General Manager presents Safety Award to 11 Staff of Central Railway
General Manager presents Safety Award to 11 Staff of Central Railway
General Manager presents Safety Award to 11 Staff of Central Railway
Final Seniority lists of Group ‘B’ officers of Civil Engineering Department Indian Railway
Fuel pump motor (AC single phase) is fitted on engine right side in Compressor room; its horsepower is 1/1.5. On either side of Fuel pump motor, fuel pump (engine room side) and governor pump (radiator room side) are provided. Initially it is started by battery and after starting engine by auxiliary generator. Necessary circuit breakers are required to close for starting the fuel pump motor. When fuel oil pump starts, it sucks fuel oil from the tank through cage strainer and primary filter (paper type), goes to delivery pipe, relief valve (setting 5.2 Kg/cm2). Relief valve protect the fuel pump from overloading and excess oil returned to fuel tank, then fuel oil goes to the secondary filter(paper type), provided on delivery pipe. Both the filters are provided on engine right side free end near cylinder no.R1
The filtered fuel goes to right side fuel oil gallery and through cross over pipe to left side fuel oil gallery, one copper pipe connection given to regulating valve (setting 4.2 kg/cm2 ) and fuel oil pressure gauge. From both side gallery fuel is supplied to fuel injection pumps with the help of jumper pipes.
FIP is a reciprocating pump operated by camshaft. The FIP increase the fuel oil pressure and sends to the fuel injector through a high pressure pipe. FIP fuel rake having marking from 0 to 30 mm. FIP can be dummied with help of locking device if required.
Fuel injector is fitted in the cylinder head. At the end of compression stroke the fuel oil is injected in atomized form into the cylinder to get power stroke.
Leak off gallery is provided on both side of the engine. Oil leakage of FIP and injector collected in leak off gallery and return to fuel oil tank.
Air lock in fuel oil system – Air lock in fuel oil system is indicated by fluctuation of fuel oil pressure gauge needle OR dropping of FOP. Action to be taken – Loose delivery pipe coupler of fuel pump and allow draining till thick oil flow, further tied the coupler. Book in repair book.
High pressure pipe line burst – If high pressure pipe line is broken then isolate concern cylinder. Maximum two cylinders can be isolate at time, one from each side.
Fuel Oil Economy:-
1. Tank should not be filled fully.
2. Ensure proper handing over and taken over of fuel oil balance.
3. Poor hauling power and leakage of system should be checked and booked.
4. Ensure adequate amount of BP pressure/vacuum in loco and releasing of train brake.
5. Open throttle notch by notch and achieve maximum speed in minimum time. Observe sectional temporary /permanent caution order.
6. Always work on higher notches.
7. If black thick smoke is coming out from chimney, check the reasons.
8. Drive the train as per road and load.
9. Use maximum dynamic brakes.
10. Maximum coasting on down gradient.
11. Engine to shut down on receiving the memo from PCOR.
12. While working light load with multiple unit keep rear loco on idle.
Fuel Efficient Kit
The following changes are made in loco for saving fuel on higher notches.
1. Maximum fuel rack opening is 25-27 mm on 8th notch.
2. 15 mm dia of FIP plunger is increased to 17 mm.
