KNORR’s Computer Controlled Brake System In some WAG-9 locos KNORR type brake system is provided which is different from conventional brake system of WAG-9 locos. In conventional loco, loco get failed in case of brake electronics failure. But in this loco, block section can be cleared by 10 KMPH in case of failure of brake electronics. CHANGES IN CAB 1) Pilot lamp panel One panel of 6 pilot lamps is provided beside panel-C which is as under: a)Exclusive Flow : This is a Red colored pilot lamp, glows when MR pressure is less. b) PCR open : This is a Red colored pilot lamp, glows when BP pressure is less. c) PER action: This is a Green colored pilot lamp, glows when
Read MoreActive functions with deactivated driver’s cab While the cab deactivated , the following functions remain operative. 1. MEMOTEL functions 2. Catenary voltage display 3. Emergency brake cock on assistant driver’s side 4. Cab and desk lighting 5. Windshield wipers 6. Fault display screen 7. Marker lights switches 8. Cab venting
Read MoreControl Electronics All functions of the locomotive are controlled by the control electronics. It takes the form of bus stations with processors. The bus stations communicate with each other via fiber optic Cables which are resistant to the effects of Electro Magnetic Interference The diagnostic equipment comprises a diagnosis computer with
Read MoreSanding Sanding is done automatically on leading wheels when 1. Pressing ‘foot switch’ of sander. 2. Anti spin device activated. Note :-Don’t press PSA continuously, but press and release it. Continuous sanding is not possible, If PSA pressed continuous for 1 minute, then dead mans penalty brakes will apply. 10-12 sec pause is
Read MoreMemotel (Speedometer) For indicating the speed of the loco, memotel type speedometer is provided in both the cab. Speed is indicated by both needle as well as LCD screen of SPM. For Data entry one push button “A” is provided on SPM When push button ‘A’ is pressed repeatedly following function done.(8 digits) in sequence. 1.
Read MoreMain Reservoir For shortage of compressed air pressure MR are provided on this loco. In WAP-7 & WAG-9 loco, Two MR and one AR is provided in machine Room in vertical manner. Capacity of MR is 450 liters. Drain coc is provided below each MR, which can be operated from machine room. In WAP-5 MR are located in under truck and each MR
Read MoreAn Emergency Braking Operation Emergency brakes will apply through brake electronics when: 1.Response from the Vigilance module 2.Permitted maximum speed being exceeded 3.Moving of the driver’s brake handle to position EMERGENCY 4.Actuation of the emergency brake cock on the assistant driver’s side 5.Actuation of the emergency
Read MoreUnified Pension Scheme (UPS) Gazette Notification (Hindi)
राजभाषा पर विभागीय परीक्षा के लिए उपयोगी प्रश्नोतर
Railway Management Guide – प्रबन्धन
रेलगाड़ी टक्कर बचाव प्रणाली (Train Collision Avoidance System)
रेल यात्री को 20रू में मिलेगा भरपेट भोजन
Transfer on Spouse Ground at Same Station
विकलांग अभ्यर्थी के लिए पदोन्नति में आरक्षण के संबंध में स्पष्टीकरण (H/E)
रनिंग स्टाफ (Running Staff) सबंधित महत्वपूर्ण प्रश्न के उत्तर एवं स्पष्टीकरण
SYLLABUS OF DEPARTMENTAL EXAMINATION OF TNC
Railway Board Order Regarding Duty Hours of Running Staff
Q Paper & Answer AEN (Assistant Engineer) CBT Exam (Hindi/English) Dt 25.06.2023
Know About- चिकित्सा प्रतिपूर्ति दावा में लगने वाले प्रपत्रों की सूची
जानिए पटरियों के साइड में क्यों लिखे होते हैं नंबर?
KNOW ABOUT – SPL KINDS OF LEAVE – RAILWAY
सहायक लोको पायलट के कर्तव्य (Duties of Assistant Loco Pilot)
Consolidated Orders of MACP Scheme by By Personnel Branch BZA Division
Know About- चिकित्सा प्रतिपूर्ति दावा में लगने वाले प्रपत्रों की सूची
Unified Pension Scheme (UPS) Gazette Notification (Hindi)
प्वाइंटसमेन की ड्यूटी लिस्ट ( list of Pointsman Duty)
Clarification – “Regular Employees” for appearing GDCE—Minimum Service Conditions
Shri Dharam Veer Meena Takes Over as General Manager, Central Railway
गंभीर रोगियों को ट्रेन किराए में 75% तक का डिस्काउंट
Question Paper Ticket Examiner in Level-2 PR Quota 33 1/3% Commercial Department Dated 10.10.2021
GDCE QUESTION PAPER & ANSWER KEY TECH-III/TRD & TECH-III/ELECTRICAL Dated 31-05-2022
Frequently asked Question (FAQ) On Privilege ePass / PTO
Question Paper With Answer of Chief Loco Inspector in Level 7 (ER) dt 08-09-2019
Question Paper & Answer – Goods Guard Selection Exam dt. 28.08.2022
Q PAPER – SELECTION OF STAFF & WELFARE INSPECTOR – SWR – 2011
राजभाषा पर विभागीय परीक्षा के लिए उपयोगी प्रश्नोतर
Railway Management Guide – प्रबन्धन
APPLICATION FORM FOR (I) INTER RAILWAY (II) INTER DIVISIONAL/ DEPARTMENTAL TRANSFER (III) DEPUTATION
APPLICATION FORM FOR (I) INTER RAILWAY (II) INTER DIVISIONAL/ DEPARTMENTAL TRANSFER (III) DEPUTATION
AIM & OBJECTIVES OF INDIAN RAILWAYS
गुड/वैरी-गुड के चक्कर में फसेंगे कर्मी…. Chamchagiri Bahot Jaruri Hai
Post Retirement Complementary Passes For Railway Employees – Revised Entitlement
Clarification on Promotion Effecting Reservation (RBE 91/2018 dated 19.06.18)
Result of Train Manager (Goods Guard) Departmental Exam
Refund Rules of Unreserved & Reserved Tickets of Indian Railway
Good News – Modification of Recruitment Rule of Train Manager (Guard)
CBI BUSTS DEPARTMENTAL EXAMINATION PAPER LEAK UNDER EAST CENTRAL RAILWAY
Vacancy Notification – Filling up of Various Ex-cadre posts of IRIEEN, Nashik road
Regarding Minimum Service Conditions For GDCE (General Departmental Competitive Examination )
Regarding Committee to Examine issues relating to Supervisory Categories
Vacancies Notification of Station Masters in Level – 6
Materials Management on Indian Railways (English)
Trouble Shooting -SUB SYSTEM – 19 TRAIN BUS- ACT (RS) – ABB Loco (English) (Part – B)
रेलवे में पति-पत्नी एक जगह होंगे तैनात
General Manager presents Safety Award to 11 Staff of Central Railway
General Manager presents Safety Award to 11 Staff of Central Railway
General Manager presents Safety Award to 11 Staff of Central Railway
Final Seniority lists of Group ‘B’ officers of Civil Engineering Department Indian Railway
Are you sure you want to delete this element?
Close