Latest News

Result of Train Manager (Goods Guard) Departmental Exam

Terminology used in a Caution Order with their Meanings

March 6, 2022, 2:45 PM
Share

Terminology used in a Caution Order with their Meanings

1. O.E.S. – OBEY ENGINEERING SIGNAL

2. C.T.R. – COMPLETE TRACK RENEWAL

3. T.R.R. –  THROUGH RAIL RENEWAL

4. L.W.R. – LONG WELDED RAIL

5. C.W.R. – CONTINUOUS WELDED RAIL

6. T.S.R. – THROUGH SLIEEPER RENEWAL

7. S.W.R. – SHORT WELDED RAIL

8. U/S –  UNSERVISABLE SLEEPER

9. S.E.J. – SWITCH EXPANSION JOINT

10 U.C. –  UNCONSOLIDATED (LESS BALLAST)

11. S.D.I.R. –  STOP DEAD IF REQUIRED

12. P.B.R. – PULLING BACK OF RAILS

13. R.A.T. – RAILWAY AFFECTED TANK

14 T.F.R. – THROUGH FITTINGS RENEWAL

15. T.B.T.R. –  THROUGH BRIDGE TIMBER RENEWAL

16. T.R.R. – THROUGH WELD RENEWAL

17. T.T.R. – TROUGH TURNOUT RENEWAL

18. T.B.R. – THROUGH BALLAST RENEWAL

19. B.C.M. –  BALLAST CLEANING MACHINE 20. D/S DEEP SCREENING

21. PQRS – PLASSER QUICK RELAYING SYSTEM

22. T.R.T. – TRAIL RELAYING TRAIN

23. R.O.B. – RAIL OVER BRIDGE

24. I.M.R. – IMMEDIATE REMOVAL RAIL (WITHIN 2 Or 3 DAY WHEEL BURNT RAILS)

Share

This entry was posted in 2 Railway Employee, Abbreviations, Engineering (P Way), Know About, Loco Pilot General Info, Operating Guide, Railway Employee Tags: