General Manager presents Safety Award to 11 Staff of Central Railway
General Manager presents Safety Award to 11 Staff of Central Railway
General Manager presents Safety Award to 11 Staff of Central Railway
Final Seniority lists of Group ‘B’ officers of Civil Engineering Department Indian Railway
Inaugurated on Jan. 26, 1950, CLW produced its first locomotive by Nov. 1, 1950 (a WG loco, #8401, named ‘Deshbandhu’ for Deshbandhu Chittaranjan Das, an Indian freedom-fighter; incidentally it was his widow, Basanti Devi, who inaugurated the works). CLW, originally named just the Locomotive Manufacturing Works, was located near a village called Mihijam, which was shortly afterwards renamed Chittaranjan. It is said that originally the locomotive works, which were under planning even in the mid-1940s, were to be set up at Kalyani near Howrah, but a concern about losing such a strategic asset in the foreseen partition of British India resulted in the shift to Chittaranjan, on the border of West Bengal and Bihar (Chittaranjan railway station is in Bihar).
ये भी पढ़े – इंडिया की इन खतरनाक और रहस्यमयी जगहों पर जाकर लें अलग एडवेंचर का अहसास
CLW became a major producer of steam locomotives, producing a large number of BG and MG steam locomotives through 1972 (total count – 2351). The last BG steam loco made in India, a WG (#10560, ‘Antim Sitara’ (‘The Last Star’) was delivered by CLW on June 30, 1970, and the last steam loco made in India was the MG YG classloco (#3573), delivered on Feb. 5, 1972.
CLW started early on the manufacture of electric locos, building the WCM-5 series DC locos starting in 1961. The first one was named ‘Lokamanya’, and delivered on Oct. 14, 1961. A few years later it began production of AC electric locos, starting with ‘Bidhan’, a WAG-1 class loco delivered on Nov. 16, 1963, which was also notable as the first fully Indian-built electric locomotive. Since then CLW has manufactured ever more sophisticated generations of electric locomotives, most recently delivering the advanced WAP-5 and WAP-7 3-phase AC locomotives. It has a capacity of around 200 or so electric locomotives a year.
CLW has also manufactured many diesel locos, mainly diesel-hydraulic shunters such as the WDS-4 class (begun in 1967-1968, although large numbers were produced only in 1969). In the ’70s and ’80s it built some diesels in the ZDM series and some YDM-2 units (diesel-electrics). Total diesel loco count – over 660 BG diesel shunters, over 140 NG diesels, and over 40 BG mainline diesels.
DLW was set up in 1961 and rolled out its first locomotive on Jan. 3., 1964 – a WDM-2, assembled from an Alco kit. It has evolved into an integrated diesel locomotive manufacturing plant, capable of building all components of the locomotives in-house, including the engines, superstructures, fabricated bogies, and underframes.
With technology transfer arrangements from manufacturers such as GM-EMD, DLW today produces advanced diesels with high efficiency and low maintenance costs. DLW has supplied a large variety of diesel locomotives (mostly diesel-electrics) to IR and numerous public-sector concerns (steel plants, power plants, ports, etc.). DLW has also exported locomotives to other countries such as Tanzania, Vietnam, Sri Lanka, Bangladesh, and Malaysia. Recently [2004] it has also got orders for 1350hp Cape gauge locos for Sudan (3), 1350hp MG locos for Myanmar (11), 2300hp Cape gauge locos for Angola (6), etc. It has also branched out into manufacturing non-railway items such as 2.4MW diesel generator sets (based on the Alco 251 engine!) to offset a recent decline in orders from IR. (Although, simultaneously, it has helped DMW (see below) and Parel Workshops (see below) to gain expertise in assembling locomotives as it hasn’t been able to keep up with the demand for some classes of locos, especially industrial shunters.) DLW’s production capacity is around 240 locomotives a year.
