Terminology used in a Caution Order with their Meanings

06-03-2022

Terminology used in a Caution Order with their Meanings 1. O.E.S. - OBEY ENGINEERING SIGNAL 2. C.T.R. - COMPLETE TRACK RENEWAL 3. T.R.R. -  THROUGH RAIL RENEWAL 4. L.W.R. - LONG WELDED RAIL 5. C.W.R. - CONTINUOUS WELDED RAIL 6. T.S.R. - THROUGH SLIEEPER RENEWAL 7. S.W.R. - SHORT WELDED RAIL 8. U/S -  UNSERVISABLE SLEEPER 9. S.E.J. - SWITCH EXPANSION JOINT 10 U.C. -  UNCONSOLIDATED (LESS BALLAST) 11. S.D.I.R. -  STOP DEAD IF REQUIRED 12. P.B.R. - PULLING BACK OF RAILS 13. R.A.T. - RAILWAY AFFECTED TANK 14 T.F.R. - THROUGH FITTINGS RENEWAL 15. T.B.T.R. -  THROUGH BRIDGE TIMBER RENEWAL 16. T.R.R. - THROUGH WELD RENEWAL 17.

Read More
Train Protection Warning System (Hindi) – Loco Pilot General Information –
January 16, 2021

Read More
Signal Passed at Danger- SPAD(Hindi) – Loco Pilot General Information
January 16, 2021

Read More
प्रशिक्षण केंद्र पर सिमुलेटर के लिए अपनाई गई पध्दति
January 16, 2021

Read More
Train Driving Techniques – How to save energy ?
January 16, 2021

How to save energy  1. Before starting, train should be in fully released condition. 2. Coasting to be done where possible. 3. After braking, wait for releasing of the load, before notching up. 4. Before every braking costing to be done for some distance.  5. Loco Polots maximum use of costing boards. 6. When work empty load by

Read More
Loco Pilot General Information – Maintenance Schedule of Locomotive
January 16, 2021

Read More
Flow Cycle – Diesel Engine Lube Oil System
January 16, 2021

Read More

Latest News

Result of Train Manager (Goods Guard) Departmental Exam