General Manager presents Safety Award to 11 Staff of Central Railway
General Manager presents Safety Award to 11 Staff of Central Railway
General Manager presents Safety Award to 11 Staff of Central Railway
Final Seniority lists of Group ‘B’ officers of Civil Engineering Department Indian Railway
Due to restricted visibility in thick fog which pervades northern India in particular during the winter months, trains are known to get delayed and schedules get thrown haywire. Obviously, these delays have their genesis in the fact that the drivers can’t see the signals at sufficient distance and have to reduce speeds when approaching signals, so as to be able to take action considering the aspect of the signal as and when it becomes visible.
Earlier, drivers used to check their speeds based on their own judgment and feel. This led to some drivers being exceedingly slow out of caution, while others occasionally overshot signals out of an anxiety to not be seen as ‘dragging their feet’. Northern Railway decided to lay down instructions as to how the drivers should move in fog. These instructions are given below.
Northern Railway : Train Operation during fog
Automatic Block System: In automatic signal territory, the maximum speed of a train is restricted to 30km/h during dense fog. Depending on the severity of fog, the driver is expected to control the speed of a train and restrict it further if necessary.
Absolute Block System: The maximum speed of a train is restricted to 60km/h in absolute block system territory in dense fog, and depending on the severity of fog, the driver is expected to control the speed of the train and restrict it further if necessary. Further, special rules are in effect as follows:
No train awaiting line clear should be advanced beyond the starter signal.
No shunting is to be carried out on non-isolated lines in a yard after giving line clear to a train.
All IBH in semaphore signal territories are shut down and converted to single block sections for the duration of the fog.
Fog signalmen are provided to place detonators 270m in the rear of the first stop signals so as to give the drivers an audible warning of the proximity of the stop signal. (See below.)
Lime markings are made across the tracks at the signal sighting boards.
Although the final decision on the speed rests with the driver, the upper bounds of 30km/h or 60km/h help them in deciding the appropriate speed, and also allow the operating department staff make better projections in publishing the revised schedules of trains in foggy weather.
Detonators in foggy weather
Detonators are used in foggy weather or otherwise when visibility is severely impaired, to provide an audible indication to the locomotive crew that the train is approaching a signal. These detonators are flat, disc-shaped metal containers, usually coloured red, which contain an explosive mixture that detonates with the application of pressure (and therefore when the wheels of the locomotive pass over). A detonator is attached to the top of the rail using a metal clasp at the bottom of the detonator. These detonators normally have a shelf life of 7 years, although this can be extended to 10 years with annual inspections.
It is the station master’s responsibility to assess whether visibility is impaired badly enough to warrant the use of detonators. At each station, there is a nominated Visibility Test Object (VTO) that is used to gauge visibility. A VTO, which must be at least 180m away, may be a post specially erected for this purpose, with a lamp for the night; or the arm (during the day) and backlight (at night) of a semaphore signal; or the light of a fixed colour light signal (day and night). If the VTO is not visible, then it is necessary to use detonators on all running lines of the station.
Detonators are placed in pairs – 10m apart – at a distance of 270m in the rear of the signal to be protected, which is usually the outermost signal on the approach to a station (in double distant territory, the detonators are placed 270m to the rear of the inner distant signal). Usually, fog signal posts are erected to mark the locations. Recently [11/04] IR has begun erecting shelters by the side of the track as well, for the benefit of the staff who have to stay there to replace the detonators as each train passes by.
The detonators have a safety radius of about 45m; staff must remain outside this distance from the detonators when they explode, to avoid injury; and locomotive crew also take care not to lean out of the cab on approach to stations when there is a possibility that detonators may be in use.
Deploying the detonators is considered a critical safety-related activity, hence the station master is authorized to call on all available staff for this, even off-duty staff if necessary. During prolonged foggy periods or if there are not enough station staff, the permanent way gangs can also be pressed into service for this.
