weak girders, replacement of loose rivets; maintenance of HSFG bolts, corrosion and its prevention, protective coatings by painting – periodicity and precautions, patch painting, ordinary paints – for severe and no severe corrosion, metallising & epoxy based paints, Maintenance of welded girders; maintenance of composite girders. Various defects in bed blocks and their remedies; maintenance of bearings; Precautions while carrying out maintenance works on bridges. b) Inspection of bridges: Classification of bridges – major, minor, important; Inspection of Bridges by Permanent Way and Works Inspectors, by Bridge Inspectors (SSE/JE- P. Way, Works, Bridges) – Periodicity/ schedule and details of inspection, record of bridge Inspection, registers to be maintained by the Bridge Inspectors, Certificate of inspection. Inspection by Assistant Divisional Engineers – Bridge Inspection Register, Numerical Rating System (NRS), Unique Rating Number, Condition Rating Number, Overall Rating Number, Certificate by the Assistant Engineer. Details of Inspection of Bridge –foundations, Flooring, masonry in substructure, under-water substructure inspection, arch bridges, protection works and water ways, girder alignment and seating, structural condition of girders, track on the bridge and its approaches, trolley and safety refuges, foot paths, painting, marking HFL and danger level, providing foundation particulars and bridge name boards, flood records at important bridges, road over/under bridges, concrete bridges, special Inspection during Monsoon, equipment required for inspection of bridges. painting of steelworks, laying of bridge sleepers; replacing cracked bed blocks. 4. Rehabilitation of Bridges Reasons for Rehabilitation, special Strengthening, Imposition of speed restriction, Priority for rehabilitation of bridges, Special Inspection, Site Data, Execution of rehabilitation works, Precautions when working on bridges; rebuilding or alterations to bridges – design and execution of bridge works; temporary arrangements; false work for erection of girders; assembly and erection of girders; cranes for erection of girders; testing of girders; proposal for strengthening existing girder spans: methods of regirdering major bridges, Strengthening of foundations, Strengthening/rebuilding of substructure, shaken/displaced/ cracked bed blocks, distressed arch bridges, replacement of nonstandard girders, replacement of pipe culverts, distress in parapets, replacement of small opening, distress in superstructure. 5. Rivers & Floods Behavior of rivers; past history of bridges, danger level at bridges, watchman at important bridges, duties and equipment of bridge watchmen; special inspection during monsoon, action to be taken in the case of weather warning, pitching stone, boulder and monsoon reserve; vigilance during floods; flood records during and after the monsoon; survey of the course of river. Rivers and flood register, Flood Reports, rainfall data, provision of anemometer on bridges. River training works, Guide Bunds, Spurs (Groynes), Marginal Bunds, Closure Bunds, Assisted Cut-Offs, Boulder crates, Protection of approach banks, drop wall & curtain wall i.e. protection measures for minor bridges. 6. Inspection and Maintenance of Tunnels and Deep Cuttings: a) Tunnels – Inspection by Engineering officials, items to be covered in the Inspection, record of inspection, mobile staging for inspection, details of tunnel inspection, ventilation of tunnels, leakage in tunnels and methods of correction, works connected with the maintenance of tunnels. b) Deep Cuttings – General, inspection register of vulnerable cuttings, points to be noted during Inspection of cuttings, action to be taken in the case of boulder drops,action to be taken after inspection of cutting, guarding of vulnerable cuttings. 7. Inspection and Maintenance of Building and Structures (Other than Bridges) a) Inspection & Maintenance of buildings & structures (including steel structures). b) Building Registers c) Periodical maintenance of Works including repairs to leaky roof/water proofing of roofs. d) Standard Measurement Registers for Buildings· e) Dismantling of buildings/structures. f) Retro-fitting I structural repairs of existing weak buildings/structures. 