Breaking News
General Manager’s Safety Award for 10 Staff of Central Railway
क्षेत्रीय हिंदी प्रतियोगिता 2023 संपन्न
General Manager’s Safety Award for 10 Staff of Central Railway
जानिए पटरियों के साइड में क्यों लिखे होते हैं नंबर?
Among the heaviest freights regularly hauled in India are the 4700+ tonne loads hauled by two (sometimes one, depending on the gradient, etc.) WAG-9 locos in the Dhanbad Division. Earlier, these freights required multiple WAG-5 locos to haul them. Typical heavy freight trains in many sections use two or three WAG-5’s at the front and two or three WAG-5’s at the rear. Iron ore trains on the Kulem-Londa section, as well as other heavy freights in other sections such as on the SER can have up to 7 locos, for instance with 3 at either end and 1 in the middle, connected and operated through a system known as ‘Locotrol’. The Kirandul-Kottavalasa line, before it was electrified, often had many freight rakes hauled by 5 or 6 diesel locos (1960s). (Today 2 or 3 WAG-5 locos are usual for these.)
[5/01] On May 17, 2001, a single WAG-9 achieved a top speed of 100km/h while hauling a rake of 58 BOXN-HA wagons (4700t) on the Sonenagar-Mughalsarai section of ER. The 123km section was covered in 100 minutes, at an average speed of 72km/h.
Trials have been conducted with a single WAG-7 hauling a 6000 tonne rake on level track near Gomoh; 5500t rakes have sometimes been hauled double-headed by WAG-9 locos; and 5500t rakes have also been hauled by two or three WAG-7 (?) locos. In 1998 a single WAM-4 hauled a 9000t (!) rake near Ghaziabad. In the early 1990s, a kilometer-long coal rake for NTPC’s Dadri power plant was hauled on the Grand Chord.
Diesel traction: a single WDG-4 has been used to haul a 4700t rake (58 BOXN wagons).
‘Midhaul’ operations where locomotives are used in the middle of a rake are not common in IR. Locos are more often added at the front and rear of a rake. SCR has run [2/02] some trials using up to 7 locomotives (3 in the front, 3 at the rear, and one in the middle) for a 54-wagon rake on the Castle Rock – Kulem ghat section. Trials on the Hassan-Mangalore section with 58-BOXN wagon rakes were carried out with six WDG-3A locos, 3 in the front and 3 at the rear. Even though the newer locomotives such as the WAG-9 or WDG-4 can haul these heavy loads singlehandedly, many of the older bridges and other structures on IR’s lines cannot withstand the higher longitudinal stresses that these locos exert, hence often these loads are hauled by multiple lower-powered locos. Brake power is also an issue on gradients. Three WDG-3A locos are said to be able to keep a fully-loaded 58-BOXN rake at 30km/h on a 1:50 down gradient using train brakes and dynamic brakes.
The BOXN-HA wagons (see the section on wagon types) was planned for heavier axle-loading and would have eventually allowed the routine hauling of 5220t rakes without the need for longer sidings or loops; however the experiments with this wagon type didn’t work out and they were never manufactured after the initial batch of about 301.
Top Speeds : [Times uncertain here] For 4700t loads on level track: A WDG-2 can attain 68km/h in about 56 minutes (? not certain); a WDG-4 can reach 82km/h in 30 minutes; a WAG-5 can attain a top speed of 80km/h in 33 minutes; for a WAG-7, the figures are 92km/h and 38 minutes (or 70km/h in 15 minutes); and for a WAG-9, 100km/h and 17 minutes. In 2000, successful trials were conducted of running BOXN wagon rakes at 100km/h on the Gomoh-Mughalsarai section, and even up to Ghaziabad.
Goods trains on mainline BG routes are generally restricted to 75km/h, with a few exceptions and special operations. (Parcel vans and milk vans or refrigerated vans for perishables attached to passenger trains can of course go faster.) the average speeds of goods trains on the main trunk routes are around 40-45km/h. There is now [9/04] a proposal to raise the maximum permissible speed limit for goods trains to 100km/h on the trunk routes connecting New Delhi, Mumbai, Chennai, and Kolkata. These six routes (the quadrilateral and its diagonals) total about 10,000km, about 15% of the total IR network, but they account for 75% of the total freight traffic. The raising of the speed limit is expected to raise the average speed to 55km/h, which can potentially increase the utilization of the track substantially.
