Breaking News
Result of Train Manager (Goods Guard) Departmental Exam
Shri Ram Karan Yadav takes over as General Manager, Central Railway
Result of Train Manager (Goods Guard) Departmental Exam
जानिए पटरियों के साइड में क्यों लिखे होते हैं नंबर?
The WCAM-1 has a selector on the rightmost side of horizontal control panel for selecting the pantograph. It has four positions, DC, AC, DC-ALT and AC-ALT. In DC and AC-ALT mode, pantograph with two collector shoes is raised; in AC and DC-ALT, pantograph with one collector shoe is raised. The DC pantograph has two shoes and is thicker in its contact area than the AC pantograph because it has to carry a larger current corresponding to the lower voltage.
The ALT positions allow the DC pantograph to be used for AC traction or the AC pantograph to be used for DC traction, in case of damage to one or the other pantograph. I.e., the pantograph itself does not control whether the DC or AC circuitry is in use; the selector switch controls this. In real life, the driver rarely gets a chance to see which pantograph is up; all he knows is the position of selector switch. Sometimes when a damaged pantograph is replaced, a pantograph of a different kind (one shoe instead of two) may be installed; the loco still works, although perhaps suboptimally.
About the only time the driver must raise or lower the pantographs when the locomotive is in motion is at the AC-DC changeover point a little north of Virar on the Virar-Vaitarna section — at a ‘dead zone’ or neutral section where there is a length of overhead catenary with no electricity supplied to it, between the AC and DC catenaries. This usually extends for a length of about two or three catenary sections. About a kilometer before this dead zone, a sign alerts driver with a ‘1000 meters’ warning followed by another for ‘500 meters’ and then a sign saying ‘Dead Zone’.
ये भी पढ़े – सिर्फ 4 घंटे में बन जाएगा पैन कार्ड, नहीं करना होगा 15 दिन इंतजार
Going from Mumbai towards Dahanu, the driver shuts most of the equipment in the loco off (air compressor charged, traction motors cut off, motor generator switched off, etc.), then lowers the DC pantograph and just waits while the loco coasts without power through the dead zone. until the AC section of the catenary is reached. At this point, he raises the AC pantograph. After about 30 seconds, the voltmeter shows 25 kV and he restarts the traction and other equipment.
Note that this arrangement of the catenary is different from that at Igatpuri (see above for DC/AC loco switchover). There, all locos have to stop and wait for the line voltage to be switched on in the intermediate neutral section.
Just before the dead zone, there is also a sign, ‘Open DS for speeds below 40km/h’. The ‘DS’ is the main Disconnecting Switch, a manually operated circuit breaker in the DC supply path from the pantograph, that isolates and grounds the 1.5kV DC downstream circuits from the 25kV supply. If the speed is below 40km/h, the driver needs to keep on accelerating until the very last moment and then throw this switch to isolate the DC circuits on the fly.
This tricky manoeuvre is necessary when the speed is that low, because of the danger of losing momentum and stopping in the dead zone without power in case of any adverse conditions like emergency brake application, or brake pipe parting, etc. (The dead zone is one length of catenary and considering the cross-over structures on the DC and AC sides it is nearly two lengths, hence the loco and train have to have enough momentum for the loco to get across this distance).
Source – IFRCA.org
This entry was posted in Railway General Information, Railway Employee
New Revised Rates of Railway Quarters w.e.f. 1.7.2023
QUESTION PAPER & ANSWER KEY TECH-III/TRD & TECH-III/ELECTRICAL GDCE 31-05-2022
Result of Train Manager (Goods Guard) Departmental Exam
QUESTION BANK – SELECTION OF JE C & W (Carriage & Wagon) (Hindi & English)
रेलगाड़ी टक्कर बचाव प्रणाली (Train Collision Avoidance System)
During October 2023, RPF reunited over 601 children under Operation ‘Nanhe Faristey’
Regarding Admissibility of training allowance to teaching faculty
रनिंग स्टाफ (Running Staff) सबंधित महत्वपूर्ण प्रश्न के उत्तर एवं स्पष्टीकरण
Promotion Order – Sr. Train Manager (Guard) to Sr. Passenger Train Manage Dt 26.7.2023
Railway Board Order Regarding Duty Hours of Running Staff
Shri Ram Karan Yadav takes over as General Manager, Central Railway
Q Paper & Answer AEN (Assistant Engineer) CBT Exam (Hindi/English) Dt 25.06.2023
Duration of Periodical Medical Examination of Non Gazetted Rly Employee (Rule 514 of IRMM Vol – 1)
जानिए पटरियों के साइड में क्यों लिखे होते हैं नंबर?
KNOW ABOUT – SPL KINDS OF LEAVE – RAILWAY
सहायक लोको पायलट के कर्तव्य (Duties of Assistant Loco Pilot)
Consolidated Orders of MACP Scheme by By Personnel Branch BZA Division
Duties & Responsibilities of Nursing Sister, Staff Nurse & Midwife
NPS – Important initiatives for Central Government employee
प्वाइंटसमेन की ड्यूटी लिस्ट ( list of Pointsman Duty)
GDCE Exam Quota Recruitment Process & Syllabus (ALP & TECHNICIANS POSTS)
Result of Train Manager (Goods Guard) Departmental Exam
गंभीर रोगियों को ट्रेन किराए में 75% तक का डिस्काउंट
Question Paper Ticket Examiner in Level-2 PR Quota 33 1/3% Commercial Department Dated 10.10.2021
QUESTION PAPER & ANSWER KEY TECH-III/TRD & TECH-III/ELECTRICAL GDCE 31-05-2022
Frequently asked Question (FAQ) On Privilege ePass / PTO
Question Paper With Answer of Chief Loco Inspector in Level 7 (ER) dt 08-09-2019
Question Paper & Answer – Goods Guard Selection Exam dt. 28.08.2022
Q PAPER – SELECTION OF STAFF & WELFARE INSPECTOR – SWR – 2011
राजभाषा पर विभागीय परीक्षा के लिए उपयोगी प्रश्नोतर
APPLICATION FORM FOR (I) INTER RAILWAY (II) INTER DIVISIONAL/ DEPARTMENTAL TRANSFER (III) DEPUTATION
APPLICATION FORM FOR (I) INTER RAILWAY (II) INTER DIVISIONAL/ DEPARTMENTAL TRANSFER (III) DEPUTATION
गंभीर रोगियों को ट्रेन किराए में 75% तक का डिस्काउंट
गुड/वैरी-गुड के चक्कर में फसेंगे कर्मी…. Chamchagiri Bahot Jaruri Hai
Post Retirement Complementary Passes For Railway Employees – Revised Entitlement
Clarification on Promotion Effecting Reservation (RBE 91/2018 dated 19.06.18)
Result of Train Manager (Goods Guard) Departmental Exam
Refund Rules of Unreserved & Reserved Tickets of Indian Railway
Good News – Modification of Recruitment Rule of Train Manager (Guard)
रेलवे के साफ्टवेयर में सेंध कर फर्जीवाड़ा
Vacancy Notification – Filling up of Various Ex-cadre posts of IRIEEN, Nashik road
Regarding Minimum Service Conditions For GDCE (General Departmental Competitive Examination )
Syllabus – Section Controller (Traffic)
Materials Management on Indian Railways (English)
Trouble Shooting -SUB SYSTEM – 19 TRAIN BUS- ACT (RS) – ABB Loco (English) (Part – B)
रेलवे में पति-पत्नी एक जगह होंगे तैनात
Are you sure you want to delete this element?
Close