Breaking News
विभिन्न खंडों में नॉन इंटरलॉकिंग कार्य के कारण कुछ ट्रेनें प्रभावित
विभिन्न खंडों में नॉन इंटरलॉकिंग कार्य के कारण कुछ ट्रेनें प्रभावित
Vacancy Notification of Manager Guest Service (MGS)-Staff Welfare, Level-7
जानिए पटरियों के साइड में क्यों लिखे होते हैं नंबर?
Multiple signals may be mounted on a signal assembly (bracket post, signal gantry, etc.) to provide signal indications for diverging routes. The signals from left to right correspond to the diverging routes from left to right. If one of the routes is the main line, the signal for it is usually placed higher than the others (the maximum permissible speed applies for running through on it; speeds must be lowered for the divergences).
For instance, a very common combination is for three stop signals to be mounted together, with the middle one being placed higher and providing the indication for the main route, whereas the signals on the left and right of it provide indications for the branches on either side. If all routes are of equal importance, all signals are at the same height. (‘Equal importance’ in practice means all the routes allow the maximum permissible speed for the section.)
In rare circumstances, one can find multiple signals placed on the same mast one above the other; in such a case, the convention is that the highest one refers to the leftmost divergence, and successive signals below it refer to successive routes to the right.
The same convention applies for converging routes (top-to-bottom is left-to-right). Although diverging routes can share a single signal (with a route indicator in colour-light signalling), converging routes never share signals; a separate signal is provided for each line.
For colour-light signals, a junction route indicator or directional type route indicator is commonly used to indicate diverging routes. This consists of an additional set of 5 lunar white lamps in a row at an angle, attached to the main signal. The angle of the junction route indicator corresponds in a rough manner to the angle made by the diverging route. When these additional lamps are lit, they indicate that the signal applies to a diverging route. Otherwise, the signal is taken to apply to the main route.
More than one junction route indicator may be attached to a signal, in the case of facing points where more than two routes diverge, although it is rare to see more than 3 or 4 such indicators (6 is the maximum). The junction route indicator corresponds to a ‘feather’ in UK railway terminology. Junction route indicators are used where the number of diverging routes is smaller and where high visibility is a requirement.
In some cases, especially for home signals at stations that have many platforms, or at routing signals guarding approach to a lot of diverging routes, a theatre route indicator may be provided. This usually indicates the route (or road as it is sometimes termed) with a numeric display. The numerals may be formed using a 7×5 dot-matrix lamp assembly (the multi-lamp route indicator, MLRI), or with lamps lit behind stencils indicating route numbers (the stencil type route indicator, STRI).
There are also projector type route indicators which project the numeral on to an illuminated screen or plate. For all of these, a route indication is always provided, even for the main line, in contrast to the directional route indicators which remain unlit for the main line.
For a signal guarding departure from a station, a theatre route indicator may rarely have ‘M’ or ‘ML’ to indicate ‘main line’, and ‘B’ or ‘BL’ to indicate a ‘branch line’; similarly ‘L’ or ‘LL’ for ‘loop line’. The visibility of these is not as good as that of junction route indicators, hence they are used mainly near or within station limits where speeds are not high, but where the number of diverging routes may be large.
Normally, signals for multiple converging routes are placed on separate posts, and in some cases on a bracket post or signal gantry or bridge. In rare cases more than one signal may be placed on the same post, in which case the topmost refers to the leftmost route, and successive signals below it refer to successive routes to the right.
