Stock Report – Train Operation

20-11-2021

STOCK REPORT    Stock report is summarized statement of available number of wagons in hand or requirement of wagons at station, which is reported to the control office over telephone daily 16 hours by station and yards. Where telephone is not available or there is a busy schedule of works or in non-controlled sections, the stock report is sent by any train. The stock report gives position of rolling stocks in the division at 20 hours of last day. Hence it is otherwise called 20 O’ Clock report. Stock report is reported in various codes used for the purpose. In control office, it is recorded in two sheets on printed format bearing the number T/84 B – 182. The Stock Report gives the

Read More
WDG-3A – रिपेयर बुक(Repair Book)
January 4, 2021

Read More
WDG-3A – ट्विन बीम हेडलाईट ( Twin Beam Head Light)
January 4, 2021

Twin Beam Head Light  On WDG3A loco two head lights are provided on each side of Loco viz. short hood and long hood. HLB (head light circuit breaker) is provided on front panel. Head light rotating switch is provided on both control stand having 6 positions. To glow head light following switches should be in on position 1. Battery knife

Read More
WDG-3A – लोको स्टेबल करना ( Procedure for Stabling Loco )
January 4, 2021

 Procedure for Stabling Loco  1. Loco to be stop after clearing fouling mark. 2. Apply loco brake by SA-9. 3. Apply hand brake. 4. Apply wooden wedges/Iron skids. 5. Shut down the engine properly and put off all circuit breakers and switches. 6. Remove A9, SA9 handle in application position and RH in neutral position. 7. Entries to

Read More
WDG-3A – लोको चलाने का तरीका (How to Move the Loco)
January 4, 2021

How to Move the Loco First of all check the locomotive after ensuring every thing is normal then starts the engine systematically. All pressure to be adjusted and ensure loco brake in applied condition, then release hand brake, remove wooden wedges. Move the Loco with following procedure – 1. Put ECS on RUN. 2. Put RH in desired

Read More
WDG-3A – गेजेस (Gauges )
January 4, 2021

Gauges  Following gauges are provided in loco  1. Brake Cylinder Pressure Gauge It is provided on both control stands. Brake cylinder pressure gauge shows 3.0 kg/cm² pressure on loco brake application. 2. Brake Pipe Pressure Gauge It is located on both control stands. BP pressure gauge shows 5.0 kg/cm² on A9 release condition. 3. MR

Read More
WDG-3A व्हील स्किडिंग के बचाव हेतु क्या करे और क्या न करे (To Avoid Wheel Skidding Do’s /Don’t)
January 4, 2021

Read More

Latest News

Result of Train Manager (Goods Guard) Departmental Exam