Breaking News
Result of Train Manager (Goods Guard) Departmental Exam
Shri Ram Karan Yadav takes over as General Manager, Central Railway
Result of Train Manager (Goods Guard) Departmental Exam
जानिए पटरियों के साइड में क्यों लिखे होते हैं नंबर?
Throttle and DMR circuit – This circuit starts from wire no. 50 which energizes when MB2 is kept ON. Supply of wire no. 50 goes to wire no.16D – 16A when MCB1 & 2 kept ON. Supply of wire no.16A goes to 16 through MH Idle & MH in Motoring position of both control stands. When wire no.16 gets energize, DMR coil gets +ve supply.
DMR coil gets -ve supply through NCI of PCS2, PCS1, PR3 and DMR will picks up. Due to which DMR self interlocks (16A-16F-16) gets closed. These interlock maintains +ve supply of DMR coil even after opening TH Notch. As we keep ECS on RUN ERR will get supply from wire no.16 through GFOLR NCI, ECS (RUN), GR1 NCI, Stop Button NCI, and LWS NCI and ERR picks up. Due to which NOI of ERR gets close on the branch of A, B, C, D solenoids.
Supply of wire no.16 goes to wire no.7A through 7B when MUSD1 and MUSD2 of respective control stand are in run position. On opening MH notch, its interlocks close on the branches of A, B, C, D solenoids. A, B, C, D solenoids coil get energize by wire no. 15A – 4, wire no. 12A – 4, wire no. 7C – 4, wire no. 3A – 4 respectively. As Solenoid picks up Engine speed increases as per throttle notches.
Engine speed control (GE/EH) – To increase the engine speed, balance current (475 mA) of speed coil is to be decreased and vice-versa to reduce speed according to the Notch position. ESR1, 2, 3, and 4 energizes or de energizes in combination according to the Notch position accordingly its NCI open or close in governor speed coil circuit.
Throttle and DMR circuit – This circuit starts from wire no. 50 which energizes when MB2 is kept ON. Supply of wire no. 50 goes to wire no.16D – 16A when MCB1 & 2 kept ON. Supply of wire no.16A goes to 16 through MH Idle & MH in Motoring position of both control stands. When wire no.16 gets energize, DMR coil gets +ve supply.
DMR coil gets -ve supply through NCI of PCS2, PCS1, PR3 and DMR will picks up. Due to which DMR self interlocks (16A-16F-16) gets closed. These interlock maintains +ve supply of DMR coil even after opening TH Notch. Supply of wire no.16 goes to wire no.7A through 7B when MUSD1 and MUSD2 of respective control stand are in run position. On opening MH notch, its interlocks close on the branches of ESR1, 2, 3, 4 coil get energize by wire no. 15 – 4, wire no. 12 – 4, wire no. 7 – 4, wire no. 16 – 4 respectively. As ESR picks up according to notch position then resistance of various values get connected in series of Governor Speed coil. Due to which current of speed coil will decrease and engine speed will increase. But when the speed coil get balance current 475 mA than engine speed will be maintained constant as per notch position. In vice-versa when notches reduced then current of speed coil will be increased due to which engine speed will decrease.
Precautions after wedging ERR:-
1. Keep attention on water level.
2. Bring MH to Idle when GR1/GFOLR operates.
3. Use MUSD for shut down the engine.
4. Engine not comes to Idle by ECS (I)
Note:
1. If MUSD wire is uncouple / loose engine speed will not increase upto 4th notch, on opening the 5th notch engine will shut down. At this time check its wire connection.
