Breaking News
General Manager’s Safety Award for 10 Staff of Central Railway
क्षेत्रीय हिंदी प्रतियोगिता 2023 संपन्न
General Manager’s Safety Award for 10 Staff of Central Railway
जानिए पटरियों के साइड में क्यों लिखे होते हैं नंबर?
Description – Chemical treated water is filled in this system to avoid corrosion, scaling forming and leakages will visible easily.
On WDG3A loco pressurized water cooling system is provided. Centrifugal water pump is provided on left side free end of the engine, which gets drive from extension shaft no. 1 gear. System capacity is 1210 liters. Filling cap provided on expansion tank No.1.
When diesel engine starts, water pump sucks water from four places viz. expansion tank No.1, TSC water return pipe, right side radiator core via after cooler, and left side radiator core via lube oil cooler. Water is pumped at three places viz. right side engine block, left side engine block and TSC.
Turbo supercharger- Here water cools the intermediate and turbine casing, further it will go to suction side of pump through steam accumulator.
There is gap between outer drum and inner drum. Outer drum rotates continuously with main crankshaft. Radiator fan is coupled with right angle gear box with the help of universal coupling.
When water temperature increases up to 680C, ETS -1 operate, R1 contactor will pick up located on back panel. Battery /auxiliary generator current goes to ECC coil through TCR, ECC coil energized, inner drum starts rotating along with outer drum, which in turn rotates radiator fan with the help of right angle gear box, radiator fan works at slow speed and cools the water.
When the water temperature further increases up to 740 C, ETS2 operates, R2 contactor will pick up by pass TCR, radiator fan rotates with full speed and cools the water.
ETS3 – When water temperature increases up to 940C, ETS3 operates, hot engine indication lamp will glow on both control desk and alarm bell will ringing, it indicates that engine water temperature is above safe level and requires loco pilot attention to cool down the water temperature. Loco pilot should race the engine to cool down the water temperature according to road and load.
LWS- It is provided in compressor room on radiator room wall, the level of water in expansion tank is 14 inches (water capacity of each tank is 155 litters). Whenever water level is remained 1 inch due to leakage or any other reason in expansion tank that time LWS will operate, engine will shut down with hot engine indication on both the control desk and alarm bell will ring.
A pressurized valve is fitted on any one of expansion tank and water level gauge provided on expansion tank No.2 near long hood headlight. Water level gauge having three zones viz. Green, Yellow and Red.
Water leakage from tell- tale pipe of water pump – Keep watch on the water level, if level goes down inform to PCOR.
Lube oil comes from tell – tale pipe of water pump. It is due to the damage of lube oil seal of the water pump.
1. If leakage is drop by drop, watch oil level and work the train, book for repair.
2. If leakage is heavy inform to PCOR. Engine shut down/not starting with hot engine indication
Railway Employee (App) | Rail News Center ( App) | Railway Question Bank ( App) | (App) | Information Center ( App) |
This entry was posted in Diesel Loco
New Revised Rates of Railway Quarters w.e.f. 1.7.2023
QUESTION PAPER & ANSWER KEY TECH-III/TRD & TECH-III/ELECTRICAL GDCE 31-05-2022
Result of Train Manager (Goods Guard) Departmental Exam
QUESTION BANK – SELECTION OF JE C & W (Carriage & Wagon) (Hindi & English)
रेलगाड़ी टक्कर बचाव प्रणाली (Train Collision Avoidance System)
During October 2023, RPF reunited over 601 children under Operation ‘Nanhe Faristey’
Regarding Admissibility of training allowance to teaching faculty
रनिंग स्टाफ (Running Staff) सबंधित महत्वपूर्ण प्रश्न के उत्तर एवं स्पष्टीकरण
Promotion Order – Sr. Train Manager (Guard) to Sr. Passenger Train Manage Dt 26.7.2023
Railway Board Order Regarding Duty Hours of Running Staff
Shri Ram Karan Yadav takes over as General Manager, Central Railway
Q Paper & Answer AEN (Assistant Engineer) CBT Exam (Hindi/English) Dt 25.06.2023
Duration of Periodical Medical Examination of Non Gazetted Rly Employee (Rule 514 of IRMM Vol – 1)
जानिए पटरियों के साइड में क्यों लिखे होते हैं नंबर?
KNOW ABOUT – SPL KINDS OF LEAVE – RAILWAY
सहायक लोको पायलट के कर्तव्य (Duties of Assistant Loco Pilot)
Consolidated Orders of MACP Scheme by By Personnel Branch BZA Division
Duties & Responsibilities of Nursing Sister, Staff Nurse & Midwife
NPS – Important initiatives for Central Government employee
प्वाइंटसमेन की ड्यूटी लिस्ट ( list of Pointsman Duty)
GDCE Exam Quota Recruitment Process & Syllabus (ALP & TECHNICIANS POSTS)
Result of Train Manager (Goods Guard) Departmental Exam
गंभीर रोगियों को ट्रेन किराए में 75% तक का डिस्काउंट
Question Paper Ticket Examiner in Level-2 PR Quota 33 1/3% Commercial Department Dated 10.10.2021
QUESTION PAPER & ANSWER KEY TECH-III/TRD & TECH-III/ELECTRICAL GDCE 31-05-2022
Frequently asked Question (FAQ) On Privilege ePass / PTO
Question Paper With Answer of Chief Loco Inspector in Level 7 (ER) dt 08-09-2019
Question Paper & Answer – Goods Guard Selection Exam dt. 28.08.2022
Q PAPER – SELECTION OF STAFF & WELFARE INSPECTOR – SWR – 2011
राजभाषा पर विभागीय परीक्षा के लिए उपयोगी प्रश्नोतर
APPLICATION FORM FOR (I) INTER RAILWAY (II) INTER DIVISIONAL/ DEPARTMENTAL TRANSFER (III) DEPUTATION
APPLICATION FORM FOR (I) INTER RAILWAY (II) INTER DIVISIONAL/ DEPARTMENTAL TRANSFER (III) DEPUTATION
गंभीर रोगियों को ट्रेन किराए में 75% तक का डिस्काउंट
गुड/वैरी-गुड के चक्कर में फसेंगे कर्मी…. Chamchagiri Bahot Jaruri Hai
Post Retirement Complementary Passes For Railway Employees – Revised Entitlement
Clarification on Promotion Effecting Reservation (RBE 91/2018 dated 19.06.18)
Result of Train Manager (Goods Guard) Departmental Exam
Refund Rules of Unreserved & Reserved Tickets of Indian Railway
Good News – Modification of Recruitment Rule of Train Manager (Guard)
रेलवे के साफ्टवेयर में सेंध कर फर्जीवाड़ा
Vacancy Notification – Filling up of Various Ex-cadre posts of IRIEEN, Nashik road
Regarding Minimum Service Conditions For GDCE (General Departmental Competitive Examination )
Syllabus – Section Controller (Traffic)
Materials Management on Indian Railways (English)
Trouble Shooting -SUB SYSTEM – 19 TRAIN BUS- ACT (RS) – ABB Loco (English) (Part – B)
रेलवे में पति-पत्नी एक जगह होंगे तैनात
Are you sure you want to delete this element?
Close