Breaking News
DEAD LOCO MOVEMENT (FOR DETAILS, REFER RAILWAY BOARD LETTER No. 2000 /M (L) /466/803/Pt. dated 28.06.2006) Hauling 3-Phase loco fitted with E-70 brake system as a dead loco. These locomotives are fitted with electro pneumatic E-70 brake system. These locomotives in dead condition can be hauled both by locomotive fitted with IRAB-1/28LAV-1 brake system and locomotive fitted with E-70 brake system. If these locos are coupled with conventional A.C. locos as a dead, then direct loco brake application is not possible by SA-9 since MRE & BCE can not be coupled but if BP is dropped from live loco, conjunction loco brakes application will take place in dead loco. A) Hauling
Read MoreKNORR’s Computer Controlled Brake System In some WAG-9 locos KNORR type brake system is provided which is different from conventional brake system of WAG-9 locos. In conventional loco, loco get failed in case of brake electronics failure. But in this loco, block section can be cleared by 10 KMPH in case of failure of brake
Read MoreMultiple Unit Operation Multiple operation with two locomotives In multiple operations a maximum of two locomotives can be operated. Both must be directly coupled to one another. They must not be separated by a carriage. While in motion, the front driver’s cab is usually activated. When linking up or in unusual situations, it is also
Read MoreLoco Preparation & Inspection: Before commissioning Journey, perform an inspection check of the locomotive and through the machine room. In particular, check the following items: 1. In front Of Cab: 1. Ensure that loco is standing on the rail and under the OHE 2. Ensure that both side MRE, BCE BP , FP hoses are connected properly
Read MorePROTECTION SCHEME Protective measures by control electronics: Initiation of protective measure in dangerous situation is controlled by Control Electronics. MCE monitors a range of values such as voltage, current, temperature, pressure and other signals. Catenary voltage out of range When catenary voltage drop down below 17.0 KV
Read MoreDO’s and Don’ts for Loco Pilots DO’s 1) Acknowledge VCD always within every 60 sec. 2) Do maximum use of regenerative braking, it not only control the train but participate in generating the power. 3) In case of any trouble, as a last step, switch off the CE for 5 min. 4) In panto down condition and in CE off condition, to
Read MoreFlasher light 1. Automatic flasher light system is provided 2. One additional flasher light unit is provided in cab at Asstt side, ensure that switch provided on it is at ON 3. To switch on the flasher rotate the switch provided on panel –C 4. Note that flasher glows only when CE is ON or in cooling mode. 5. If on line CE gets
Read MoreNew Revised Rates of Railway Quarters w.e.f. 1.7.2023
QUESTION PAPER & ANSWER KEY TECH-III/TRD & TECH-III/ELECTRICAL GDCE 31-05-2022
Result of Train Manager (Goods Guard) Departmental Exam
QUESTION BANK – SELECTION OF JE C & W (Carriage & Wagon) (Hindi & English)
रेलगाड़ी टक्कर बचाव प्रणाली (Train Collision Avoidance System)
During October 2023, RPF reunited over 601 children under Operation ‘Nanhe Faristey’
Regarding Admissibility of training allowance to teaching faculty
रनिंग स्टाफ (Running Staff) सबंधित महत्वपूर्ण प्रश्न के उत्तर एवं स्पष्टीकरण
Promotion Order – Sr. Train Manager (Guard) to Sr. Passenger Train Manage Dt 26.7.2023
Railway Board Order Regarding Duty Hours of Running Staff
Shri Ram Karan Yadav takes over as General Manager, Central Railway
Q Paper & Answer AEN (Assistant Engineer) CBT Exam (Hindi/English) Dt 25.06.2023
Duration of Periodical Medical Examination of Non Gazetted Rly Employee (Rule 514 of IRMM Vol – 1)
जानिए पटरियों के साइड में क्यों लिखे होते हैं नंबर?
KNOW ABOUT – SPL KINDS OF LEAVE – RAILWAY
सहायक लोको पायलट के कर्तव्य (Duties of Assistant Loco Pilot)
Consolidated Orders of MACP Scheme by By Personnel Branch BZA Division
Duties & Responsibilities of Nursing Sister, Staff Nurse & Midwife
NPS – Important initiatives for Central Government employee
प्वाइंटसमेन की ड्यूटी लिस्ट ( list of Pointsman Duty)
GDCE Exam Quota Recruitment Process & Syllabus (ALP & TECHNICIANS POSTS)
Result of Train Manager (Goods Guard) Departmental Exam
गंभीर रोगियों को ट्रेन किराए में 75% तक का डिस्काउंट
Question Paper Ticket Examiner in Level-2 PR Quota 33 1/3% Commercial Department Dated 10.10.2021
QUESTION PAPER & ANSWER KEY TECH-III/TRD & TECH-III/ELECTRICAL GDCE 31-05-2022
Frequently asked Question (FAQ) On Privilege ePass / PTO
Question Paper With Answer of Chief Loco Inspector in Level 7 (ER) dt 08-09-2019
Question Paper & Answer – Goods Guard Selection Exam dt. 28.08.2022
Q PAPER – SELECTION OF STAFF & WELFARE INSPECTOR – SWR – 2011
राजभाषा पर विभागीय परीक्षा के लिए उपयोगी प्रश्नोतर
APPLICATION FORM FOR (I) INTER RAILWAY (II) INTER DIVISIONAL/ DEPARTMENTAL TRANSFER (III) DEPUTATION
APPLICATION FORM FOR (I) INTER RAILWAY (II) INTER DIVISIONAL/ DEPARTMENTAL TRANSFER (III) DEPUTATION
गंभीर रोगियों को ट्रेन किराए में 75% तक का डिस्काउंट
गुड/वैरी-गुड के चक्कर में फसेंगे कर्मी…. Chamchagiri Bahot Jaruri Hai
Post Retirement Complementary Passes For Railway Employees – Revised Entitlement
Clarification on Promotion Effecting Reservation (RBE 91/2018 dated 19.06.18)
Result of Train Manager (Goods Guard) Departmental Exam
Refund Rules of Unreserved & Reserved Tickets of Indian Railway
Good News – Modification of Recruitment Rule of Train Manager (Guard)
रेलवे के साफ्टवेयर में सेंध कर फर्जीवाड़ा
Vacancy Notification – Filling up of Various Ex-cadre posts of IRIEEN, Nashik road
Regarding Minimum Service Conditions For GDCE (General Departmental Competitive Examination )
Syllabus – Section Controller (Traffic)
Materials Management on Indian Railways (English)
Trouble Shooting -SUB SYSTEM – 19 TRAIN BUS- ACT (RS) – ABB Loco (English) (Part – B)
रेलवे में पति-पत्नी एक जगह होंगे तैनात
Result of Train Manager (Goods Guard) Departmental Exam
जानिए पटरियों के साइड में क्यों लिखे होते हैं नंबर?
Are you sure you want to delete this element?
Close