General Manager presents Safety Award to 11 Staff of Central Railway
General Manager presents Safety Award to 11 Staff of Central Railway
General Manager presents Safety Award to 11 Staff of Central Railway
Final Seniority lists of Group ‘B’ officers of Civil Engineering Department Indian Railway
Supercharging – The process of increase air pressure more than atmospheric pressure and deliver in cylinder for fuel combustion is called supercharging. It increases efficiency of the engine up to 50 % in this type of engine fuel burn with atmospheric air having pressure. In diesel loco Turbo Super Charger is provided for supercharging.
Turbo Super Charger – TSC is provided at free end, above after cooler. It works with the help of exhaust gasses.
TSC having four casing
1. Gas inlet casing
2. Turbine casing
3. Intermediate casing
Gas inlet casing is connected with exhaust manifold. 14 exhaust elbows connected in exhaust manifold. R1 & L1 exhaust elbow are connected directly to gas inlet casing. One dome is provided in this casing. Rotor shaft is fitted in intermediate casing; turbine and blower are fitted on this shaft. Turbine is fitted in turbine casing and blower in blower casing. Gas inlet casing is connected to turbine casing through nozzle ring. One side of blower casing connected with cyclonic filter and other with expansion joint to after cooler. TSC cooled by engine coolant. Rotor shaft bearing is lubricated by engine lube oil system.
Working – Exhaust gases discharged by engine goes to gas inlet casing of TSC through exhaust manifold. In this casing gasses gets the direction with the help of dome and nozzle ring and hit the turbine blades and goes off to atmosphere through chimney. When turbine starts rotating same time blower also starts rotating since fitted on the common shaft. Partial vacuum is creating in blower casing hence atmospheric air flow from cyclonic filter.
Blower compress the air into after cooler, where it cools with water hence its density is increased. The other end of after cooler is connected to ‘V’ gallery where the pressurized air is collected and collected air pressure is called Booster Air Pressure. Booster Air Pressure gauge is provided in Loco Pilot cab. Maximum BAP is 1.97 kg/cm2 . At the time of suction stroke each cylinder is charged with super charged air through inlet elbow.
After cooler – To increase the density and reduces the temperature of air, this is provided below TSC on engine free end. It has U shaped pipes, through which water passes from inlet to outlet. The air is cooled around the U shaped pipes through radiation process. The cooled and dense air is stored in ‘V’ gallery. Tale – tell pipe provided in bottom of after cooler, if water leakage through it, fail the loco and inform the PCOR.
This entry was posted in Diesel Loco
Unified Pension Scheme (UPS) Gazette Notification (Hindi)
राजभाषा पर विभागीय परीक्षा के लिए उपयोगी प्रश्नोतर
Railway Management Guide – प्रबन्धन
रेलगाड़ी टक्कर बचाव प्रणाली (Train Collision Avoidance System)
रेल यात्री को 20रू में मिलेगा भरपेट भोजन
Transfer on Spouse Ground at Same Station
विकलांग अभ्यर्थी के लिए पदोन्नति में आरक्षण के संबंध में स्पष्टीकरण (H/E)
रनिंग स्टाफ (Running Staff) सबंधित महत्वपूर्ण प्रश्न के उत्तर एवं स्पष्टीकरण
SYLLABUS OF DEPARTMENTAL EXAMINATION OF TNC
Railway Board Order Regarding Duty Hours of Running Staff
Q Paper & Answer AEN (Assistant Engineer) CBT Exam (Hindi/English) Dt 25.06.2023
Know About- चिकित्सा प्रतिपूर्ति दावा में लगने वाले प्रपत्रों की सूची
जानिए पटरियों के साइड में क्यों लिखे होते हैं नंबर?
KNOW ABOUT – SPL KINDS OF LEAVE – RAILWAY
सहायक लोको पायलट के कर्तव्य (Duties of Assistant Loco Pilot)
Consolidated Orders of MACP Scheme by By Personnel Branch BZA Division
Know About- चिकित्सा प्रतिपूर्ति दावा में लगने वाले प्रपत्रों की सूची
Unified Pension Scheme (UPS) Gazette Notification (Hindi)
प्वाइंटसमेन की ड्यूटी लिस्ट ( list of Pointsman Duty)
Clarification – “Regular Employees” for appearing GDCE—Minimum Service Conditions
Shri Dharam Veer Meena Takes Over as General Manager, Central Railway
गंभीर रोगियों को ट्रेन किराए में 75% तक का डिस्काउंट
Question Paper Ticket Examiner in Level-2 PR Quota 33 1/3% Commercial Department Dated 10.10.2021
GDCE QUESTION PAPER & ANSWER KEY TECH-III/TRD & TECH-III/ELECTRICAL Dated 31-05-2022
Frequently asked Question (FAQ) On Privilege ePass / PTO
Question Paper With Answer of Chief Loco Inspector in Level 7 (ER) dt 08-09-2019
Question Paper & Answer – Goods Guard Selection Exam dt. 28.08.2022
Q PAPER – SELECTION OF STAFF & WELFARE INSPECTOR – SWR – 2011
राजभाषा पर विभागीय परीक्षा के लिए उपयोगी प्रश्नोतर
Railway Management Guide – प्रबन्धन
APPLICATION FORM FOR (I) INTER RAILWAY (II) INTER DIVISIONAL/ DEPARTMENTAL TRANSFER (III) DEPUTATION
APPLICATION FORM FOR (I) INTER RAILWAY (II) INTER DIVISIONAL/ DEPARTMENTAL TRANSFER (III) DEPUTATION
AIM & OBJECTIVES OF INDIAN RAILWAYS
गुड/वैरी-गुड के चक्कर में फसेंगे कर्मी…. Chamchagiri Bahot Jaruri Hai
Post Retirement Complementary Passes For Railway Employees – Revised Entitlement
Clarification on Promotion Effecting Reservation (RBE 91/2018 dated 19.06.18)
Result of Train Manager (Goods Guard) Departmental Exam
Refund Rules of Unreserved & Reserved Tickets of Indian Railway
Good News – Modification of Recruitment Rule of Train Manager (Guard)
CBI BUSTS DEPARTMENTAL EXAMINATION PAPER LEAK UNDER EAST CENTRAL RAILWAY
Vacancy Notification – Filling up of Various Ex-cadre posts of IRIEEN, Nashik road
Regarding Minimum Service Conditions For GDCE (General Departmental Competitive Examination )
Regarding Committee to Examine issues relating to Supervisory Categories
Vacancies Notification of Station Masters in Level – 6
Materials Management on Indian Railways (English)
Trouble Shooting -SUB SYSTEM – 19 TRAIN BUS- ACT (RS) – ABB Loco (English) (Part – B)
रेलवे में पति-पत्नी एक जगह होंगे तैनात
Are you sure you want to delete this element?
Close