Breaking News
Result of Train Manager (Goods Guard) Departmental Exam
Shri Ram Karan Yadav takes over as General Manager, Central Railway
Result of Train Manager (Goods Guard) Departmental Exam
जानिए पटरियों के साइड में क्यों लिखे होते हैं नंबर?
For the first time in India, the University of Birmingham will design a “digital twin” of Indian Railway corridor to help the national transporter with the trial of the 4G-based ultra-modern signalling system European Train Control System (ETCS) Level-2 on four routes.
The Indian Railways entered into an agreement with the University of Birmingham, which offers postgraduate courses in Railway Safety and Control Systems, last month for this advanced technological aid.
As per the agreement, the University’s Centre for Railway Research and Education will develop the “digital twin” model to clone the realtime train movement data of four corridors – Nagpur-Bandra (175 km), Jhansi-Bina (155 km) Yerraguntalla-Renigunta (165 km) and Vizianagram-Palasa (145 km) – where the trial of the ETCS Level-2 shall take place. The project will cost approximately Rs 1,700 crore, and global industry majors are in the fray for the same.
Indian Railway corridors are equipped with the old signalling system, hence the “digital twin” will show how these corridors will behave once the sophisticated ETCS Level-2 system is installed, thereby eliminating the chances of error during the trials.
The software module will also show Indian Railways, through the digital twin, how much benefits are available once the ETCS Level-2 is superimposed into the corridors – capacity enhancement, increased safety of operations and possibly an increase in speed as well, policymakers said. The tender of the trial of the system on four routes will be awarded soon.
Since Indian Railways does not have the in-house capability to design such a complex software module, the “digital twin” will help the national transporter in its signalling upgrade in the future.
The ETCS Level 2 is a complex system of electronic devices installed along tracks to convey train signals to a computer fitted in the locomotive, doing away with the need for track-side signal indicators. The main feature of this system is that the devices fitted in the tracks get synced continuously to reflect the current signals on the route, and to update that information in a running locomotive via wireless frequency.
It negates the possibility of collision, as trains are electronically prevented from jumping signals and, even if they do, the locomotive comes to a halt automatically.
Globally, including in Europe, the wireless technology was originally based on the 3G-Global System for Mobile Communications (GSM), while India is looking at a futuristic 4G Long-term Evolution (LTE)-based system.
The government this year approved the ETCS Level-2 system to be installed in the routes along Golden Quadrilateral and its diagonals for an estimated cost of around Rs 30,000 crore, sources said. The national transporter has also decided to equip its Delhi-Mumbai and Delhi-Howrah semi-high speed corridors with this system when the upgrade project happens.
Earlier, the Railways had planned to convert its entire broad gauge network, running on the automatic signalling system to the ETCS Level-2 system at one go – a project that would cost an estimated Rs 78,000 crore. While that plan did not take off, the subsequent idea was to have a trial of the system and learn from the experience on four corridors.
Source – Indian Express
This entry was posted in 1 Rail News, General
New Revised Rates of Railway Quarters w.e.f. 1.7.2023
QUESTION PAPER & ANSWER KEY TECH-III/TRD & TECH-III/ELECTRICAL GDCE 31-05-2022
Result of Train Manager (Goods Guard) Departmental Exam
QUESTION BANK – SELECTION OF JE C & W (Carriage & Wagon) (Hindi & English)
रेलगाड़ी टक्कर बचाव प्रणाली (Train Collision Avoidance System)
During October 2023, RPF reunited over 601 children under Operation ‘Nanhe Faristey’
Regarding Admissibility of training allowance to teaching faculty
रनिंग स्टाफ (Running Staff) सबंधित महत्वपूर्ण प्रश्न के उत्तर एवं स्पष्टीकरण
Promotion Order – Sr. Train Manager (Guard) to Sr. Passenger Train Manage Dt 26.7.2023
Railway Board Order Regarding Duty Hours of Running Staff
Shri Ram Karan Yadav takes over as General Manager, Central Railway
Q Paper & Answer AEN (Assistant Engineer) CBT Exam (Hindi/English) Dt 25.06.2023
Duration of Periodical Medical Examination of Non Gazetted Rly Employee (Rule 514 of IRMM Vol – 1)
जानिए पटरियों के साइड में क्यों लिखे होते हैं नंबर?
KNOW ABOUT – SPL KINDS OF LEAVE – RAILWAY
सहायक लोको पायलट के कर्तव्य (Duties of Assistant Loco Pilot)
Consolidated Orders of MACP Scheme by By Personnel Branch BZA Division
Duties & Responsibilities of Nursing Sister, Staff Nurse & Midwife
NPS – Important initiatives for Central Government employee
प्वाइंटसमेन की ड्यूटी लिस्ट ( list of Pointsman Duty)
GDCE Exam Quota Recruitment Process & Syllabus (ALP & TECHNICIANS POSTS)
Result of Train Manager (Goods Guard) Departmental Exam
गंभीर रोगियों को ट्रेन किराए में 75% तक का डिस्काउंट
Question Paper Ticket Examiner in Level-2 PR Quota 33 1/3% Commercial Department Dated 10.10.2021
QUESTION PAPER & ANSWER KEY TECH-III/TRD & TECH-III/ELECTRICAL GDCE 31-05-2022
Frequently asked Question (FAQ) On Privilege ePass / PTO
Question Paper With Answer of Chief Loco Inspector in Level 7 (ER) dt 08-09-2019
Question Paper & Answer – Goods Guard Selection Exam dt. 28.08.2022
Q PAPER – SELECTION OF STAFF & WELFARE INSPECTOR – SWR – 2011
राजभाषा पर विभागीय परीक्षा के लिए उपयोगी प्रश्नोतर
APPLICATION FORM FOR (I) INTER RAILWAY (II) INTER DIVISIONAL/ DEPARTMENTAL TRANSFER (III) DEPUTATION
APPLICATION FORM FOR (I) INTER RAILWAY (II) INTER DIVISIONAL/ DEPARTMENTAL TRANSFER (III) DEPUTATION
गंभीर रोगियों को ट्रेन किराए में 75% तक का डिस्काउंट
गुड/वैरी-गुड के चक्कर में फसेंगे कर्मी…. Chamchagiri Bahot Jaruri Hai
Post Retirement Complementary Passes For Railway Employees – Revised Entitlement
Clarification on Promotion Effecting Reservation (RBE 91/2018 dated 19.06.18)
Result of Train Manager (Goods Guard) Departmental Exam
Refund Rules of Unreserved & Reserved Tickets of Indian Railway
Good News – Modification of Recruitment Rule of Train Manager (Guard)
रेलवे के साफ्टवेयर में सेंध कर फर्जीवाड़ा
Vacancy Notification – Filling up of Various Ex-cadre posts of IRIEEN, Nashik road
Regarding Minimum Service Conditions For GDCE (General Departmental Competitive Examination )
Syllabus – Section Controller (Traffic)
Materials Management on Indian Railways (English)
Trouble Shooting -SUB SYSTEM – 19 TRAIN BUS- ACT (RS) – ABB Loco (English) (Part – B)
रेलवे में पति-पत्नी एक जगह होंगे तैनात
Are you sure you want to delete this element?
Close