Source – IFRCA.org
Railway Employee (App) | Rail News Center ( App) | Railway Question Bank ( App) | (App) | Information Center ( App) |
This entry was posted in 2 Railway Employee, STUDY NEW, Railway Employee
New Revised Rates of Railway Quarters w.e.f. 1.7.2023
QUESTION PAPER & ANSWER KEY TECH-III/TRD & TECH-III/ELECTRICAL GDCE 31-05-2022
Result of Train Manager (Goods Guard) Departmental Exam
QUESTION BANK – SELECTION OF JE C & W (Carriage & Wagon) (Hindi & English)
रेलगाड़ी टक्कर बचाव प्रणाली (Train Collision Avoidance System)
भारतीय रेलवे ट्रेनों में यात्रियों को अच्छी गुणवत्ता वाला भोजन उपलब्ध कराने के लिए कई कोशिशें
Regarding Admissibility of training allowance to teaching faculty
रनिंग स्टाफ (Running Staff) सबंधित महत्वपूर्ण प्रश्न के उत्तर एवं स्पष्टीकरण
Promotion Order – Sr. Train Manager (Guard) to Sr. Passenger Train Manage Dt 26.7.2023
Railway Board Order Regarding Duty Hours of Running Staff
विभिन्न खंडों में नॉन इंटरलॉकिंग कार्य के कारण कुछ ट्रेनें प्रभावित
Q Paper & Answer AEN (Assistant Engineer) CBT Exam (Hindi/English) Dt 25.06.2023
Duration of Periodical Medical Examination of Non Gazetted Rly Employee (Rule 514 of IRMM Vol – 1)
जानिए पटरियों के साइड में क्यों लिखे होते हैं नंबर?
KNOW ABOUT – SPL KINDS OF LEAVE – RAILWAY
सहायक लोको पायलट के कर्तव्य (Duties of Assistant Loco Pilot)
Consolidated Orders of MACP Scheme by By Personnel Branch BZA Division
Duties & Responsibilities of Nursing Sister, Staff Nurse & Midwife
NPS – Important initiatives for Central Government employee
प्वाइंटसमेन की ड्यूटी लिस्ट ( list of Pointsman Duty)
GDCE Exam Quota Recruitment Process & Syllabus (ALP & TECHNICIANS POSTS)
Result of Train Manager (Goods Guard) Departmental Exam
गंभीर रोगियों को ट्रेन किराए में 75% तक का डिस्काउंट
Question Paper Ticket Examiner in Level-2 PR Quota 33 1/3% Commercial Department Dated 10.10.2021
QUESTION PAPER & ANSWER KEY TECH-III/TRD & TECH-III/ELECTRICAL GDCE 31-05-2022
Frequently asked Question (FAQ) On Privilege ePass / PTO
Question Paper With Answer of Chief Loco Inspector in Level 7 (ER) dt 08-09-2019
Question Paper & Answer – Goods Guard Selection Exam dt. 28.08.2022
Q PAPER – SELECTION OF STAFF & WELFARE INSPECTOR – SWR – 2011
राजभाषा पर विभागीय परीक्षा के लिए उपयोगी प्रश्नोतर
APPLICATION FORM FOR (I) INTER RAILWAY (II) INTER DIVISIONAL/ DEPARTMENTAL TRANSFER (III) DEPUTATION
APPLICATION FORM FOR (I) INTER RAILWAY (II) INTER DIVISIONAL/ DEPARTMENTAL TRANSFER (III) DEPUTATION
गंभीर रोगियों को ट्रेन किराए में 75% तक का डिस्काउंट
गुड/वैरी-गुड के चक्कर में फसेंगे कर्मी…. Chamchagiri Bahot Jaruri Hai
Post Retirement Complementary Passes For Railway Employees – Revised Entitlement
Clarification on Promotion Effecting Reservation (RBE 91/2018 dated 19.06.18)
Result of Train Manager (Goods Guard) Departmental Exam
Refund Rules of Unreserved & Reserved Tickets of Indian Railway
Good News – Modification of Recruitment Rule of Train Manager (Guard)
Mumbai Division RPF Comes Down Heavily on Touts
Vacancy Notification – Filling up of Various Ex-cadre posts of IRIEEN, Nashik road
Regarding Minimum Service Conditions For GDCE (General Departmental Competitive Examination )
Syllabus – Section Controller (Traffic)
Materials Management on Indian Railways (English)
Trouble Shooting -SUB SYSTEM – 19 TRAIN BUS- ACT (RS) – ABB Loco (English) (Part – B)
रेलवे में पति-पत्नी एक जगह होंगे तैनात
Are you sure you want to delete this element?
Close