Breaking News
Shri Ram Karan Yadav takes over as General Manager, Central Railway
Shri Ram Karan Yadav takes over as General Manager, Central Railway
रेलवे का राजस्थान को एक और वंदेभारत एक्सप्रेस ट्रेन का तोहफा, जयपुर से इस दिन से चलेगी ये ट्रेन
जानिए पटरियों के साइड में क्यों लिखे होते हैं नंबर?
1. Loco to be stop after clearing fouling mark.
2. Apply loco brake by SA-9.
3. Apply hand brake.
4. Apply wooden wedges/Iron skids.
5. Shut down the engine properly and put off all circuit breakers and switches.
6. Remove A9, SA9 handle in application position and RH in neutral position.
7. Entries to be made in repair book and trip card.
8. Handover repair book, trip card, A9, SA9 and Reverser handle to on duty authorized employee. Authorized employee is lobby, station, yard, shed supervisor.
Whenever loco is not able to move with its own power is called dead loco. To clear dead loco with working loco, attach it with working loco through CBC and following changes to be done on it
1. Drain out all reservoir pressure.
2. Keep MU2B on ‘DEAD’.
3. Close ¾” coc.
4. Remove A9, SA-9 handle in release position.
5. Remove RH in neutral position.
6. Close banking coc.
7. Put ‘OFF’ all circuit breakers and switches.
Couple BP, FP, BC & MR equalizing and vacuum hose pipes and open COC,angle COC between the working and dead loco . Ensure application and releasing of loco brake in both the loco.
If BC & MR equalizing pipe is not available then work the dead loco as a piped vehicle.
Procedure for Clearing Dead Loco in Rear of Train
(Letter no. 2000/M [L]/466/803/Pt. Dated 28/06/2006)
Whenever vacuum train pipe/ BP or its angle cock is broken in dead loco, if straight air brake dead loco is required to couple with vacuum brake train then it can not be worked as a piped vehicle. Such type of locos is required to couple in rear of train and fulfill following condition
1. Only one dead loco is to be coupled.
2. Sectional gradient should not be more than 1:100.
3. On dead loco minimum one ALP or a person above this grade is nominated who belongs to running cadre with walkie-talkie, hand flag, detonator. The nominated person should put on flasher light and apply hand brakes if dead loco is uncoupled.
Oil Checking Points in loco
1. Fuel oil tank capacity is 6000 litter and both side fuel oil glow rod is provided having marking from 600/1000 to 6000 liter. Average of both side glow rod oil level to be noted, minimum fuel oil level should not be less than 1000 liter.
2. Each axle having two suspension bearing, housing, each housing has oil cap and it is to be ensured that oil is available in the cap.
3. Each traction motor gear case having filling cap which should be tied with nut and bolt and no oil leakage.
4. Dipstick gauge is provided on engine right side in generator room to check the generator gear case oil level; it should be above minimum mark.
5. EH governor has two spy glasses, bottom one should be full and top one should be more than half. WW governor has glass tube to check oil level it should be above marking provided on the tube.
6. A dipstick gauge is provided to check oil level of engine lube oil sump. It has marking from 0 to 600 liter. To check oil level engine should be on idle and CCM is in running.
7. Spy glass and dipstick gauge are provided in compressor, dipstick having 5 marking oil should be above three marks. Engine should be shut down before checking the oil level while checking with dipstick gauge.
This entry was posted in Diesel Loco
New Revised Rates of Railway Quarters w.e.f. 1.7.2023
QUESTION PAPER & ANSWER KEY TECH-III/TRD & TECH-III/ELECTRICAL GDCE 31-05-2022
VACANCY NOTICE OF IRCON INTERNATIONAL LIMITED DATED 20.11.2023
QUESTION BANK – SELECTION OF JE C & W (Carriage & Wagon) (Hindi & English)
रेलगाड़ी टक्कर बचाव प्रणाली (Train Collision Avoidance System)
During October 2023, RPF reunited over 601 children under Operation ‘Nanhe Faristey’
Regarding Admissibility of training allowance to teaching faculty
रनिंग स्टाफ (Running Staff) सबंधित महत्वपूर्ण प्रश्न के उत्तर एवं स्पष्टीकरण
Promotion Order – Sr. Train Manager (Guard) to Sr. Passenger Train Manage Dt 26.7.2023
Railway Board Order Regarding Duty Hours of Running Staff
Shri Ram Karan Yadav takes over as General Manager, Central Railway
Q Paper & Answer AEN (Assistant Engineer) CBT Exam (Hindi/English) Dt 25.06.2023
Duration of Periodical Medical Examination of Non Gazetted Rly Employee (Rule 514 of IRMM Vol – 1)
जानिए पटरियों के साइड में क्यों लिखे होते हैं नंबर?
KNOW ABOUT – SPL KINDS OF LEAVE – RAILWAY
सहायक लोको पायलट के कर्तव्य (Duties of Assistant Loco Pilot)
Consolidated Orders of MACP Scheme by By Personnel Branch BZA Division
Duties & Responsibilities of Nursing Sister, Staff Nurse & Midwife
NPS – Important initiatives for Central Government employee
प्वाइंटसमेन की ड्यूटी लिस्ट ( list of Pointsman Duty)
GDCE Exam Quota Recruitment Process & Syllabus (ALP & TECHNICIANS POSTS)
गंभीर रोगियों को ट्रेन किराए में 75% तक का डिस्काउंट
Question Paper Ticket Examiner in Level-2 PR Quota 33 1/3% Commercial Department Dated 10.10.2021
QUESTION PAPER & ANSWER KEY TECH-III/TRD & TECH-III/ELECTRICAL GDCE 31-05-2022
Frequently asked Question (FAQ) On Privilege ePass / PTO
Question Paper With Answer of Chief Loco Inspector in Level 7 (ER) dt 08-09-2019
Question Paper & Answer – Goods Guard Selection Exam dt. 28.08.2022
Q PAPER – SELECTION OF STAFF & WELFARE INSPECTOR – SWR – 2011
राजभाषा पर विभागीय परीक्षा के लिए उपयोगी प्रश्नोतर
APPLICATION FORM FOR (I) INTER RAILWAY (II) INTER DIVISIONAL/ DEPARTMENTAL TRANSFER (III) DEPUTATION
APPLICATION FORM FOR (I) INTER RAILWAY (II) INTER DIVISIONAL/ DEPARTMENTAL TRANSFER (III) DEPUTATION
गंभीर रोगियों को ट्रेन किराए में 75% तक का डिस्काउंट
गुड/वैरी-गुड के चक्कर में फसेंगे कर्मी…. Chamchagiri Bahot Jaruri Hai
Post Retirement Complementary Passes For Railway Employees – Revised Entitlement
Clarification on Promotion Effecting Reservation (RBE 91/2018 dated 19.06.18)
Refund Rules of Unreserved & Reserved Tickets of Indian Railway
Good News – Modification of Recruitment Rule of Train Manager (Guard)
रेलवे के साफ्टवेयर में सेंध कर फर्जीवाड़ा
Vacancy Notification – Filling up of Various Ex-cadre posts of IRIEEN, Nashik road
Regarding Minimum Service Conditions For GDCE (General Departmental Competitive Examination )
Syllabus – Section Controller (Traffic)
Materials Management on Indian Railways (English)
Trouble Shooting -SUB SYSTEM – 19 TRAIN BUS- ACT (RS) – ABB Loco (English) (Part – B)
रेलवे में पति-पत्नी एक जगह होंगे तैनात
Are you sure you want to delete this element?
Close