3. Steel cap piston is used.
4. Over lap period of main crank shaft is increase from 1230 to 1400
5. Alco TSC is replaced by ABB/GE TSC
6. Size of After Cooler is increased.
7. Air maize oil bath filter and car body filter are replaced by cyclonic filter.
8. Size of Radiator core is increased.
9. Lube oil relief valve setting is increased to 135 psi and regulating valve 75 psi.
This entry was posted in Diesel Loco
Unified Pension Scheme (UPS) Gazette Notification (Hindi)
राजभाषा पर विभागीय परीक्षा के लिए उपयोगी प्रश्नोतर
Railway Management Guide – प्रबन्धन
रेलगाड़ी टक्कर बचाव प्रणाली (Train Collision Avoidance System)
रेल यात्री को 20रू में मिलेगा भरपेट भोजन
Transfer on Spouse Ground at Same Station
विकलांग अभ्यर्थी के लिए पदोन्नति में आरक्षण के संबंध में स्पष्टीकरण (H/E)
रनिंग स्टाफ (Running Staff) सबंधित महत्वपूर्ण प्रश्न के उत्तर एवं स्पष्टीकरण
SYLLABUS OF DEPARTMENTAL EXAMINATION OF TNC
Railway Board Order Regarding Duty Hours of Running Staff
Q Paper & Answer AEN (Assistant Engineer) CBT Exam (Hindi/English) Dt 25.06.2023
Know About- चिकित्सा प्रतिपूर्ति दावा में लगने वाले प्रपत्रों की सूची
जानिए पटरियों के साइड में क्यों लिखे होते हैं नंबर?
KNOW ABOUT – SPL KINDS OF LEAVE – RAILWAY
सहायक लोको पायलट के कर्तव्य (Duties of Assistant Loco Pilot)
Consolidated Orders of MACP Scheme by By Personnel Branch BZA Division
Know About- चिकित्सा प्रतिपूर्ति दावा में लगने वाले प्रपत्रों की सूची
Unified Pension Scheme (UPS) Gazette Notification (Hindi)
प्वाइंटसमेन की ड्यूटी लिस्ट ( list of Pointsman Duty)
Clarification – “Regular Employees” for appearing GDCE—Minimum Service Conditions
Shri Dharam Veer Meena Takes Over as General Manager, Central Railway
गंभीर रोगियों को ट्रेन किराए में 75% तक का डिस्काउंट
Question Paper Ticket Examiner in Level-2 PR Quota 33 1/3% Commercial Department Dated 10.10.2021
GDCE QUESTION PAPER & ANSWER KEY TECH-III/TRD & TECH-III/ELECTRICAL Dated 31-05-2022
Frequently asked Question (FAQ) On Privilege ePass / PTO
Question Paper With Answer of Chief Loco Inspector in Level 7 (ER) dt 08-09-2019
Question Paper & Answer – Goods Guard Selection Exam dt. 28.08.2022
Q PAPER – SELECTION OF STAFF & WELFARE INSPECTOR – SWR – 2011
राजभाषा पर विभागीय परीक्षा के लिए उपयोगी प्रश्नोतर
Railway Management Guide – प्रबन्धन
APPLICATION FORM FOR (I) INTER RAILWAY (II) INTER DIVISIONAL/ DEPARTMENTAL TRANSFER (III) DEPUTATION
APPLICATION FORM FOR (I) INTER RAILWAY (II) INTER DIVISIONAL/ DEPARTMENTAL TRANSFER (III) DEPUTATION
AIM & OBJECTIVES OF INDIAN RAILWAYS
गुड/वैरी-गुड के चक्कर में फसेंगे कर्मी…. Chamchagiri Bahot Jaruri Hai
Post Retirement Complementary Passes For Railway Employees – Revised Entitlement
Clarification on Promotion Effecting Reservation (RBE 91/2018 dated 19.06.18)
Result of Train Manager (Goods Guard) Departmental Exam
Refund Rules of Unreserved & Reserved Tickets of Indian Railway
Good News – Modification of Recruitment Rule of Train Manager (Guard)
CBI BUSTS DEPARTMENTAL EXAMINATION PAPER LEAK UNDER EAST CENTRAL RAILWAY
Vacancy Notification – Filling up of Various Ex-cadre posts of IRIEEN, Nashik road
Regarding Minimum Service Conditions For GDCE (General Departmental Competitive Examination )
Regarding Committee to Examine issues relating to Supervisory Categories
Vacancies Notification of Station Masters in Level – 6
Materials Management on Indian Railways (English)
Trouble Shooting -SUB SYSTEM – 19 TRAIN BUS- ACT (RS) – ABB Loco (English) (Part – B)
रेलवे में पति-पत्नी एक जगह होंगे तैनात
Are you sure you want to delete this element?
Close