Breaking News
General Manager’s Safety Award for 10 Staff of Central Railway
क्षेत्रीय हिंदी प्रतियोगिता 2023 संपन्न
General Manager’s Safety Award for 10 Staff of Central Railway
जानिए पटरियों के साइड में क्यों लिखे होते हैं नंबर?
The customary answer to this question is 3:35pm on April 16th, 1853, when a train with 14 railway carriages and 400 guests left Bombay‘s Bori Bunder for Thane, with a 21-gun salute. It was hauled by three locomotives: Sindh, Sultan, and Sahib. The journey took an hour and fifteen minutes.
That, however, was just the first commercial passenger service in India. In fact, a few other railways are known to have operated in India prior to 1853, for hauling materials.
In 1835, a short experimental line was laid near Chintadripet. This appears to have been a practice run of sorts for the Red Hill Railroad line. Construction on this line began in 1836. This line was intended for the carriage of granite stone. It was opened in 1837, and while it had teething troubles, it appears that it was definitely in operation in 1837, with a written report of its running from January 1838. While primarily intended for rail wagons hauled by animals, locomotives were also used on the line. One of them may even have been built in India. More here.
In 1845, a railway was built for carriage of stone and construction materials for irrigation works and a dam over the Godavari near Rajahmundry. More here.
ये भी पढ़े – क्या किशमिश को पानी में भिगोकर खाना ज्यादा फायदेमंद होता है?
Perhaps best known of these early pre-1853 railways is the account of a steam locomotive, Thomason, which had been used for hauling construction material in Roorkee for the Solani viaduct in 1851 (it is said to have begun working there on 22nd December 1851). The Solani viaduct construction was a part of the Ganges Canal project, started in 1845. The viaduct had 15 arches and spanned the 4km-wide Solani valley (about 145km north-east of New Delhi). Earth for the approach embankments was transported along light rail lines about 5 to 10 km long from Piran Kaliyar to Roorkee. Standard gauge wagons were used, built from parts brought over from England, and hauled by men and later horses. In late 1851, the locomotive Thomason (named for the engineer on the project) was assembled on the spot from parts transported from Calcutta. It hauled two wagons at a time, at a speed of about 6km/h. It did not last very long, and after about 9 months India’s first steam locomotive died a spectacular death with a boiler explosion, reportedly to the delight of the construction workers who had viewed it more as a hindrance than help. Hughes’ book states that this was a six-wheeled tank engine, probably a 2-2-2WT built by E. B. Wilson, and of standard gauge. Some details of the wagons and the use of the locomotive are in Sir Proby T Cautley’s Report on the Ganges Canal Works (3 volumes, 1860).
It is entirely possible that there were other such railways used for the conveyance of materials and construction supplies in India around this time.
Moving past these construction railways, the next locomotive to arrive in India was the Falkland (named for a governor of Bombay), used by the contractors of the GIPR for shunting operations on the first line out of Bombay that was being built. It began work on February 23, 1852. Hughes’ book suggests that this was also built by E. B. Wilson, and was probably a four-wheeled tank engine (0-4-0T?) with dummy crankshaft. It later became GIPR loco #9. A third locomotive, Vulcan, is said to have been used by the GIPR for material hauling and shunting duties in 1852 as well.
There were also eight more locos from Vulcan Foundry imported by GIPR in 1852 and 1853.
On November 18, 1852, a locomotive hauled some coaches on a trial run from Bori Bunder to Thana. This probably counts as the first “real” train to run in India.