2. If MH interlock is defective, change the control stand and work further.
Railway Employee (App) | Rail News Center ( App) | Railway Question Bank ( App) | (App) | Information Center ( App) |
This entry was posted in 2 Railway Employee, 7 Study Material & Guide, Diesel Loco, Railway Employee
New Revised Rates of Railway Quarters w.e.f. 1.7.2023
QUESTION PAPER & ANSWER KEY TECH-III/TRD & TECH-III/ELECTRICAL GDCE 31-05-2022
Result of Train Manager (Goods Guard) Departmental Exam
QUESTION BANK – SELECTION OF JE C & W (Carriage & Wagon) (Hindi & English)
रेलगाड़ी टक्कर बचाव प्रणाली (Train Collision Avoidance System)
During October 2023, RPF reunited over 601 children under Operation ‘Nanhe Faristey’
Regarding Admissibility of training allowance to teaching faculty
रनिंग स्टाफ (Running Staff) सबंधित महत्वपूर्ण प्रश्न के उत्तर एवं स्पष्टीकरण
Promotion Order – Sr. Train Manager (Guard) to Sr. Passenger Train Manage Dt 26.7.2023
Railway Board Order Regarding Duty Hours of Running Staff
Shri Ram Karan Yadav takes over as General Manager, Central Railway
Q Paper & Answer AEN (Assistant Engineer) CBT Exam (Hindi/English) Dt 25.06.2023
Duration of Periodical Medical Examination of Non Gazetted Rly Employee (Rule 514 of IRMM Vol – 1)
जानिए पटरियों के साइड में क्यों लिखे होते हैं नंबर?
KNOW ABOUT – SPL KINDS OF LEAVE – RAILWAY
सहायक लोको पायलट के कर्तव्य (Duties of Assistant Loco Pilot)
Consolidated Orders of MACP Scheme by By Personnel Branch BZA Division
Duties & Responsibilities of Nursing Sister, Staff Nurse & Midwife
NPS – Important initiatives for Central Government employee
प्वाइंटसमेन की ड्यूटी लिस्ट ( list of Pointsman Duty)
GDCE Exam Quota Recruitment Process & Syllabus (ALP & TECHNICIANS POSTS)
Result of Train Manager (Goods Guard) Departmental Exam
गंभीर रोगियों को ट्रेन किराए में 75% तक का डिस्काउंट
Question Paper Ticket Examiner in Level-2 PR Quota 33 1/3% Commercial Department Dated 10.10.2021
QUESTION PAPER & ANSWER KEY TECH-III/TRD & TECH-III/ELECTRICAL GDCE 31-05-2022
Frequently asked Question (FAQ) On Privilege ePass / PTO
Question Paper With Answer of Chief Loco Inspector in Level 7 (ER) dt 08-09-2019
Question Paper & Answer – Goods Guard Selection Exam dt. 28.08.2022
Q PAPER – SELECTION OF STAFF & WELFARE INSPECTOR – SWR – 2011
राजभाषा पर विभागीय परीक्षा के लिए उपयोगी प्रश्नोतर
APPLICATION FORM FOR (I) INTER RAILWAY (II) INTER DIVISIONAL/ DEPARTMENTAL TRANSFER (III) DEPUTATION
APPLICATION FORM FOR (I) INTER RAILWAY (II) INTER DIVISIONAL/ DEPARTMENTAL TRANSFER (III) DEPUTATION
गंभीर रोगियों को ट्रेन किराए में 75% तक का डिस्काउंट
गुड/वैरी-गुड के चक्कर में फसेंगे कर्मी…. Chamchagiri Bahot Jaruri Hai
Post Retirement Complementary Passes For Railway Employees – Revised Entitlement
Clarification on Promotion Effecting Reservation (RBE 91/2018 dated 19.06.18)
Result of Train Manager (Goods Guard) Departmental Exam
Refund Rules of Unreserved & Reserved Tickets of Indian Railway
Good News – Modification of Recruitment Rule of Train Manager (Guard)
रेलवे के साफ्टवेयर में सेंध कर फर्जीवाड़ा
Vacancy Notification – Filling up of Various Ex-cadre posts of IRIEEN, Nashik road
Regarding Minimum Service Conditions For GDCE (General Departmental Competitive Examination )
Syllabus – Section Controller (Traffic)
Materials Management on Indian Railways (English)
Trouble Shooting -SUB SYSTEM – 19 TRAIN BUS- ACT (RS) – ABB Loco (English) (Part – B)
रेलवे में पति-पत्नी एक जगह होंगे तैनात
Are you sure you want to delete this element?
Close