Many locos can be used as bankers on ghat sections. Usually, goods locos are used for banking duties, although this is not a rigid rule. The leading loco on a ghat section can in general be any loco provided it has suitable braking systems, etc.
There are some ghat special powers — locomotives that are specially modified for duties on steep gradients. These are usually equipped with an ‘Auto-Emergency’ (‘AE’ or ‘AEB’) brake system, which is an electronically controlled system which monitors the speed of the loco and applies the brakes automatically if it exceeds 25km/h (or other speed limit appropriate for the section).
These powers are especially used on steep gradients where catch sidings may not be provided (e.g., Braganza ghat Castle Rock – Kulem; in contrast, CR’s Lonavala-Karjat section and SER’s Krandol-Kacheli section have catch sidings and systems like AEB are not usually used). The AEB system is normally kept switched off in normal sections, and switched on only in the ghat section; the keys for these are kept with the station masters so that the drivers do not have the ability to override the system. Gooty is the only shed currently [6/03] where locos with AEB are regularly homed. (However, at least one loco in the 14xxx series homed at Krishnarajapuram has been spotted with stencilled indications that it had AEB ith a 30km/h restriction. [9/06]) In the past there were many WDM-2/2A/2B locos with AEB but now they have been phased out, and the locos with AEB now are WDM-3A and WDG-3A units.
A further safety feature in the Castle Rock – Kulem section is the running of trains in the so-called corridor system, where multiple goods trains are run in the same direction on the ghat section at times when passenger trains are not run, to maximize goods throughput while not endangering passenger trains in case of runaways.
There are many mandatory brake halts provided on steep sections. At these locations, the train must come to a complete halt before proceeding. Delayed signals are usually provided, which automatically clear after a track circuit with a timer detects that the train has stopped for the requisite amount of time. Usually, there are automatic points provided at these locations as well; if the train does not stop for the required duration the points will not be set for the main line and the train will be diverted to a catch siding or trap. Sometimes the brake halt is operated manually: a staff person is stationed at the halt and works the points and pulls of the signal only after the train has come to a halt, and the driver has signed in a register maintained for the purpose.
Source – IFRCA.org
Railway Employee (App) | Rail News Center ( App) | Railway Question Bank ( App) | (App) | Information Center ( App) |
This entry was posted in 2 Railway Employee, STUDY NEW, Railway Employee
New Revised Rates of Railway Quarters w.e.f. 1.7.2023
QUESTION PAPER & ANSWER KEY TECH-III/TRD & TECH-III/ELECTRICAL GDCE 31-05-2022
Result of Train Manager (Goods Guard) Departmental Exam
QUESTION BANK – SELECTION OF JE C & W (Carriage & Wagon) (Hindi & English)
रेलगाड़ी टक्कर बचाव प्रणाली (Train Collision Avoidance System)
During October 2023, RPF reunited over 601 children under Operation ‘Nanhe Faristey’
Regarding Admissibility of training allowance to teaching faculty
रनिंग स्टाफ (Running Staff) सबंधित महत्वपूर्ण प्रश्न के उत्तर एवं स्पष्टीकरण
Promotion Order – Sr. Train Manager (Guard) to Sr. Passenger Train Manage Dt 26.7.2023
Railway Board Order Regarding Duty Hours of Running Staff
Shri Ram Karan Yadav takes over as General Manager, Central Railway
Q Paper & Answer AEN (Assistant Engineer) CBT Exam (Hindi/English) Dt 25.06.2023
Duration of Periodical Medical Examination of Non Gazetted Rly Employee (Rule 514 of IRMM Vol – 1)
जानिए पटरियों के साइड में क्यों लिखे होते हैं नंबर?
KNOW ABOUT – SPL KINDS OF LEAVE – RAILWAY
सहायक लोको पायलट के कर्तव्य (Duties of Assistant Loco Pilot)
Consolidated Orders of MACP Scheme by By Personnel Branch BZA Division
Duties & Responsibilities of Nursing Sister, Staff Nurse & Midwife
NPS – Important initiatives for Central Government employee
प्वाइंटसमेन की ड्यूटी लिस्ट ( list of Pointsman Duty)
GDCE Exam Quota Recruitment Process & Syllabus (ALP & TECHNICIANS POSTS)
Result of Train Manager (Goods Guard) Departmental Exam
गंभीर रोगियों को ट्रेन किराए में 75% तक का डिस्काउंट
Question Paper Ticket Examiner in Level-2 PR Quota 33 1/3% Commercial Department Dated 10.10.2021
QUESTION PAPER & ANSWER KEY TECH-III/TRD & TECH-III/ELECTRICAL GDCE 31-05-2022
Frequently asked Question (FAQ) On Privilege ePass / PTO
Question Paper With Answer of Chief Loco Inspector in Level 7 (ER) dt 08-09-2019
Question Paper & Answer – Goods Guard Selection Exam dt. 28.08.2022
Q PAPER – SELECTION OF STAFF & WELFARE INSPECTOR – SWR – 2011
राजभाषा पर विभागीय परीक्षा के लिए उपयोगी प्रश्नोतर
APPLICATION FORM FOR (I) INTER RAILWAY (II) INTER DIVISIONAL/ DEPARTMENTAL TRANSFER (III) DEPUTATION
APPLICATION FORM FOR (I) INTER RAILWAY (II) INTER DIVISIONAL/ DEPARTMENTAL TRANSFER (III) DEPUTATION
गंभीर रोगियों को ट्रेन किराए में 75% तक का डिस्काउंट
गुड/वैरी-गुड के चक्कर में फसेंगे कर्मी…. Chamchagiri Bahot Jaruri Hai
Post Retirement Complementary Passes For Railway Employees – Revised Entitlement
Clarification on Promotion Effecting Reservation (RBE 91/2018 dated 19.06.18)
Result of Train Manager (Goods Guard) Departmental Exam
Refund Rules of Unreserved & Reserved Tickets of Indian Railway
Good News – Modification of Recruitment Rule of Train Manager (Guard)
रेलवे के साफ्टवेयर में सेंध कर फर्जीवाड़ा
Vacancy Notification – Filling up of Various Ex-cadre posts of IRIEEN, Nashik road
Regarding Minimum Service Conditions For GDCE (General Departmental Competitive Examination )
Syllabus – Section Controller (Traffic)
Materials Management on Indian Railways (English)
Trouble Shooting -SUB SYSTEM – 19 TRAIN BUS- ACT (RS) – ABB Loco (English) (Part – B)
रेलवे में पति-पत्नी एक जगह होंगे तैनात
Are you sure you want to delete this element?
Close