Breaking News
Shri Ram Karan Yadav takes over as General Manager, Central Railway
Shri Ram Karan Yadav takes over as General Manager, Central Railway
रेलवे का राजस्थान को एक और वंदेभारत एक्सप्रेस ट्रेन का तोहफा, जयपुर से इस दिन से चलेगी ये ट्रेन
जानिए पटरियों के साइड में क्यों लिखे होते हैं नंबर?
Crew links are drawn up for the scheduled trains passing through a division, in consultation with neighbouring divisions. A crew link must satisfy several conditions on working hours, rest hours, etc., for the loco crew. The average working hours for a crew member in a fortnight should not exceed 104 hours (but should be as close to 104 as possible). Actual continuous running hours on a train on a single cycle of duty should not exceed 10 hours at a time (this used to be higher at 12 hours, but was reduced to 10 hours in 1973). In exceptional circumstances crews may work more than 10 hours at a time, but the running time should not exceed 12 hours under any cases, and crew are entitled to rest as soon as 12 hours are up regardless of where they happen to be located. No more than 6 consecutive runs should include night-time duty. Average headquarters (or home station) rest and out-station rest should be 18 and 8 hours respectively. Home station rest may in some cases be reduced but should not be less than 12 hours, except for emergency situations where it may be reduced to 8 hours. Periodic rest each month must include four 30-hour rest periods, or five 22-hour rest periods (each including one night in bed). These periodic rests are generally staggered uniformly through the month, and successive rest periods should be within 10 days of one another.
Running crew (drivers, firemen or assistant drivers, guards) sign on for the run of a train – guards 45 minutes before departure, loco crew 1 hour from the locomotive’s departure from the shed. Sign off is normally at the same time as when the train arrives at the yard (for the guard) or the loco is returned to the shed (for the loco crew). The sign on and sign off times are used for reckoning continuous running times.
Except for some ‘prestigious’ trains (Rajdhanis, etc.) and crack goods trains and other high-priority trains which may have dedicated crew, normally crew are booked for trains on a first-in, first-out basis depending on which crew have road knowledge of the routes for trains that need to be staffed.
Source – IFRCA.org
Railway Employee (App) | Rail News Center ( App) | Railway Question Bank ( App) | (App) | Information Center ( App) |
This entry was posted in 2 Railway Employee, STUDY NEW, Railway Employee
New Revised Rates of Railway Quarters w.e.f. 1.7.2023
QUESTION PAPER & ANSWER KEY TECH-III/TRD & TECH-III/ELECTRICAL GDCE 31-05-2022
VACANCY NOTICE OF IRCON INTERNATIONAL LIMITED DATED 20.11.2023
QUESTION BANK – SELECTION OF JE C & W (Carriage & Wagon) (Hindi & English)
रेलगाड़ी टक्कर बचाव प्रणाली (Train Collision Avoidance System)
During October 2023, RPF reunited over 601 children under Operation ‘Nanhe Faristey’
Regarding Admissibility of training allowance to teaching faculty
रनिंग स्टाफ (Running Staff) सबंधित महत्वपूर्ण प्रश्न के उत्तर एवं स्पष्टीकरण
Promotion Order – Sr. Train Manager (Guard) to Sr. Passenger Train Manage Dt 26.7.2023
Railway Board Order Regarding Duty Hours of Running Staff
Shri Ram Karan Yadav takes over as General Manager, Central Railway
Q Paper & Answer AEN (Assistant Engineer) CBT Exam (Hindi/English) Dt 25.06.2023
Duration of Periodical Medical Examination of Non Gazetted Rly Employee (Rule 514 of IRMM Vol – 1)
जानिए पटरियों के साइड में क्यों लिखे होते हैं नंबर?
KNOW ABOUT – SPL KINDS OF LEAVE – RAILWAY
सहायक लोको पायलट के कर्तव्य (Duties of Assistant Loco Pilot)
Consolidated Orders of MACP Scheme by By Personnel Branch BZA Division
Duties & Responsibilities of Nursing Sister, Staff Nurse & Midwife
NPS – Important initiatives for Central Government employee
प्वाइंटसमेन की ड्यूटी लिस्ट ( list of Pointsman Duty)
GDCE Exam Quota Recruitment Process & Syllabus (ALP & TECHNICIANS POSTS)
गंभीर रोगियों को ट्रेन किराए में 75% तक का डिस्काउंट
Question Paper Ticket Examiner in Level-2 PR Quota 33 1/3% Commercial Department Dated 10.10.2021
QUESTION PAPER & ANSWER KEY TECH-III/TRD & TECH-III/ELECTRICAL GDCE 31-05-2022
Frequently asked Question (FAQ) On Privilege ePass / PTO
Question Paper With Answer of Chief Loco Inspector in Level 7 (ER) dt 08-09-2019
Question Paper & Answer – Goods Guard Selection Exam dt. 28.08.2022
Q PAPER – SELECTION OF STAFF & WELFARE INSPECTOR – SWR – 2011
राजभाषा पर विभागीय परीक्षा के लिए उपयोगी प्रश्नोतर
APPLICATION FORM FOR (I) INTER RAILWAY (II) INTER DIVISIONAL/ DEPARTMENTAL TRANSFER (III) DEPUTATION
APPLICATION FORM FOR (I) INTER RAILWAY (II) INTER DIVISIONAL/ DEPARTMENTAL TRANSFER (III) DEPUTATION
गंभीर रोगियों को ट्रेन किराए में 75% तक का डिस्काउंट
गुड/वैरी-गुड के चक्कर में फसेंगे कर्मी…. Chamchagiri Bahot Jaruri Hai
Post Retirement Complementary Passes For Railway Employees – Revised Entitlement
Clarification on Promotion Effecting Reservation (RBE 91/2018 dated 19.06.18)
Refund Rules of Unreserved & Reserved Tickets of Indian Railway
Good News – Modification of Recruitment Rule of Train Manager (Guard)
रेलवे के साफ्टवेयर में सेंध कर फर्जीवाड़ा
Vacancy Notification – Filling up of Various Ex-cadre posts of IRIEEN, Nashik road
Regarding Minimum Service Conditions For GDCE (General Departmental Competitive Examination )
Syllabus – Section Controller (Traffic)
Materials Management on Indian Railways (English)
Trouble Shooting -SUB SYSTEM – 19 TRAIN BUS- ACT (RS) – ABB Loco (English) (Part – B)
रेलवे में पति-पत्नी एक जगह होंगे तैनात
Are you sure you want to delete this element?
Close