ट्रेन्स क्लर्क के कर्तव्य (Duties of Train Clerk)

20-11-2021
WDG-3A – मॉडिफिकेशन ( Modifications )
January 4, 2021

 Modifications  Digital Water Level Indicator  It is provided in loco pilot cab, its sensor is fitted in expansion tank no. 1, it shows water level in the tank. On this indicator colour indication lamp are provided 1. Green (full) 2. Yellow (half) (danger below 50 %) 3. Red (danger below 20%)  Auto manual switch and fuse is

Read More
WDG-3A – लोकोमोटिव का परीक्षण ( Checking Of Locomotive )
January 4, 2021

 Checking Of Locomotive  Checking of loco is essential for safe operation. It should be carried out with in specified condition and time. It is carried out united by Loco pilot and Assistant loco pilot in following ways - A) Examination Of Locomotive Before Leaving The Shed While Engine Is In Shut Down Condition - a) In Loco Pilot Cab

Read More
WDG-3A – रिपेयर बुक(Repair Book)
January 4, 2021

Read More
WDG-3A – ट्विन बीम हेडलाईट ( Twin Beam Head Light)
January 4, 2021

Twin Beam Head Light  On WDG3A loco two head lights are provided on each side of Loco viz. short hood and long hood. HLB (head light circuit breaker) is provided on front panel. Head light rotating switch is provided on both control stand having 6 positions. To glow head light following switches should be in on position 1. Battery knife

Read More
WDG-3A – लोको स्टेबल करना ( Procedure for Stabling Loco )
January 4, 2021

 Procedure for Stabling Loco  1. Loco to be stop after clearing fouling mark. 2. Apply loco brake by SA-9. 3. Apply hand brake. 4. Apply wooden wedges/Iron skids. 5. Shut down the engine properly and put off all circuit breakers and switches. 6. Remove A9, SA9 handle in application position and RH in neutral position. 7. Entries to

Read More
WDG-3A – लोको चलाने का तरीका (How to Move the Loco)
January 4, 2021

How to Move the Loco First of all check the locomotive after ensuring every thing is normal then starts the engine systematically. All pressure to be adjusted and ensure loco brake in applied condition, then release hand brake, remove wooden wedges. Move the Loco with following procedure – 1. Put ECS on RUN. 2. Put RH in desired

Read More

Latest News

Integral Coach Factory, Perambur