General Manager presents Safety Award to 11 Staff of Central Railway
General Manager presents Safety Award to 11 Staff of Central Railway
General Manager presents Safety Award to 11 Staff of Central Railway
Final Seniority lists of Group ‘B’ officers of Civil Engineering Department Indian Railway
Description – Chemical treated water is filled in this system to avoid corrosion, scaling forming and leakages will visible easily.
On WDG3A loco pressurized water cooling system is provided. Centrifugal water pump is provided on left side free end of the engine, which gets drive from extension shaft no. 1 gear. System capacity is 1210 liters. Filling cap provided on expansion tank No.1.
When diesel engine starts, water pump sucks water from four places viz. expansion tank No.1, TSC water return pipe, right side radiator core via after cooler, and left side radiator core via lube oil cooler. Water is pumped at three places viz. right side engine block, left side engine block and TSC.
Turbo supercharger- Here water cools the intermediate and turbine casing, further it will go to suction side of pump through steam accumulator.
There is gap between outer drum and inner drum. Outer drum rotates continuously with main crankshaft. Radiator fan is coupled with right angle gear box with the help of universal coupling.
When water temperature increases up to 680C, ETS -1 operate, R1 contactor will pick up located on back panel. Battery /auxiliary generator current goes to ECC coil through TCR, ECC coil energized, inner drum starts rotating along with outer drum, which in turn rotates radiator fan with the help of right angle gear box, radiator fan works at slow speed and cools the water.
When the water temperature further increases up to 740 C, ETS2 operates, R2 contactor will pick up by pass TCR, radiator fan rotates with full speed and cools the water.
ETS3 – When water temperature increases up to 940C, ETS3 operates, hot engine indication lamp will glow on both control desk and alarm bell will ringing, it indicates that engine water temperature is above safe level and requires loco pilot attention to cool down the water temperature. Loco pilot should race the engine to cool down the water temperature according to road and load.
LWS- It is provided in compressor room on radiator room wall, the level of water in expansion tank is 14 inches (water capacity of each tank is 155 litters). Whenever water level is remained 1 inch due to leakage or any other reason in expansion tank that time LWS will operate, engine will shut down with hot engine indication on both the control desk and alarm bell will ring.
A pressurized valve is fitted on any one of expansion tank and water level gauge provided on expansion tank No.2 near long hood headlight. Water level gauge having three zones viz. Green, Yellow and Red.
Water leakage from tell- tale pipe of water pump – Keep watch on the water level, if level goes down inform to PCOR.
Lube oil comes from tell – tale pipe of water pump. It is due to the damage of lube oil seal of the water pump.
1. If leakage is drop by drop, watch oil level and work the train, book for repair.
2. If leakage is heavy inform to PCOR. Engine shut down/not starting with hot engine indication
This entry was posted in Diesel Loco
Unified Pension Scheme (UPS) Gazette Notification (Hindi)
राजभाषा पर विभागीय परीक्षा के लिए उपयोगी प्रश्नोतर
Railway Management Guide – प्रबन्धन
रेलगाड़ी टक्कर बचाव प्रणाली (Train Collision Avoidance System)
रेल यात्री को 20रू में मिलेगा भरपेट भोजन
Transfer on Spouse Ground at Same Station
विकलांग अभ्यर्थी के लिए पदोन्नति में आरक्षण के संबंध में स्पष्टीकरण (H/E)
रनिंग स्टाफ (Running Staff) सबंधित महत्वपूर्ण प्रश्न के उत्तर एवं स्पष्टीकरण
SYLLABUS OF DEPARTMENTAL EXAMINATION OF TNC
Railway Board Order Regarding Duty Hours of Running Staff
Q Paper & Answer AEN (Assistant Engineer) CBT Exam (Hindi/English) Dt 25.06.2023
Know About- चिकित्सा प्रतिपूर्ति दावा में लगने वाले प्रपत्रों की सूची
जानिए पटरियों के साइड में क्यों लिखे होते हैं नंबर?
KNOW ABOUT – SPL KINDS OF LEAVE – RAILWAY
सहायक लोको पायलट के कर्तव्य (Duties of Assistant Loco Pilot)
Consolidated Orders of MACP Scheme by By Personnel Branch BZA Division
Know About- चिकित्सा प्रतिपूर्ति दावा में लगने वाले प्रपत्रों की सूची
Unified Pension Scheme (UPS) Gazette Notification (Hindi)
प्वाइंटसमेन की ड्यूटी लिस्ट ( list of Pointsman Duty)
Clarification – “Regular Employees” for appearing GDCE—Minimum Service Conditions
Shri Dharam Veer Meena Takes Over as General Manager, Central Railway
गंभीर रोगियों को ट्रेन किराए में 75% तक का डिस्काउंट
Question Paper Ticket Examiner in Level-2 PR Quota 33 1/3% Commercial Department Dated 10.10.2021
GDCE QUESTION PAPER & ANSWER KEY TECH-III/TRD & TECH-III/ELECTRICAL Dated 31-05-2022
Frequently asked Question (FAQ) On Privilege ePass / PTO
Question Paper With Answer of Chief Loco Inspector in Level 7 (ER) dt 08-09-2019
Question Paper & Answer – Goods Guard Selection Exam dt. 28.08.2022
Q PAPER – SELECTION OF STAFF & WELFARE INSPECTOR – SWR – 2011
राजभाषा पर विभागीय परीक्षा के लिए उपयोगी प्रश्नोतर
Railway Management Guide – प्रबन्धन
APPLICATION FORM FOR (I) INTER RAILWAY (II) INTER DIVISIONAL/ DEPARTMENTAL TRANSFER (III) DEPUTATION
APPLICATION FORM FOR (I) INTER RAILWAY (II) INTER DIVISIONAL/ DEPARTMENTAL TRANSFER (III) DEPUTATION
AIM & OBJECTIVES OF INDIAN RAILWAYS
गुड/वैरी-गुड के चक्कर में फसेंगे कर्मी…. Chamchagiri Bahot Jaruri Hai
Post Retirement Complementary Passes For Railway Employees – Revised Entitlement
Clarification on Promotion Effecting Reservation (RBE 91/2018 dated 19.06.18)
Result of Train Manager (Goods Guard) Departmental Exam
Refund Rules of Unreserved & Reserved Tickets of Indian Railway
Good News – Modification of Recruitment Rule of Train Manager (Guard)
CBI BUSTS DEPARTMENTAL EXAMINATION PAPER LEAK UNDER EAST CENTRAL RAILWAY
Vacancy Notification – Filling up of Various Ex-cadre posts of IRIEEN, Nashik road
Regarding Minimum Service Conditions For GDCE (General Departmental Competitive Examination )
Regarding Committee to Examine issues relating to Supervisory Categories
Vacancies Notification of Station Masters in Level – 6
Materials Management on Indian Railways (English)
Trouble Shooting -SUB SYSTEM – 19 TRAIN BUS- ACT (RS) – ABB Loco (English) (Part – B)
रेलवे में पति-पत्नी एक जगह होंगे तैनात
Are you sure you want to delete this element?
Close