ACT (RS) WAG5 Book (Hindi) (10. मल्टीपल यूनिट )

12-01-2021
AC Simulator – TRAIN HANDLING IN SAG OR DIP GRADIENT (सैग या डिप में गाडी का संचालन )
January 6, 2021

TRAIN HANDLING IN SAG OR DIP GRADIENT  Starting of train from sag or dip gradient i) Advance MP to notch 1 st and note the increase of current on the ammeter. ii) Release SA-9 (loco brakes) and wait for the release of the locomotive brakes. iii) After a few second pause advance the MP and again note the ammeter indication. If

Read More
AC Simulator – TRAIN HANDLING IN HUMP (KNOLL) & CRESTING GRADIENT (हम्प (नॉल) और शिखर वाले ग्रेडीयेंट पर गाड़ी का संचालन )
January 6, 2021

TRAIN HANDLING IN HUMP (KNOLL) & CRESTING GRADIENT  Starting of train on a hump or cresting grade There are no special requirements for starting on a hump or cresting grade. The starting procedure are the same as for starting the train on an ascending (up) grade. Zonal Railway Training Institute, Central Railway, Bhusawal ©AC Loco

Read More
AC Simulator – DYNAMIC BRAKE (डायनामिक ब्रेक)
January 6, 2021

DYNAMIC BRAKE    Purpose of Dynamic Brake    The dynamic brake is used as retarding brake to control the speed of a train. It is not intended that the dynamic brake alone will always limit the train to the desired speed and, at times, the automatic train brakes may have to be applied in conjunction with the dynamic brake to control the

Read More
AC Simulator – TRAIN HANDLING ON DESCENDING (DOWN) GRADE (डाउन (डिसेंडिंग) ग्रेडियेंट का संचालन )
January 6, 2021

TRAIN HANDLING ON DESCENDING (DOWN) GRADE  Starting of train in descending grade Assuming train brakes & loco brakes are applied i) Release loco brakes first then release train brakes. ii) Allow train to slowly move forward until entire train is moving. iii) Pickup & maintain the maximum speed. iv) If necessary use

Read More
AC Simulator – TRAIN HANDLING ON AN ASCENDING (UP) GRADE (अप असेंडिंग ग्रेडीयेट पर गाड़ी का संचालन )
January 6, 2021

TRAIN HANDLING ON AN ASCENDING (UP) GRADE    Starting procedure in ascending grade Assuming train brakes are applied    i) Move MP to take 3 or 4 notches (Keep watch on Ammeter)   ii) Release SA-9 (loco brake)    iii) Gradually release A9 (train brake)   iv) Wait for few seconds until the Ammeter reading stops increasing and

Read More
AC Simulator – TRAIN HANDLING ON A LEVEL SECTION (लेवल सेक्शन में गाड़ी का संचालन )
January 6, 2021

TRAIN HANDLING PROCEDURES IN DIFFERENT GRADIENTS    (Starting, Negotiating & Stopping of train)    TRAIN HANDLING ON A LEVEL SECTION    Starting of train from level section    i) Keep train brakes in released condition.  ii) Move MP to take 1 notch and simultaneously release SA-9.  iii) Wait for few seconds until the

Read More

Latest News

विभिन्न खंडों में नॉन इंटरलॉकिंग कार्य के कारण कुछ ट्रेनें प्रभावित