8. Maintenance of sanitary and hygienic conditions in station and railway Colonies; water supply, drainage and sewerage a) Water Supply II. Conveyance and Distribution:- III. Rain water harvesting – legislation, necessity; advantage; types; techniques; estimation of capacity of rain water harvesting pits/ salient methods of recharging subsurface aquifer etc. IV. Water Audit and water Management : b) Sewerage: c) Sanitation: 9. Acquisition, management and disposal of land: General Codes, Manuals, rules: Ownership of Railway land; sanctioning authority for acquisition and relinquishment; Principles of acquisition and relinquishment; Procedure for acquisition and relinquishment; Land plans and schedule; Documents of Handing over and taking over Railway Land; Land Records- Responsibility and procedure for demarcation, verification of railway boundary , land plan etc. Maintenance of right of way; religious structure. Management of railway Land leasing, licensing of land, way leave facility and easement rights, grow more food. Leasing licensing for merchants and vendors at stations, bulk oil installation. Encroachment and responsibly; rules for permission for construction of building near Railway land; instructions regarding cutting/ trimming and sale of natural product like mature tree, dry trees within and outside railway boundary, near electric or telegraph lines , sale of grass right etc. Provisions of Land Acquisition Act. 1989, Right to fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013. 10. Preparation of Plans and Estimates: (a) Preparation of plans: (b) Preparations of estimates:
11. Contract and Execution of Work: a) Contract: b) Execution of Work: 12. Track Machines: a) Organizational structure, duties and inspection: b) Tamping machine and dynamic track stabilizer: c) Ballast cleaning and handling machines: d) Track relaying machines: e) Rail Grinding Machines: f) Planning and deployment of Machines: g) Rules for movement and block working: h) Periodical maintenance and associated infrastructural facility: i) Track Machine Manpower 13. Miscellaneous: a) Engineering plant: b) Explosives: c) Management of Engineering Stores: d) Law and Order |
Part-B – Official Language
Official Language
– Official Language Policy,
– Act, Rules,
– Incentive Schemes etc. |
Syllabus for Establishment Rules |
---|
1 Organization of the Personnel Department in Railways objectives functions and policies of Personnel Department. 2. Recruitment and Training, Classification of Services, Recruitment in Different services, Railway Recruitment Boards & Railway Recruitment Cells Compassionate Ground Appointments, Initial & In Service Training, Refresher Courses, Central Training Institutes, Training Centers in Zones, Divisions & Workshops, Training Modules for different posts, Training under Apprentices Act, Online Training, APARs. 3. General conditions of service in Railways, Seniority, Lien, Inter Railway & Inter Division transfers, Deputation, Promotion Policy & methods. Selection, Suitability, Trade Tests, Leave Rules, Pass Rules, Joining Time Reservation policy, HOER, Overtime, Payment of wages, current CPC Pay Rules, Advances in Railways. 4. Manpower planning, Rightsizing & Benchmarking, creation, extension and surrender of posts, creation of posts against new assets, different types of posts including work charged posts. 5. The Railway Servants (Discipline & Appeal) Rules, 1968 and related instructions. 6. The Railway Services (Conduct) Rules, 1966 and related instructions. 7. Retirement benefits, qualifying service, pension, family pension, commutation gratuity, new pension scheme. 8. Staff welfare, SBF, Railway institutes, Railway schools, Ex-gratia payment, Incentive Bonus Scheme, Staff Grievances Redressal Mechanisms. 9. Industrial relations in Railways, recognized trade unions, industrial disputes. The Industrial Disputes Act, 1947. The Industrial Relations Code, 2020. The Trade Unions Act, 1926, PNM, PREM, JCM, Various Associations & Informal Meetings. 10. The Factories Act, 1948. The workmen’s Compensation Act, 1923. Functions of Labour Enforcement Officers, Right to Information Act. 11. The scope of Information Technology in Railway e – office. HRMS, IPAS , LIMBS, ARPAN, CPGRAMS, ANUBHAV etc. |
Syllabus for Financial Rules |
---|