Source – IFRCA.org
This entry was posted in 2 Railway Employee, Railway General Information, Railway Employee
Unified Pension Scheme (UPS) Gazette Notification (Hindi)
राजभाषा पर विभागीय परीक्षा के लिए उपयोगी प्रश्नोतर
Railway Management Guide – प्रबन्धन
रेलगाड़ी टक्कर बचाव प्रणाली (Train Collision Avoidance System)
रेल यात्री को 20रू में मिलेगा भरपेट भोजन
Transfer on Spouse Ground at Same Station
विकलांग अभ्यर्थी के लिए पदोन्नति में आरक्षण के संबंध में स्पष्टीकरण (H/E)
रनिंग स्टाफ (Running Staff) सबंधित महत्वपूर्ण प्रश्न के उत्तर एवं स्पष्टीकरण
SYLLABUS OF DEPARTMENTAL EXAMINATION OF TNC
Railway Board Order Regarding Duty Hours of Running Staff
Q Paper & Answer AEN (Assistant Engineer) CBT Exam (Hindi/English) Dt 25.06.2023
Know About- चिकित्सा प्रतिपूर्ति दावा में लगने वाले प्रपत्रों की सूची
जानिए पटरियों के साइड में क्यों लिखे होते हैं नंबर?
KNOW ABOUT – SPL KINDS OF LEAVE – RAILWAY
सहायक लोको पायलट के कर्तव्य (Duties of Assistant Loco Pilot)
Consolidated Orders of MACP Scheme by By Personnel Branch BZA Division
Know About- चिकित्सा प्रतिपूर्ति दावा में लगने वाले प्रपत्रों की सूची
Unified Pension Scheme (UPS) Gazette Notification (Hindi)
प्वाइंटसमेन की ड्यूटी लिस्ट ( list of Pointsman Duty)
Clarification – “Regular Employees” for appearing GDCE—Minimum Service Conditions
Shri Dharam Veer Meena Takes Over as General Manager, Central Railway
गंभीर रोगियों को ट्रेन किराए में 75% तक का डिस्काउंट
Question Paper Ticket Examiner in Level-2 PR Quota 33 1/3% Commercial Department Dated 10.10.2021
GDCE QUESTION PAPER & ANSWER KEY TECH-III/TRD & TECH-III/ELECTRICAL Dated 31-05-2022
Frequently asked Question (FAQ) On Privilege ePass / PTO
Question Paper With Answer of Chief Loco Inspector in Level 7 (ER) dt 08-09-2019
Question Paper & Answer – Goods Guard Selection Exam dt. 28.08.2022
Q PAPER – SELECTION OF STAFF & WELFARE INSPECTOR – SWR – 2011
राजभाषा पर विभागीय परीक्षा के लिए उपयोगी प्रश्नोतर
Railway Management Guide – प्रबन्धन
APPLICATION FORM FOR (I) INTER RAILWAY (II) INTER DIVISIONAL/ DEPARTMENTAL TRANSFER (III) DEPUTATION
APPLICATION FORM FOR (I) INTER RAILWAY (II) INTER DIVISIONAL/ DEPARTMENTAL TRANSFER (III) DEPUTATION
AIM & OBJECTIVES OF INDIAN RAILWAYS
गुड/वैरी-गुड के चक्कर में फसेंगे कर्मी…. Chamchagiri Bahot Jaruri Hai
Post Retirement Complementary Passes For Railway Employees – Revised Entitlement
Clarification on Promotion Effecting Reservation (RBE 91/2018 dated 19.06.18)
Result of Train Manager (Goods Guard) Departmental Exam
Refund Rules of Unreserved & Reserved Tickets of Indian Railway
Good News – Modification of Recruitment Rule of Train Manager (Guard)
CBI BUSTS DEPARTMENTAL EXAMINATION PAPER LEAK UNDER EAST CENTRAL RAILWAY
Vacancy Notification – Filling up of Various Ex-cadre posts of IRIEEN, Nashik road
Regarding Minimum Service Conditions For GDCE (General Departmental Competitive Examination )
Regarding Committee to Examine issues relating to Supervisory Categories
Vacancies Notification of Station Masters in Level – 6
Materials Management on Indian Railways (English)
Trouble Shooting -SUB SYSTEM – 19 TRAIN BUS- ACT (RS) – ABB Loco (English) (Part – B)
रेलवे में पति-पत्नी एक जगह होंगे तैनात
Are you sure you want to delete this element?
Close