Source – IFRCA.org
Railway Employee (App) | Rail News Center ( App) | Railway Question Bank ( App) | (App) | Information Center ( App) |
This entry was posted in 2 Railway Employee, STUDY NEW, Railway Employee
New Revised Rates of Railway Quarters w.e.f. 1.7.2023
QUESTION PAPER & ANSWER KEY TECH-III/TRD & TECH-III/ELECTRICAL GDCE 31-05-2022
Result of Train Manager (Goods Guard) Departmental Exam
QUESTION BANK – SELECTION OF JE C & W (Carriage & Wagon) (Hindi & English)
रेलगाड़ी टक्कर बचाव प्रणाली (Train Collision Avoidance System)
During October 2023, RPF reunited over 601 children under Operation ‘Nanhe Faristey’
Regarding Admissibility of training allowance to teaching faculty
रनिंग स्टाफ (Running Staff) सबंधित महत्वपूर्ण प्रश्न के उत्तर एवं स्पष्टीकरण
Promotion Order – Sr. Train Manager (Guard) to Sr. Passenger Train Manage Dt 26.7.2023
Railway Board Order Regarding Duty Hours of Running Staff
Shri Ram Karan Yadav takes over as General Manager, Central Railway
Q Paper & Answer AEN (Assistant Engineer) CBT Exam (Hindi/English) Dt 25.06.2023
Duration of Periodical Medical Examination of Non Gazetted Rly Employee (Rule 514 of IRMM Vol – 1)
जानिए पटरियों के साइड में क्यों लिखे होते हैं नंबर?
KNOW ABOUT – SPL KINDS OF LEAVE – RAILWAY
सहायक लोको पायलट के कर्तव्य (Duties of Assistant Loco Pilot)
Consolidated Orders of MACP Scheme by By Personnel Branch BZA Division
Duties & Responsibilities of Nursing Sister, Staff Nurse & Midwife
NPS – Important initiatives for Central Government employee
प्वाइंटसमेन की ड्यूटी लिस्ट ( list of Pointsman Duty)
GDCE Exam Quota Recruitment Process & Syllabus (ALP & TECHNICIANS POSTS)
Result of Train Manager (Goods Guard) Departmental Exam
गंभीर रोगियों को ट्रेन किराए में 75% तक का डिस्काउंट
Question Paper Ticket Examiner in Level-2 PR Quota 33 1/3% Commercial Department Dated 10.10.2021
QUESTION PAPER & ANSWER KEY TECH-III/TRD & TECH-III/ELECTRICAL GDCE 31-05-2022
Frequently asked Question (FAQ) On Privilege ePass / PTO
Question Paper With Answer of Chief Loco Inspector in Level 7 (ER) dt 08-09-2019
Question Paper & Answer – Goods Guard Selection Exam dt. 28.08.2022
Q PAPER – SELECTION OF STAFF & WELFARE INSPECTOR – SWR – 2011
राजभाषा पर विभागीय परीक्षा के लिए उपयोगी प्रश्नोतर
APPLICATION FORM FOR (I) INTER RAILWAY (II) INTER DIVISIONAL/ DEPARTMENTAL TRANSFER (III) DEPUTATION
APPLICATION FORM FOR (I) INTER RAILWAY (II) INTER DIVISIONAL/ DEPARTMENTAL TRANSFER (III) DEPUTATION
गंभीर रोगियों को ट्रेन किराए में 75% तक का डिस्काउंट
गुड/वैरी-गुड के चक्कर में फसेंगे कर्मी…. Chamchagiri Bahot Jaruri Hai
Post Retirement Complementary Passes For Railway Employees – Revised Entitlement
Clarification on Promotion Effecting Reservation (RBE 91/2018 dated 19.06.18)
Result of Train Manager (Goods Guard) Departmental Exam
Refund Rules of Unreserved & Reserved Tickets of Indian Railway
Good News – Modification of Recruitment Rule of Train Manager (Guard)
रेलवे के साफ्टवेयर में सेंध कर फर्जीवाड़ा
Vacancy Notification – Filling up of Various Ex-cadre posts of IRIEEN, Nashik road
Regarding Minimum Service Conditions For GDCE (General Departmental Competitive Examination )
Syllabus – Section Controller (Traffic)
Materials Management on Indian Railways (English)
Trouble Shooting -SUB SYSTEM – 19 TRAIN BUS- ACT (RS) – ABB Loco (English) (Part – B)
रेलवे में पति-पत्नी एक जगह होंगे तैनात
Are you sure you want to delete this element?
Close