Multiple Unit Operation Multiple operation with two locomotives In multiple operations a maximum of two locomotives can be operated. Both must be directly coupled to one another. They must not be separated by a carriage. While in motion, the front driver’s cab is usually activated. When linking up or in unusual situations, it is also possible to control the locomotives from another driver’s cab. The train bus configuration for multiple operation is only possible from the driver’s cab at the uncoupled end. A configuration from a rear driver’s cab is referred to as single-unit traction. The train bus automatically checks the configuration : The leading manned locomotive
Read MoreReleasing Parking Brake 1.Press BPPB illuminated red button once red lamp will get extinguished and 6 kg/cm2 pressure enter in parking activators which can seen in PB gauge indicating that PB are released OR 2.Press “Release” push button on parking brake solenoid 30, BPPB red lamp will extinguished, air will be admitted in parking
Read MoreAnti Spin Brakes The principal of the anti-spin brake is to provide the traction equipment, with means to obtain a rapid yet light brake application to the driving wheels. The friction thus generated between the brake shoes and the tyres immediately absorbs the torque, which is in excess of the value that can be absorbed by the normal
Read MoreBrake System There are 5 types of brakes available on this loco. 1. Automatic Train Brake (Pn) 2. Direct Brake (Pn) 3. Parking Brake (Spring Loaded) 4. Anti Spin Brake.(Pn) 5-Regeneration Brakes.(Elect) Note: All the brake system functions are monitored by brake electronics and if there is any wrong configuration, the brake
Read MorePROGRAME SWITCHES 152 Rotary switch Failure mode operations Position 0- Normal Position - Fine control throughout the range 1- Failure mode - Fine control in steps through aux.contacts When throttle is not responding then Driver can keep this switch from 0 to 1 and now same throttle will respond, called failure mode
Read MorePASSING NEUTRAL SECTION ( SU ) Before approaching neutral section: 1-Ensure that MR pressure is between 8.5 to 10 kg/cm2 2-Bring TE / BE throttle to ‘0” gradually before 250M board. 3-At DJ open board, open DJ by BLDJ, LSDJ will glow, Aux. sound will stop, but U meter will show OHE supply. 4-At actual neutral section
Read MoreAutomatic Vigilance Control System VCD is meant for checking and keeping the driver alert. It is a safety device. A foot switch of VCD is provided below driver’s desk in each cab, also press button ‘BPVG’ is provided on drivers’ desk on Asst. side. Driver/Asst. driver is expected to activate VCD within every 60 seconds interval
Read MoreUnified Pension Scheme (UPS) Gazette Notification (Hindi)
राजभाषा पर विभागीय परीक्षा के लिए उपयोगी प्रश्नोतर
Railway Management Guide – प्रबन्धन
रेलगाड़ी टक्कर बचाव प्रणाली (Train Collision Avoidance System)
रेल यात्री को 20रू में मिलेगा भरपेट भोजन
Transfer on Spouse Ground at Same Station
विकलांग अभ्यर्थी के लिए पदोन्नति में आरक्षण के संबंध में स्पष्टीकरण (H/E)
रनिंग स्टाफ (Running Staff) सबंधित महत्वपूर्ण प्रश्न के उत्तर एवं स्पष्टीकरण
SYLLABUS OF DEPARTMENTAL EXAMINATION OF TNC
Railway Board Order Regarding Duty Hours of Running Staff
Q Paper & Answer AEN (Assistant Engineer) CBT Exam (Hindi/English) Dt 25.06.2023
Know About- चिकित्सा प्रतिपूर्ति दावा में लगने वाले प्रपत्रों की सूची
जानिए पटरियों के साइड में क्यों लिखे होते हैं नंबर?
KNOW ABOUT – SPL KINDS OF LEAVE – RAILWAY
सहायक लोको पायलट के कर्तव्य (Duties of Assistant Loco Pilot)
Consolidated Orders of MACP Scheme by By Personnel Branch BZA Division
Know About- चिकित्सा प्रतिपूर्ति दावा में लगने वाले प्रपत्रों की सूची
Unified Pension Scheme (UPS) Gazette Notification (Hindi)
प्वाइंटसमेन की ड्यूटी लिस्ट ( list of Pointsman Duty)
Clarification – “Regular Employees” for appearing GDCE—Minimum Service Conditions
Shri Dharam Veer Meena Takes Over as General Manager, Central Railway
गंभीर रोगियों को ट्रेन किराए में 75% तक का डिस्काउंट
Question Paper Ticket Examiner in Level-2 PR Quota 33 1/3% Commercial Department Dated 10.10.2021
GDCE QUESTION PAPER & ANSWER KEY TECH-III/TRD & TECH-III/ELECTRICAL Dated 31-05-2022
Frequently asked Question (FAQ) On Privilege ePass / PTO
Question Paper With Answer of Chief Loco Inspector in Level 7 (ER) dt 08-09-2019
Question Paper & Answer – Goods Guard Selection Exam dt. 28.08.2022
Q PAPER – SELECTION OF STAFF & WELFARE INSPECTOR – SWR – 2011
राजभाषा पर विभागीय परीक्षा के लिए उपयोगी प्रश्नोतर
Railway Management Guide – प्रबन्धन
APPLICATION FORM FOR (I) INTER RAILWAY (II) INTER DIVISIONAL/ DEPARTMENTAL TRANSFER (III) DEPUTATION
APPLICATION FORM FOR (I) INTER RAILWAY (II) INTER DIVISIONAL/ DEPARTMENTAL TRANSFER (III) DEPUTATION
AIM & OBJECTIVES OF INDIAN RAILWAYS
गुड/वैरी-गुड के चक्कर में फसेंगे कर्मी…. Chamchagiri Bahot Jaruri Hai
Post Retirement Complementary Passes For Railway Employees – Revised Entitlement
Clarification on Promotion Effecting Reservation (RBE 91/2018 dated 19.06.18)
Result of Train Manager (Goods Guard) Departmental Exam
Refund Rules of Unreserved & Reserved Tickets of Indian Railway
Good News – Modification of Recruitment Rule of Train Manager (Guard)
CBI BUSTS DEPARTMENTAL EXAMINATION PAPER LEAK UNDER EAST CENTRAL RAILWAY
Vacancy Notification – Filling up of Various Ex-cadre posts of IRIEEN, Nashik road
Regarding Minimum Service Conditions For GDCE (General Departmental Competitive Examination )
Regarding Committee to Examine issues relating to Supervisory Categories
Vacancies Notification of Station Masters in Level – 6
Materials Management on Indian Railways (English)
Trouble Shooting -SUB SYSTEM – 19 TRAIN BUS- ACT (RS) – ABB Loco (English) (Part – B)
रेलवे में पति-पत्नी एक जगह होंगे तैनात
General Manager presents Safety Award to 11 Staff of Central Railway
General Manager presents Safety Award to 11 Staff of Central Railway
General Manager presents Safety Award to 11 Staff of Central Railway
Final Seniority lists of Group ‘B’ officers of Civil Engineering Department Indian Railway
Are you sure you want to delete this element?
Close