1. Parliamentary Control over Railway Finance, Public Accountability, Cannons of Financial Propriety. 2. Railway Budget – Budgetary terms, Types of Budgets, Budget cycle, Demand of Grants, Budgetary and Financial Reviews. 3. Rules of Allocation – Classification of expenditure – Control of expenditure – Responsibility Accounting – Performance Budgeting – Exchequer Control – Financial Results of Working lines. 4. Works Program – Financial justification of Works – Surveys – Preparation of Estimates – Capital Budget – Control over Capital Expenditure – Re-appropriation of Funds. 5. Financial control over Stores Expenditure – Purchase and Stores Keeping Procedure – Inventory Control and ABC Analysis. 6. Financial & Cost Control in Railway Workshops/Sheds/Units. 7. Rules and procedure relating to Tenders and contracts for execution of works and Procurement of Stores, M&P Program and RSP. 8. Procedure for Possessing and finalizing Audit Objections and Draft Paras. 9. Delegation of Powers. 10. Losses, Frauds and Embezzlements. 11. General Financial Rules 12. Government e-Market (GeM) 13. Classification of Railway Revenue (Earnings) 14. Information Technology in general with specific reference to Railway’s IT Applications 15. Taxation matters with special focus on GST & Income Tax 16. Organization of CGA and C&AG 17. Any other topic felt necessary from time to time |
This entry was posted in 2 Railway Employee, 6 Departmental Examination, Syllabus, Railway Employee
New Revised Rates of Railway Quarters w.e.f. 1.7.2023
QUESTION PAPER & ANSWER KEY TECH-III/TRD & TECH-III/ELECTRICAL GDCE 31-05-2022
Result of Train Manager (Goods Guard) Departmental Exam
QUESTION BANK – SELECTION OF JE C & W (Carriage & Wagon) (Hindi & English)
रेलगाड़ी टक्कर बचाव प्रणाली (Train Collision Avoidance System)
During October 2023, RPF reunited over 601 children under Operation ‘Nanhe Faristey’
Regarding Admissibility of training allowance to teaching faculty
रनिंग स्टाफ (Running Staff) सबंधित महत्वपूर्ण प्रश्न के उत्तर एवं स्पष्टीकरण
Promotion Order – Sr. Train Manager (Guard) to Sr. Passenger Train Manage Dt 26.7.2023
Railway Board Order Regarding Duty Hours of Running Staff
Shri Ram Karan Yadav takes over as General Manager, Central Railway
Q Paper & Answer AEN (Assistant Engineer) CBT Exam (Hindi/English) Dt 25.06.2023
Duration of Periodical Medical Examination of Non Gazetted Rly Employee (Rule 514 of IRMM Vol – 1)
जानिए पटरियों के साइड में क्यों लिखे होते हैं नंबर?
KNOW ABOUT – SPL KINDS OF LEAVE – RAILWAY
सहायक लोको पायलट के कर्तव्य (Duties of Assistant Loco Pilot)
Consolidated Orders of MACP Scheme by By Personnel Branch BZA Division
Duties & Responsibilities of Nursing Sister, Staff Nurse & Midwife
NPS – Important initiatives for Central Government employee
प्वाइंटसमेन की ड्यूटी लिस्ट ( list of Pointsman Duty)
GDCE Exam Quota Recruitment Process & Syllabus (ALP & TECHNICIANS POSTS)
Result of Train Manager (Goods Guard) Departmental Exam
गंभीर रोगियों को ट्रेन किराए में 75% तक का डिस्काउंट
Question Paper Ticket Examiner in Level-2 PR Quota 33 1/3% Commercial Department Dated 10.10.2021
QUESTION PAPER & ANSWER KEY TECH-III/TRD & TECH-III/ELECTRICAL GDCE 31-05-2022
Frequently asked Question (FAQ) On Privilege ePass / PTO
Question Paper With Answer of Chief Loco Inspector in Level 7 (ER) dt 08-09-2019
Question Paper & Answer – Goods Guard Selection Exam dt. 28.08.2022
Q PAPER – SELECTION OF STAFF & WELFARE INSPECTOR – SWR – 2011
राजभाषा पर विभागीय परीक्षा के लिए उपयोगी प्रश्नोतर
APPLICATION FORM FOR (I) INTER RAILWAY (II) INTER DIVISIONAL/ DEPARTMENTAL TRANSFER (III) DEPUTATION
APPLICATION FORM FOR (I) INTER RAILWAY (II) INTER DIVISIONAL/ DEPARTMENTAL TRANSFER (III) DEPUTATION
गंभीर रोगियों को ट्रेन किराए में 75% तक का डिस्काउंट
गुड/वैरी-गुड के चक्कर में फसेंगे कर्मी…. Chamchagiri Bahot Jaruri Hai
Post Retirement Complementary Passes For Railway Employees – Revised Entitlement
Clarification on Promotion Effecting Reservation (RBE 91/2018 dated 19.06.18)
Result of Train Manager (Goods Guard) Departmental Exam
Refund Rules of Unreserved & Reserved Tickets of Indian Railway
Good News – Modification of Recruitment Rule of Train Manager (Guard)
रेलवे के साफ्टवेयर में सेंध कर फर्जीवाड़ा
Vacancy Notification – Filling up of Various Ex-cadre posts of IRIEEN, Nashik road
Regarding Minimum Service Conditions For GDCE (General Departmental Competitive Examination )
Syllabus – Section Controller (Traffic)
Materials Management on Indian Railways (English)
Trouble Shooting -SUB SYSTEM – 19 TRAIN BUS- ACT (RS) – ABB Loco (English) (Part – B)
रेलवे में पति-पत्नी एक जगह होंगे तैनात
Are you sure you want to delete this element?
Close