Source – IFRCA.org
This entry was posted in 2 Railway Employee, STUDY NEW, Railway Employee
Unified Pension Scheme (UPS) Gazette Notification (Hindi)
राजभाषा पर विभागीय परीक्षा के लिए उपयोगी प्रश्नोतर
Railway Management Guide – प्रबन्धन
रेलगाड़ी टक्कर बचाव प्रणाली (Train Collision Avoidance System)
रेल यात्री को 20रू में मिलेगा भरपेट भोजन
Transfer on Spouse Ground at Same Station
विकलांग अभ्यर्थी के लिए पदोन्नति में आरक्षण के संबंध में स्पष्टीकरण (H/E)
रनिंग स्टाफ (Running Staff) सबंधित महत्वपूर्ण प्रश्न के उत्तर एवं स्पष्टीकरण
SYLLABUS OF DEPARTMENTAL EXAMINATION OF TNC
Railway Board Order Regarding Duty Hours of Running Staff
Q Paper & Answer AEN (Assistant Engineer) CBT Exam (Hindi/English) Dt 25.06.2023
Know About- चिकित्सा प्रतिपूर्ति दावा में लगने वाले प्रपत्रों की सूची
जानिए पटरियों के साइड में क्यों लिखे होते हैं नंबर?
KNOW ABOUT – SPL KINDS OF LEAVE – RAILWAY
सहायक लोको पायलट के कर्तव्य (Duties of Assistant Loco Pilot)
Consolidated Orders of MACP Scheme by By Personnel Branch BZA Division
Know About- चिकित्सा प्रतिपूर्ति दावा में लगने वाले प्रपत्रों की सूची
Unified Pension Scheme (UPS) Gazette Notification (Hindi)
प्वाइंटसमेन की ड्यूटी लिस्ट ( list of Pointsman Duty)
Clarification – “Regular Employees” for appearing GDCE—Minimum Service Conditions
Shri Dharam Veer Meena Takes Over as General Manager, Central Railway
गंभीर रोगियों को ट्रेन किराए में 75% तक का डिस्काउंट
Question Paper Ticket Examiner in Level-2 PR Quota 33 1/3% Commercial Department Dated 10.10.2021
GDCE QUESTION PAPER & ANSWER KEY TECH-III/TRD & TECH-III/ELECTRICAL Dated 31-05-2022
Frequently asked Question (FAQ) On Privilege ePass / PTO
Question Paper With Answer of Chief Loco Inspector in Level 7 (ER) dt 08-09-2019
Question Paper & Answer – Goods Guard Selection Exam dt. 28.08.2022
Q PAPER – SELECTION OF STAFF & WELFARE INSPECTOR – SWR – 2011
राजभाषा पर विभागीय परीक्षा के लिए उपयोगी प्रश्नोतर
Railway Management Guide – प्रबन्धन
APPLICATION FORM FOR (I) INTER RAILWAY (II) INTER DIVISIONAL/ DEPARTMENTAL TRANSFER (III) DEPUTATION
APPLICATION FORM FOR (I) INTER RAILWAY (II) INTER DIVISIONAL/ DEPARTMENTAL TRANSFER (III) DEPUTATION
AIM & OBJECTIVES OF INDIAN RAILWAYS
गुड/वैरी-गुड के चक्कर में फसेंगे कर्मी…. Chamchagiri Bahot Jaruri Hai
Post Retirement Complementary Passes For Railway Employees – Revised Entitlement
Clarification on Promotion Effecting Reservation (RBE 91/2018 dated 19.06.18)
Result of Train Manager (Goods Guard) Departmental Exam
Refund Rules of Unreserved & Reserved Tickets of Indian Railway
Good News – Modification of Recruitment Rule of Train Manager (Guard)
CBI BUSTS DEPARTMENTAL EXAMINATION PAPER LEAK UNDER EAST CENTRAL RAILWAY
Vacancy Notification – Filling up of Various Ex-cadre posts of IRIEEN, Nashik road
Regarding Minimum Service Conditions For GDCE (General Departmental Competitive Examination )
Regarding Committee to Examine issues relating to Supervisory Categories
Vacancies Notification of Station Masters in Level – 6
Materials Management on Indian Railways (English)
Trouble Shooting -SUB SYSTEM – 19 TRAIN BUS- ACT (RS) – ABB Loco (English) (Part – B)
रेलवे में पति-पत्नी एक जगह होंगे तैनात
Are you sure you want to delete this element?
Close