Breaking News
Shri Ram Karan Yadav takes over as General Manager, Central Railway
Shri Ram Karan Yadav takes over as General Manager, Central Railway
रेलवे का राजस्थान को एक और वंदेभारत एक्सप्रेस ट्रेन का तोहफा, जयपुर से इस दिन से चलेगी ये ट्रेन
जानिए पटरियों के साइड में क्यों लिखे होते हैं नंबर?
Signal installations are designed as far as possible for fail-safe operation, which means that any failure should leave the system in a state where dangerous train movements are not allowed. For instance, in case of a failure detected at a panel interlocking installation, all signals controlled by it are designed to revert to On. Similarly, a failure detected in the block control circuit at the Starter signal causes all signals to the rear guarding the approach to the block section switch to On, and notification is sent automatically to the control centre or signal cabin.
The signals themselves have two-filament bulbs, or two-bulb assemblies for each lamp, to provide redundancy in case of a filament burning out. Where incandescent bulbs are used, the filaments are kept warm even when the lamp is off, through the passage of a small current which prevents thermal shocks on switching on the lamp and thereby reduces the chances of failure. The signals are also frequently examined and bulbs replaced in a pre-emptive manner.
There is also a trend towards using LED panels instead of incandescent bulbs for the greater safety they afford (since several LEDs on a panel can fail without compromising the safety of the signal) as well as for the power savings involved. Normally, a current relay also detects the current flowing in the signal lamp in its different states, and this allows detection of a failed lamp. (Even in the days of kerosene lamps for signals, a bimetallic thermal contact strip was used to detect the heat of the lamp and notify the signalman if the lamp was extinguished.)
ये भी पढ़े – योगासन का इतिहास तथा योग से होने वाले फायदे
Back lights for electric signals today (and small slits in the rear of kerosene-lamp signals in days gone by) allow the signalman or stationmaster to see the states of the signals at a station. Where visibility limits the use of back lights, the signal aspect is repeated in the signal cabin or (at small stations) in the station master’s office.
In the latest instances of signalling control by means of interlinked stations (e.g., Chennai – Washermanpet), failure-detection circuits are provided for each track circuit and signal circuit with notification to the signal control centres in case of problems.
Signal installations are usually powered by independent power supplies (DC) that are driven by battery installations that are charged from the regional grid (state electricity board’s supply). All the failsafe equpment and the signals themselves also have emergency fail-over to backup battery sets that keep the signals and points working in case of power failure. Most stations also have diesel generator sets to continue charging the batteries in case of power failure.
Source – IFRCA.org
Railway Employee (App) | Rail News Center ( App) | Railway Question Bank ( App) | (App) | Information Center ( App) |
This entry was posted in 2 Railway Employee, STUDY NEW, Railway Employee
New Revised Rates of Railway Quarters w.e.f. 1.7.2023
QUESTION PAPER & ANSWER KEY TECH-III/TRD & TECH-III/ELECTRICAL GDCE 31-05-2022
VACANCY NOTICE OF IRCON INTERNATIONAL LIMITED DATED 20.11.2023
QUESTION BANK – SELECTION OF JE C & W (Carriage & Wagon) (Hindi & English)
रेलगाड़ी टक्कर बचाव प्रणाली (Train Collision Avoidance System)
During October 2023, RPF reunited over 601 children under Operation ‘Nanhe Faristey’
Regarding Admissibility of training allowance to teaching faculty
रनिंग स्टाफ (Running Staff) सबंधित महत्वपूर्ण प्रश्न के उत्तर एवं स्पष्टीकरण
Promotion Order – Sr. Train Manager (Guard) to Sr. Passenger Train Manage Dt 26.7.2023
Railway Board Order Regarding Duty Hours of Running Staff
Shri Ram Karan Yadav takes over as General Manager, Central Railway
Q Paper & Answer AEN (Assistant Engineer) CBT Exam (Hindi/English) Dt 25.06.2023
Duration of Periodical Medical Examination of Non Gazetted Rly Employee (Rule 514 of IRMM Vol – 1)
जानिए पटरियों के साइड में क्यों लिखे होते हैं नंबर?
KNOW ABOUT – SPL KINDS OF LEAVE – RAILWAY
सहायक लोको पायलट के कर्तव्य (Duties of Assistant Loco Pilot)
Consolidated Orders of MACP Scheme by By Personnel Branch BZA Division
Duties & Responsibilities of Nursing Sister, Staff Nurse & Midwife
NPS – Important initiatives for Central Government employee
प्वाइंटसमेन की ड्यूटी लिस्ट ( list of Pointsman Duty)
GDCE Exam Quota Recruitment Process & Syllabus (ALP & TECHNICIANS POSTS)
गंभीर रोगियों को ट्रेन किराए में 75% तक का डिस्काउंट
Question Paper Ticket Examiner in Level-2 PR Quota 33 1/3% Commercial Department Dated 10.10.2021
QUESTION PAPER & ANSWER KEY TECH-III/TRD & TECH-III/ELECTRICAL GDCE 31-05-2022
Frequently asked Question (FAQ) On Privilege ePass / PTO
Question Paper With Answer of Chief Loco Inspector in Level 7 (ER) dt 08-09-2019
Question Paper & Answer – Goods Guard Selection Exam dt. 28.08.2022
Q PAPER – SELECTION OF STAFF & WELFARE INSPECTOR – SWR – 2011
राजभाषा पर विभागीय परीक्षा के लिए उपयोगी प्रश्नोतर
APPLICATION FORM FOR (I) INTER RAILWAY (II) INTER DIVISIONAL/ DEPARTMENTAL TRANSFER (III) DEPUTATION
APPLICATION FORM FOR (I) INTER RAILWAY (II) INTER DIVISIONAL/ DEPARTMENTAL TRANSFER (III) DEPUTATION
गंभीर रोगियों को ट्रेन किराए में 75% तक का डिस्काउंट
गुड/वैरी-गुड के चक्कर में फसेंगे कर्मी…. Chamchagiri Bahot Jaruri Hai
Post Retirement Complementary Passes For Railway Employees – Revised Entitlement
Clarification on Promotion Effecting Reservation (RBE 91/2018 dated 19.06.18)
Refund Rules of Unreserved & Reserved Tickets of Indian Railway
Good News – Modification of Recruitment Rule of Train Manager (Guard)
रेलवे के साफ्टवेयर में सेंध कर फर्जीवाड़ा
Vacancy Notification – Filling up of Various Ex-cadre posts of IRIEEN, Nashik road
Regarding Minimum Service Conditions For GDCE (General Departmental Competitive Examination )
Syllabus – Section Controller (Traffic)
Materials Management on Indian Railways (English)
Trouble Shooting -SUB SYSTEM – 19 TRAIN BUS- ACT (RS) – ABB Loco (English) (Part – B)
रेलवे में पति-पत्नी एक जगह होंगे तैनात
Are you sure you want to delete this element?
Close