DEAD LOCO MOVEMENT (FOR DETAILS, REFER RAILWAY BOARD LETTER No. 2000 /M (L) /466/803/Pt. dated 28.06.2006) Hauling 3-Phase loco fitted with E-70 brake system as a dead loco. These locomotives are fitted with electro pneumatic E-70 brake system. These locomotives in dead condition can be hauled both by locomotive fitted with IRAB-1/28LAV-1 brake system and locomotive fitted with E-70 brake system. If these locos are coupled with conventional A.C. locos as a dead, then direct loco brake application is not possible by SA-9 since MRE & BCE can not be coupled but if BP is dropped from live loco, conjunction loco brakes application will take place in dead loco. A) Hauling
Read MoreKNORR’s Computer Controlled Brake System In some WAG-9 locos KNORR type brake system is provided which is different from conventional brake system of WAG-9 locos. In conventional loco, loco get failed in case of brake electronics failure. But in this loco, block section can be cleared by 10 KMPH in case of failure of brake
Read MoreMultiple Unit Operation Multiple operation with two locomotives In multiple operations a maximum of two locomotives can be operated. Both must be directly coupled to one another. They must not be separated by a carriage. While in motion, the front driver’s cab is usually activated. When linking up or in unusual situations, it is also
Read MoreLoco Preparation & Inspection: Before commissioning Journey, perform an inspection check of the locomotive and through the machine room. In particular, check the following items: 1. In front Of Cab: 1. Ensure that loco is standing on the rail and under the OHE 2. Ensure that both side MRE, BCE BP , FP hoses are connected properly
Read MorePROTECTION SCHEME Protective measures by control electronics: Initiation of protective measure in dangerous situation is controlled by Control Electronics. MCE monitors a range of values such as voltage, current, temperature, pressure and other signals. Catenary voltage out of range When catenary voltage drop down below 17.0 KV
Read MoreDO’s and Don’ts for Loco Pilots DO’s 1) Acknowledge VCD always within every 60 sec. 2) Do maximum use of regenerative braking, it not only control the train but participate in generating the power. 3) In case of any trouble, as a last step, switch off the CE for 5 min. 4) In panto down condition and in CE off condition, to
Read MoreFlasher light 1. Automatic flasher light system is provided 2. One additional flasher light unit is provided in cab at Asstt side, ensure that switch provided on it is at ON 3. To switch on the flasher rotate the switch provided on panel –C 4. Note that flasher glows only when CE is ON or in cooling mode. 5. If on line CE gets
Read MoreUnified Pension Scheme (UPS) Gazette Notification (Hindi)
राजभाषा पर विभागीय परीक्षा के लिए उपयोगी प्रश्नोतर
Railway Management Guide – प्रबन्धन
रेलगाड़ी टक्कर बचाव प्रणाली (Train Collision Avoidance System)
रेल यात्री को 20रू में मिलेगा भरपेट भोजन
Transfer on Spouse Ground at Same Station
विकलांग अभ्यर्थी के लिए पदोन्नति में आरक्षण के संबंध में स्पष्टीकरण (H/E)
रनिंग स्टाफ (Running Staff) सबंधित महत्वपूर्ण प्रश्न के उत्तर एवं स्पष्टीकरण
SYLLABUS OF DEPARTMENTAL EXAMINATION OF TNC
Railway Board Order Regarding Duty Hours of Running Staff
Q Paper & Answer AEN (Assistant Engineer) CBT Exam (Hindi/English) Dt 25.06.2023
Know About- चिकित्सा प्रतिपूर्ति दावा में लगने वाले प्रपत्रों की सूची
जानिए पटरियों के साइड में क्यों लिखे होते हैं नंबर?
KNOW ABOUT – SPL KINDS OF LEAVE – RAILWAY
सहायक लोको पायलट के कर्तव्य (Duties of Assistant Loco Pilot)
Consolidated Orders of MACP Scheme by By Personnel Branch BZA Division
Know About- चिकित्सा प्रतिपूर्ति दावा में लगने वाले प्रपत्रों की सूची
Unified Pension Scheme (UPS) Gazette Notification (Hindi)
प्वाइंटसमेन की ड्यूटी लिस्ट ( list of Pointsman Duty)
Clarification – “Regular Employees” for appearing GDCE—Minimum Service Conditions
Shri Dharam Veer Meena Takes Over as General Manager, Central Railway
गंभीर रोगियों को ट्रेन किराए में 75% तक का डिस्काउंट
Question Paper Ticket Examiner in Level-2 PR Quota 33 1/3% Commercial Department Dated 10.10.2021
GDCE QUESTION PAPER & ANSWER KEY TECH-III/TRD & TECH-III/ELECTRICAL Dated 31-05-2022
Frequently asked Question (FAQ) On Privilege ePass / PTO
Question Paper With Answer of Chief Loco Inspector in Level 7 (ER) dt 08-09-2019
Question Paper & Answer – Goods Guard Selection Exam dt. 28.08.2022
Q PAPER – SELECTION OF STAFF & WELFARE INSPECTOR – SWR – 2011
राजभाषा पर विभागीय परीक्षा के लिए उपयोगी प्रश्नोतर
Railway Management Guide – प्रबन्धन
APPLICATION FORM FOR (I) INTER RAILWAY (II) INTER DIVISIONAL/ DEPARTMENTAL TRANSFER (III) DEPUTATION
APPLICATION FORM FOR (I) INTER RAILWAY (II) INTER DIVISIONAL/ DEPARTMENTAL TRANSFER (III) DEPUTATION
AIM & OBJECTIVES OF INDIAN RAILWAYS
गुड/वैरी-गुड के चक्कर में फसेंगे कर्मी…. Chamchagiri Bahot Jaruri Hai
Post Retirement Complementary Passes For Railway Employees – Revised Entitlement
Clarification on Promotion Effecting Reservation (RBE 91/2018 dated 19.06.18)
Result of Train Manager (Goods Guard) Departmental Exam
Refund Rules of Unreserved & Reserved Tickets of Indian Railway
Good News – Modification of Recruitment Rule of Train Manager (Guard)
CBI BUSTS DEPARTMENTAL EXAMINATION PAPER LEAK UNDER EAST CENTRAL RAILWAY
Vacancy Notification – Filling up of Various Ex-cadre posts of IRIEEN, Nashik road
Regarding Minimum Service Conditions For GDCE (General Departmental Competitive Examination )
Regarding Committee to Examine issues relating to Supervisory Categories
Vacancies Notification of Station Masters in Level – 6
Materials Management on Indian Railways (English)
Trouble Shooting -SUB SYSTEM – 19 TRAIN BUS- ACT (RS) – ABB Loco (English) (Part – B)
रेलवे में पति-पत्नी एक जगह होंगे तैनात
General Manager presents Safety Award to 11 Staff of Central Railway
General Manager presents Safety Award to 11 Staff of Central Railway
General Manager presents Safety Award to 11 Staff of Central Railway
Final Seniority lists of Group ‘B’ officers of Civil Engineering Department Indian Railway
Are you sure you want to delete this element?
Close