How heavy are the freights carried by IR? What are the heaviest freights?

July 18, 2019, 1:14 PM
Share

Among the heaviest freights regularly hauled in India are the 4700+ tonne loads hauled by two (sometimes one, depending on the gradient, etc.) WAG-9 locos in the Dhanbad Division. Earlier, these freights required multiple WAG-5 locos to haul them. Typical heavy freight trains in many sections use two or three WAG-5’s at the front and two or three WAG-5’s at the rear. Iron ore trains on the Kulem-Londa section, as well as other heavy freights in other sections such as on the SER can have up to 7 locos, for instance with 3 at either end and 1 in the middle, connected and operated through a system known as ‘Locotrol’. The Kirandul-Kottavalasa line, before it was electrified, often had many freight rakes hauled by 5 or 6 diesel locos (1960s). (Today 2 or 3 WAG-5 locos are usual for these.)

[5/01] On May 17, 2001, a single WAG-9 achieved a top speed of 100km/h while hauling a rake of 58 BOXN-HA wagons (4700t) on the Sonenagar-Mughalsarai section of ER. The 123km section was covered in 100 minutes, at an average speed of 72km/h.

Trials have been conducted with a single WAG-7 hauling a 6000 tonne rake on level track near Gomoh; 5500t rakes have sometimes been hauled double-headed by WAG-9 locos; and 5500t rakes have also been hauled by two or three WAG-7 (?) locos. In 1998 a single WAM-4 hauled a 9000t (!) rake near Ghaziabad. In the early 1990s, a kilometer-long coal rake for NTPC’s Dadri power plant was hauled on the Grand Chord.

Diesel traction: a single WDG-4 has been used to haul a 4700t rake (58 BOXN wagons).

‘Midhaul’ operations where locomotives are used in the middle of a rake are not common in IR. Locos are more often added at the front and rear of a rake. SCR has run [2/02] some trials using up to 7 locomotives (3 in the front, 3 at the rear, and one in the middle) for a 54-wagon rake on the Castle Rock – Kulem ghat section. Trials on the Hassan-Mangalore section with 58-BOXN wagon rakes were carried out with six WDG-3A locos, 3 in the front and 3 at the rear. Even though the newer locomotives such as the WAG-9 or WDG-4 can haul these heavy loads singlehandedly, many of the older bridges and other structures on IR’s lines cannot withstand the higher longitudinal stresses that these locos exert, hence often these loads are hauled by multiple lower-powered locos. Brake power is also an issue on gradients. Three WDG-3A locos are said to be able to keep a fully-loaded 58-BOXN rake at 30km/h on a 1:50 down gradient using train brakes and dynamic brakes.

The BOXN-HA wagons (see the section on wagon types) was planned for heavier axle-loading and would have eventually allowed the routine hauling of 5220t rakes without the need for longer sidings or loops; however the experiments with this wagon type didn’t work out and they were never manufactured after the initial batch of about 301.

Top Speeds : [Times uncertain here] For 4700t loads on level track: A WDG-2 can attain 68km/h in about 56 minutes (? not certain); a WDG-4 can reach 82km/h in 30 minutes; a WAG-5 can attain a top speed of 80km/h in 33 minutes; for a WAG-7, the figures are 92km/h and 38 minutes (or 70km/h in 15 minutes); and for a WAG-9, 100km/h and 17 minutes. In 2000, successful trials were conducted of running BOXN wagon rakes at 100km/h on the Gomoh-Mughalsarai section, and even up to Ghaziabad.

Goods trains on mainline BG routes are generally restricted to 75km/h, with a few exceptions and special operations. (Parcel vans and milk vans or refrigerated vans for perishables attached to passenger trains can of course go faster.) the average speeds of goods trains on the main trunk routes are around 40-45km/h. There is now [9/04] a proposal to raise the maximum permissible speed limit for goods trains to 100km/h on the trunk routes connecting New Delhi, Mumbai, Chennai, and Kolkata. These six routes (the quadrilateral and its diagonals) total about 10,000km, about 15% of the total IR network, but they account for 75% of the total freight traffic. The raising of the speed limit is expected to raise the average speed to 55km/h, which can potentially increase the utilization of the track substantially.

Source – IFRCA.org

 

 

 

 
Railway Employee (App) Rail News Center ( App) Railway Question Bank ( App) Cover art  

Railway Mutual Transfer

(App)
Information Center  ( App)
 
Disclaimer: The Information /News /Video provided in this Platform has been collected from different sources. We Believe that “Knowledge Is Power” and our aim is to create general awareness among people and make them powerful through easily accessible Information. NOTE: We do not take any responsibility of authenticity of Information/News/Videos.
Share

This entry was posted in 2 Railway Employee, STUDY NEW, Railway Employee