Source – IFRCA.org
Railway Employee (App) | Rail News Center ( App) | Railway Question Bank ( App) | (App) | Information Center ( App) |
This entry was posted in 2 Railway Employee, STUDY NEW, Railway Employee
New Revised Rates of Railway Quarters w.e.f. 1.7.2023
QUESTION PAPER & ANSWER KEY TECH-III/TRD & TECH-III/ELECTRICAL GDCE 31-05-2022
Result of Train Manager (Goods Guard) Departmental Exam
QUESTION BANK – SELECTION OF JE C & W (Carriage & Wagon) (Hindi & English)
रेलगाड़ी टक्कर बचाव प्रणाली (Train Collision Avoidance System)
During October 2023, RPF reunited over 601 children under Operation ‘Nanhe Faristey’
Regarding Admissibility of training allowance to teaching faculty
रनिंग स्टाफ (Running Staff) सबंधित महत्वपूर्ण प्रश्न के उत्तर एवं स्पष्टीकरण
Promotion Order – Sr. Train Manager (Guard) to Sr. Passenger Train Manage Dt 26.7.2023
Railway Board Order Regarding Duty Hours of Running Staff
Shri Ram Karan Yadav takes over as General Manager, Central Railway
Q Paper & Answer AEN (Assistant Engineer) CBT Exam (Hindi/English) Dt 25.06.2023
Duration of Periodical Medical Examination of Non Gazetted Rly Employee (Rule 514 of IRMM Vol – 1)
जानिए पटरियों के साइड में क्यों लिखे होते हैं नंबर?
KNOW ABOUT – SPL KINDS OF LEAVE – RAILWAY
सहायक लोको पायलट के कर्तव्य (Duties of Assistant Loco Pilot)
Consolidated Orders of MACP Scheme by By Personnel Branch BZA Division
Duties & Responsibilities of Nursing Sister, Staff Nurse & Midwife
NPS – Important initiatives for Central Government employee
प्वाइंटसमेन की ड्यूटी लिस्ट ( list of Pointsman Duty)
GDCE Exam Quota Recruitment Process & Syllabus (ALP & TECHNICIANS POSTS)
Result of Train Manager (Goods Guard) Departmental Exam
गंभीर रोगियों को ट्रेन किराए में 75% तक का डिस्काउंट
Question Paper Ticket Examiner in Level-2 PR Quota 33 1/3% Commercial Department Dated 10.10.2021
QUESTION PAPER & ANSWER KEY TECH-III/TRD & TECH-III/ELECTRICAL GDCE 31-05-2022
Frequently asked Question (FAQ) On Privilege ePass / PTO
Question Paper With Answer of Chief Loco Inspector in Level 7 (ER) dt 08-09-2019
Question Paper & Answer – Goods Guard Selection Exam dt. 28.08.2022
Q PAPER – SELECTION OF STAFF & WELFARE INSPECTOR – SWR – 2011
राजभाषा पर विभागीय परीक्षा के लिए उपयोगी प्रश्नोतर
APPLICATION FORM FOR (I) INTER RAILWAY (II) INTER DIVISIONAL/ DEPARTMENTAL TRANSFER (III) DEPUTATION
APPLICATION FORM FOR (I) INTER RAILWAY (II) INTER DIVISIONAL/ DEPARTMENTAL TRANSFER (III) DEPUTATION
गंभीर रोगियों को ट्रेन किराए में 75% तक का डिस्काउंट
गुड/वैरी-गुड के चक्कर में फसेंगे कर्मी…. Chamchagiri Bahot Jaruri Hai
Post Retirement Complementary Passes For Railway Employees – Revised Entitlement
Clarification on Promotion Effecting Reservation (RBE 91/2018 dated 19.06.18)
Result of Train Manager (Goods Guard) Departmental Exam
Refund Rules of Unreserved & Reserved Tickets of Indian Railway
Good News – Modification of Recruitment Rule of Train Manager (Guard)
रेलवे के साफ्टवेयर में सेंध कर फर्जीवाड़ा
Vacancy Notification – Filling up of Various Ex-cadre posts of IRIEEN, Nashik road
Regarding Minimum Service Conditions For GDCE (General Departmental Competitive Examination )
Syllabus – Section Controller (Traffic)
Materials Management on Indian Railways (English)
Trouble Shooting -SUB SYSTEM – 19 TRAIN BUS- ACT (RS) – ABB Loco (English) (Part – B)
रेलवे में पति-पत्नी एक जगह होंगे तैनात
Are you sure you want to delete this element?
Close