नियुक्ति अधिकारी के संबंध में महत्वपूर्ण आदेश एवं कोर्ट के निर्देश

26-11-2021

नियुक्ति अधिकारी के संबंध में महत्वपूर्ण आदेश एवं कोर्ट के

Read More
ACT (RS) ABB Loco (English) (6. SUB SYSTEM DESCRIPTION)
January 10, 2021

List Of Isolation Messages  SSO1:                Main power  MAIN POWER ISOLATED; VCB inhibited Loco is dead Ask for relief loco SSO2:                traction bogie 1  BOGIE-1ISOLATED;Only half T.E.and B.E.available Inform maintenance staff SSO3:               Traction bogie 2  BOGIE 2

Read More
ACT (RS) ABB Loco (English) (5. FAULT DIAGNOSTIC)
January 10, 2021

Faults With Priority.1:    - The action to be taken is entirely clear. - The action to be taken must be initiated immediately. - A protective action is initiated (VCB OFF) - BPFA will glow. - LSFI will flicker. - Priority-1 message will display on screen Faults With Priority-2:  - The action to be taken is not entirely clear. -

Read More
ACT (RS) ABB Loco (English) (4. DESCRIPTION OF PANNELS)
January 10, 2021

Read More
ACT (RS) ABB Loco (English) (3. LAY-OUT OF MACHINE ROOM & CAB)
January 10, 2021

Read More
2. GENERAL FEATURES & ADVANTAGES OF 3-PHASE ELECTRIC LOCO -ACT (RS) ABB Loco (English)
January 10, 2021

GENERAL FEATURES OF 3-PHASE AC LOCO  Advanced Technological Features: - In addition to the provision of latest 3-phase traction drive system; the 3-phase locomotives have certain improved technical features as compared to the conventional locomotives so being used on IR. Some major features are listed below. 1) Digital electronics based

Read More
1. TECHNICAL DATA & ABBREVIATIONS – ACT (RS) ABB Loco (English)
January 10, 2021

ABBREVIATIONS  ALG Drive Control Unit - Drive Inverter and Line converter Control ASC Driver Converter Control ASR Drive Converter Key switch BLCP Spring-loaded switch for Main compressors BLDJ Spring-loaded switch for Main circuit breaker BLHO Spring-loaded switch for Hotel load(notactive on

Read More

Latest News

General Manager’s Safety Award for 10 Staff of Central Railway