General Manager presents Safety Award to 11 Staff of Central Railway
General Manager presents Safety Award to 11 Staff of Central Railway
General Manager presents Safety Award to 11 Staff of Central Railway
Final Seniority lists of Group ‘B’ officers of Civil Engineering Department Indian Railway
BRAKE POWER CERTFICATE:-
BPC is issued after intensive examination of train in empty condition.
· No sick wagon is allowed to run.
· Prepare in triplicate.
· Indicates brake power percentage of the train.
· BPC will be invalid if,
(a) The destination of the train is not mentioned on BPC.
(b) The train composition of train is changed by 10 four wheeler unit or more.
(c) The train is stable more than 24 hours at train examination points.
(d) The integrity is changed of CC rake more than four, 8 wheeled wagon.
AIR PRESSURE CONTINUITY TEST:-
OBJECTIVE:-
1-Continuity of brake pipe pressure from engine to brake van/ last vehicle.
2-On reduction of brake pipe pressure by driver, train brake must apply.
3-In emergency condition, if guard destroys BP pressure, then also train brake should be applied.
WHERE TO PERFORM:-
1- When an engine is attached ahead or behind the train engine.
2- When an engine is attached behind the last vehicle of the train.
3- When traction or engine is changed.
4- When shunting is performed in a train.
5- Whenever air pressure leakage/brake power work is attended on a train.
6- When a stable load has to be cleared from a road side station.
PROCEDURE:-
1. Charge the train with air pressure and ensure the requisite amount
In Engine In Brake Van
BP- 5.0 4.8 Kg/cm211- Maintenance is less.
FP- 6.0 5.8 Kg/cm2
2. Guard will destroy the BP pressure by 1 Kg/cm2 with the help emergency handle of brake van or angle cock of last vehicle.
3. Driver will ensure that BP pressure drops in engine also. He will observe Air flow indicator, light and buzzer.
4. Guard will place the emergency handle in normal position and will allow the BP pressure to charge again.
5. Driver and Guard will ensure that requisite amount of BP pressure is charged again in engine as well as in brake van.
6. Driver will destroy the BP pressure to zero with the help of driver’s brake valve.
7. Guard will ensure the Bp pressure in brake van /last vehicle has also dropped to zero.
8. To ensure brake application on train, Assistant Driver and Guard will check 3 or 4 wagons/ vehicles from their respective ends.
9. Driver will charge again Bp pressure by keeping the Driver’s brake valve in release position.
10. Driver and Guard will ensure that BP pressure both in engine and brake van / last vehicle is charged again to prescribed amount slowly and at Uniform rate.
|
This entry was posted in 7 Study Material & Guide, Carriage & Wagon
Unified Pension Scheme (UPS) Gazette Notification (Hindi)
राजभाषा पर विभागीय परीक्षा के लिए उपयोगी प्रश्नोतर
Railway Management Guide – प्रबन्धन
रेलगाड़ी टक्कर बचाव प्रणाली (Train Collision Avoidance System)
रेल यात्री को 20रू में मिलेगा भरपेट भोजन
Transfer on Spouse Ground at Same Station
विकलांग अभ्यर्थी के लिए पदोन्नति में आरक्षण के संबंध में स्पष्टीकरण (H/E)
रनिंग स्टाफ (Running Staff) सबंधित महत्वपूर्ण प्रश्न के उत्तर एवं स्पष्टीकरण
SYLLABUS OF DEPARTMENTAL EXAMINATION OF TNC
Railway Board Order Regarding Duty Hours of Running Staff
Q Paper & Answer AEN (Assistant Engineer) CBT Exam (Hindi/English) Dt 25.06.2023
Know About- चिकित्सा प्रतिपूर्ति दावा में लगने वाले प्रपत्रों की सूची
जानिए पटरियों के साइड में क्यों लिखे होते हैं नंबर?
KNOW ABOUT – SPL KINDS OF LEAVE – RAILWAY
सहायक लोको पायलट के कर्तव्य (Duties of Assistant Loco Pilot)
Consolidated Orders of MACP Scheme by By Personnel Branch BZA Division
Know About- चिकित्सा प्रतिपूर्ति दावा में लगने वाले प्रपत्रों की सूची
Unified Pension Scheme (UPS) Gazette Notification (Hindi)
प्वाइंटसमेन की ड्यूटी लिस्ट ( list of Pointsman Duty)
Clarification – “Regular Employees” for appearing GDCE—Minimum Service Conditions
Shri Dharam Veer Meena Takes Over as General Manager, Central Railway
गंभीर रोगियों को ट्रेन किराए में 75% तक का डिस्काउंट
Question Paper Ticket Examiner in Level-2 PR Quota 33 1/3% Commercial Department Dated 10.10.2021
GDCE QUESTION PAPER & ANSWER KEY TECH-III/TRD & TECH-III/ELECTRICAL Dated 31-05-2022
Frequently asked Question (FAQ) On Privilege ePass / PTO
Question Paper With Answer of Chief Loco Inspector in Level 7 (ER) dt 08-09-2019
Question Paper & Answer – Goods Guard Selection Exam dt. 28.08.2022
Q PAPER – SELECTION OF STAFF & WELFARE INSPECTOR – SWR – 2011
राजभाषा पर विभागीय परीक्षा के लिए उपयोगी प्रश्नोतर
Railway Management Guide – प्रबन्धन
APPLICATION FORM FOR (I) INTER RAILWAY (II) INTER DIVISIONAL/ DEPARTMENTAL TRANSFER (III) DEPUTATION
APPLICATION FORM FOR (I) INTER RAILWAY (II) INTER DIVISIONAL/ DEPARTMENTAL TRANSFER (III) DEPUTATION
AIM & OBJECTIVES OF INDIAN RAILWAYS
गुड/वैरी-गुड के चक्कर में फसेंगे कर्मी…. Chamchagiri Bahot Jaruri Hai
Post Retirement Complementary Passes For Railway Employees – Revised Entitlement
Clarification on Promotion Effecting Reservation (RBE 91/2018 dated 19.06.18)
Result of Train Manager (Goods Guard) Departmental Exam
Refund Rules of Unreserved & Reserved Tickets of Indian Railway
Good News – Modification of Recruitment Rule of Train Manager (Guard)
CBI BUSTS DEPARTMENTAL EXAMINATION PAPER LEAK UNDER EAST CENTRAL RAILWAY
Vacancy Notification – Filling up of Various Ex-cadre posts of IRIEEN, Nashik road
Regarding Minimum Service Conditions For GDCE (General Departmental Competitive Examination )
Regarding Committee to Examine issues relating to Supervisory Categories
Vacancies Notification of Station Masters in Level – 6
Materials Management on Indian Railways (English)
Trouble Shooting -SUB SYSTEM – 19 TRAIN BUS- ACT (RS) – ABB Loco (English) (Part – B)
रेलवे में पति-पत्नी एक जगह होंगे तैनात
Are you sure you want to delete this element?
Close